WGU C215 |OA| OBJECTIVE ASSESSMENT
EXAM
Total Quality Management (TQM) Philosophy - Correct Answers -1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality
Process Capability Index (Cpk) - Correct Answers -Basic function of Six Sigma.
Measures the process potential and performance of processes. The higher the range of
Cpk, the improved is the ability of the process to complete its necessities.
Six Sigma - Correct Answers -A disciplined, data-driven approach and methodology for
eliminating defects (driving toward six standard deviations between the mean and the
nearest specification limit) in any process - from manufacturing to transactional and
from product to service.
Design Capacity - Correct Answers -The theoretical maximum output of a system in a
given period under ideal conditions.
Location Analysis - Correct Answers -proximity to customers, transportation, source of
labor, community attitude, proximity to suppliers, and many other factors.
The technique for determining location decisions.
Line Processes - Correct Answers -A type of process used to produce a large volume of
a standardized product.
■ Limited customization and high volume
Batch Processes - Correct Answers -A type of process used to produce a small number
of products in groups or batches based on customer orders or specifications.
■ High customization moderate volume
Project Processes - Correct Answers -A type of process used to make a one-at-a-time
product exactly to customer specifications.
,■ Most custom and lowest volume
Continuous Processes - Correct Answers -A type of process that operates continually to
produce a high volume of a fully standardized product.
- No customization and as high a volume as possible
Bottleneck - Correct Answers -Longest task in the process.
Flexible Manufacturing System (FMS) - Correct Answers -A type of automated system
that combines the flexibility of intermittent operations with the efficiency of continuous
operations.
Output/Input Control - Correct Answers -A technique for monitoring the flow of jobs
between work centers.
Value-Added - Correct Answers -The net increase created during the transformation of
inputs into final outputs.
Hybrid Layouts - Correct Answers -Layouts that combine characteristics of process and
product layouts.
- Group technology layouts.
- Cell technology layouts.
- Grocery stores use hybrid layouts
Relationship Chart (REL) - Correct Answers -Table that reflects opinions of managers
with regard to the importance of having any two departments close together.
Rectilinear Distance - Correct Answers -The shortest distance between two locations
using north-south and east-west movements.
From-To Matrix - Correct Answers -Table that gives the number of trips or units of
product moved between any pair of departments.
Block Plan - Correct Answers -Schematic showing the placement of resources in a
facility.
Mean Observed Times - Correct Answers -The average of the observation times for
each of the work elements.
Normal Time - Correct Answers -The mean observed time multiplied by the
performance rating factor by the frequency of occurrence.
, Standard Time - Correct Answers -The length of time it should take a qualified worker
using appropriate process and tools to complete a specific job, allowing time for
personal fatigue and unavoidable delays.
Just-in-Time (JIT) - Correct Answers -A philosophy designed to achieve high-volume
production through elimination of waste and continuous improvement. Based on a "pull"
system rather than a "push" system. The three elements are just-in-time manufacturing,
total quality management, and respect for people.
Kanban card - Correct Answers -A card that specifies the exact quantity of product that
needs to be produced.
Tier One Suppliers - Correct Answers -Supplies materials or services directly to the
processing facility.
These are the suppliers that put products in specific containers or packages.
Internal Functions companies
Tier Two Suppliers - Correct Answers -Directly supplies materials or services to a tier-
one supplier in the supply chain.
Suppliers of the specialty materials for the tier one suppliers to be able to produce the
packaging necessary for different products.
Think cardboard, plastic, glass, chemicals.
Tier Three Suppliers - Correct Answers -Directly supplies materials or services to a tier
two supplier in the supply chain.
These are companies that extract raw materials.
Oil, raw chemical materials, wood.
Capacity Requirements Planning (CRP) - Correct Answers -Determines the labor and
machine resources needed to fill the open and planned orders generated by the MRP.
Basically, checking if there is enough work scheduled for operations
Enterprise Resource Planning (ERP) - Correct Answers -Large software programs used
for planning and coordinating all resources throughout the entire enterprise.
Aggregate Plans - IN A BROAD SENSE - Correct Answers -Includes the budgeted
levels of finished products, inventory, backlogs, workforce size, and aggregate
production rate needed to support the marketing plan.
