The law that set into place stormwater regulations in the 1970s is The Clean Water Act
Regulations for managing stormwater activity on a construction site are outlined in the
NPDES (National Pollutant Discharge Elimination System)
When should you read and understand your project stormwater pollution prevention plan
Immediately after the project awarded and before you begin any site work is
Which of the following is not an allowable stormwater discharge or non-stormwater discharge?
Contaminated Groundwater
Construction activity may begin When the jurisdiction of operation specifies you can start
Waters that sell anti-degration standards are placed on the _______ list 303D
SWPP certifications are signed by An officer of the project owner or an officer of the general
contractor.
TRUE OR FALSE: The document that must be completed signed and submitted to the state to
obtain authorization to discharge is the NOT False
The notice of termination can be filed when All construction inside and outside of the
building is completed and the final stabilization has been verified as complete
Operators on a construction site are the entity in charge of plans and specifications and the
entity who is Is in charge of daily activities
, You should have a SWPPP for your construction site because (3 reasons) 1. Its documents
stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
A well constructed SWPPP for your site should be Site specific
The NO must be submitted Prior to you commencing construction
One necessary component of a good SWPPP is A schedule of activities
Factors that may impact the SWPPP scheduling activities include Weather and climate
Pollutant sources on a construction site may include (3) 1. petroleum storage tanks
2. Masonry material
3. soil amendment
The following considerations may be incorporatedd into SWPPP Endangered species and
historical preservation
If you beileve BMP modifications are necessary onsite you must, Seek written approval of
the project SWPPP designer and project owner
The SWPPP will contain the following (3) 1. Erosion and sediment control bet management
practices
2. A site specific sequence of construction activiites
3. site maps
Experts|2025/2026 Latest Update
The law that set into place stormwater regulations in the 1970s is The Clean Water Act
Regulations for managing stormwater activity on a construction site are outlined in the
NPDES (National Pollutant Discharge Elimination System)
When should you read and understand your project stormwater pollution prevention plan
Immediately after the project awarded and before you begin any site work is
Which of the following is not an allowable stormwater discharge or non-stormwater discharge?
Contaminated Groundwater
Construction activity may begin When the jurisdiction of operation specifies you can start
Waters that sell anti-degration standards are placed on the _______ list 303D
SWPP certifications are signed by An officer of the project owner or an officer of the general
contractor.
TRUE OR FALSE: The document that must be completed signed and submitted to the state to
obtain authorization to discharge is the NOT False
The notice of termination can be filed when All construction inside and outside of the
building is completed and the final stabilization has been verified as complete
Operators on a construction site are the entity in charge of plans and specifications and the
entity who is Is in charge of daily activities
, You should have a SWPPP for your construction site because (3 reasons) 1. Its documents
stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
A well constructed SWPPP for your site should be Site specific
The NO must be submitted Prior to you commencing construction
One necessary component of a good SWPPP is A schedule of activities
Factors that may impact the SWPPP scheduling activities include Weather and climate
Pollutant sources on a construction site may include (3) 1. petroleum storage tanks
2. Masonry material
3. soil amendment
The following considerations may be incorporatedd into SWPPP Endangered species and
historical preservation
If you beileve BMP modifications are necessary onsite you must, Seek written approval of
the project SWPPP designer and project owner
The SWPPP will contain the following (3) 1. Erosion and sediment control bet management
practices
2. A site specific sequence of construction activiites
3. site maps