WGU C215 |PA|PRE-ASSESSMENT PVDC| EXAM
Correct 70
Incorrect 00
Term
requirements in an industry scenario?
, Project process
Overview plan
Batch process
Don't know?
2 of 70
Term
What is the measure of how much supply chain is owned or
operated by the manufacturer?
Give this one a try later!
Horizontal benchmarking Vertical integration
Backward integration Horizontal integration
Don't know?
3 of 70
Term
A construction company produces furnished pre-fabricated
manufactured homes. The production manager has discovered the
following challenges within one of the facilities:
- Production qualities are low and only a small number of homes are
built efficiently
,- The facility space allows for low handling of materials
- There is limited space available for employees to operate
Which hybrid layout should be used to address the company's
needs?
Give this one a try later!
Capacity planning Group technology
Enhance competition; understand
They may have suggestions for
consumer preferences; maintain
improving the operation.
communication with operations
Don't know?
4 of 70
Term
Which factor determines how long it takes a qualified operator to
perform a duty of the job requirements under the assumption that
the operator is working at a sustainable pace with the proper tools
for the process?
Give this one a try later!
Delay time Standard time
, Eastern time Pessimistic time
Don't know?
5 of 70
Term
A company manufactures shoes using a quality management system.
The company needs to put a process in place to measure any
defects. The company would like to measure the number of defects
and observe the number of occurrences to isolate the particular
defect.
Which quality tool should the company use to focus on correcting
this particular issue?
Give this one a try later!
Control Chart Attribute Listing
Histogram Checklist
Don't know?
Correct 70
Incorrect 00
Term
requirements in an industry scenario?
, Project process
Overview plan
Batch process
Don't know?
2 of 70
Term
What is the measure of how much supply chain is owned or
operated by the manufacturer?
Give this one a try later!
Horizontal benchmarking Vertical integration
Backward integration Horizontal integration
Don't know?
3 of 70
Term
A construction company produces furnished pre-fabricated
manufactured homes. The production manager has discovered the
following challenges within one of the facilities:
- Production qualities are low and only a small number of homes are
built efficiently
,- The facility space allows for low handling of materials
- There is limited space available for employees to operate
Which hybrid layout should be used to address the company's
needs?
Give this one a try later!
Capacity planning Group technology
Enhance competition; understand
They may have suggestions for
consumer preferences; maintain
improving the operation.
communication with operations
Don't know?
4 of 70
Term
Which factor determines how long it takes a qualified operator to
perform a duty of the job requirements under the assumption that
the operator is working at a sustainable pace with the proper tools
for the process?
Give this one a try later!
Delay time Standard time
, Eastern time Pessimistic time
Don't know?
5 of 70
Term
A company manufactures shoes using a quality management system.
The company needs to put a process in place to measure any
defects. The company would like to measure the number of defects
and observe the number of occurrences to isolate the particular
defect.
Which quality tool should the company use to focus on correcting
this particular issue?
Give this one a try later!
Control Chart Attribute Listing
Histogram Checklist
Don't know?