EXAM
Total Quality Management (TQM) Philosophy - Correct Answers -1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality
Process Capability Index (Cpk) - Correct Answers -Basic function of Six Sigma.
Measures the process potential and performance of processes. The higher the range of
Cpk, the improved is the ability of the process to complete its necessities.
Six Sigma - Correct Answers -A disciplined, data-driven approach and methodology for
eliminating defects (driving toward six standard deviations between the mean and the
nearest specification limit) in any process - from manufacturing to transactional and
from product to service.
Design Capacity - Correct Answers -The theoretical maximum output of a system in a
given period under ideal conditions.
Location Analysis - Correct Answers -proximity to customers, transportation, source of
labor, community attitude, proximity to suppliers, and many other factors.
The technique for determining location decisions.
Line Processes - Correct Answers -A type of process used to produce a large volume of
a standardized product.
■ Limited customization and high volume
Batch Processes - Correct Answers -A type of process used to produce a small number
of products in groups or batches based on customer orders or specifications.
■ High customization moderate volume
Project Processes - Correct Answers -A type of process used to make a one-at-a-time
product exactly to customer specifications.
,■ Most custom and lowest volume
Continuous Processes - Correct Answers -A type of process that operates continually to
produce a high volume of a fully standardized product.
- No customization and as high a volume as possible
Bottleneck - Correct Answers -Longest task in the process.
Flexible Manufacturing System (FMS) - Correct Answers -A type of automated system
that combines the flexibility of intermittent operations with the efficiency of continuous
operations.
Output/Input Control - Correct Answers -A technique for monitoring the flow of jobs
between work centers.
Value-Added - Correct Answers -The net increase created during the transformation of
inputs into final outputs.
Hybrid Layouts - Correct Answers -Layouts that combine characteristics of process and
product layouts.
- Group technology layouts.
- Cell technology layouts.
- Grocery stores use hybrid layouts
Relationship Chart (REL) - Correct Answers -Table that reflects opinions of managers
with regard to the importance of having any two departments close together.
Rectilinear Distance - Correct Answers -The shortest distance between two locations
using north-south and east-west movements.
From-To Matrix - Correct Answers -Table that gives the number of trips or units of
product moved between any pair of departments.
Block Plan - Correct Answers -Schematic showing the placement of resources in a
facility.
Mean Observed Times - Correct Answers -The average of the observation times for
each of the work elements.
Normal Time - Correct Answers -The mean observed time multiplied by the
performance rating factor by the frequency of occurrence.
, Standard Time - Correct Answers -The length of time it should take a qualified worker
using appropriate process and tools to complete a specific job, allowing time for
personal fatigue and unavoidable delays.
Just-in-Time (JIT) - Correct Answers -A philosophy designed to achieve high-volume
production through elimination of waste and continuous improvement. Based on a "pull"
system rather than a "push" system. The three elements are just-in-time manufacturing,
total quality management, and respect for people.
Kanban card - Correct Answers -A card that specifies the exact quantity of product that
needs to be produced.
Tier One Suppliers - Correct Answers -Supplies materials or services directly to the
processing facility.
These are the suppliers that put products in specific containers or packages.
Internal Functions companies
Tier Two Suppliers - Correct Answers -Directly supplies materials or services to a tier-
one supplier in the supply chain.
Suppliers of the specialty materials for the tier one suppliers to be able to produce the
packaging necessary for different products.
Think cardboard, plastic, glass, chemicals.
Tier Three Suppliers - Correct Answers -Directly supplies materials or services to a tier
two supplier in the supply chain.
These are companies that extract raw materials.
Oil, raw chemical materials, wood.
Capacity Requirements Planning (CRP) - Correct Answers -Determines the labor and
machine resources needed to fill the open and planned orders generated by the MRP.
Basically, checking if there is enough work scheduled for operations
Enterprise Resource Planning (ERP) - Correct Answers -Large software programs used
for planning and coordinating all resources throughout the entire enterprise.
Aggregate Plans - IN A BROAD SENSE - Correct Answers -Includes the budgeted
levels of finished products, inventory, backlogs, workforce size, and aggregate
production rate needed to support the marketing plan.