logo-home

All 5 results

Sort by:

Best selling Unit 7 - Business Operations in Engineering notes

Test Bank For Construction Project Administration 10th Edition By Fisk
  • Exam (elaborations)

    Test Bank For Construction Project Administration 10th Edition By Fisk

  • CHAPTER 1 ANSWERS 1. Project time, cost, and quality 2. Professional Construction Manager (under direct contract with the Owner as the Owner’s representative) 3. Either the planning or the conceptual phase 4. Any of the listed alternatives 5. True (This usually means between the Resident Project Representative and the Contractor’s Superintendent or Project Manager at the site) 6. Working relationships among the parties through a mutually-developed, formal strategy of commitment and co...
  • Popular
    ExamsExpert
    £20.99 More Info
WGU C215 Q Bank For CPHQ Practice Questions And Answers
  • Exam (elaborations)

    WGU C215 Q Bank For CPHQ Practice Questions And Answers

  • 1. TQM: Total Quali- ty Management 2. Customer De- fined Quality 3. Conformance to specification 4. Example of Con- formance to specification is an integrated organizational effort designed to improve quality at every level. TQM is about meeting quality expectations as defined by the customer. measures how well the product or service meets the targets and tolerances determined by its designers. The wait for hotel room service may be specified as 20 minutes, but there may be an acceptable delay...
  • Popular
    YOURVERIFIEDEXAMPLUG
    £11.97 More Info
SOFTWARE ENGINEERING TEST
  • Exam (elaborations)

    SOFTWARE ENGINEERING TEST

  • 1. Generic products Stand-alone systems that are marketed and sold to any customer who wishes to buy them • Examples•PC software such as graphics programs•Pro- ject management tools•CAD software•Software for specif- ic markets such as appointments systems for dentists. 2. Customized products 3. What is soft- ware? 4. What are the at- tributes of good software? 5. What is software engineering? 6. What are the fun- damental soft- ware engineering activities? 7. What is the dif- f...
  • Popular
    YOURVERIFIEDEXAMPLUG
    £11.22 More Info
C215 WGU
  • Exam (elaborations)

    C215 WGU

  • 1. Internal resource constraint 2. Capacity-con- strained 3. Customer Re- lationship Man- agement (CRM) A regular bottleneck Bottleneck caused by inefficient usage Software solutions that enable the firm to collect cus- tomer-specific data 4. allowance factor the amount of time the analyst allows for personal time, fatigue, and unavoidable delays 5. appraisal costs Costs incurred in the process of uncovering defects 6. common Random causes that cannot be identified 7. consumer's ris...
  • Popular
    YOURVERIFIEDEXAMPLUG
    £9.35 More Info
Introduction To Materials Management 8th Edition By Chapman - Test Bank
  • Exam (elaborations)

    Introduction To Materials Management 8th Edition By Chapman - Test Bank

  • INTRODUCTION TO MATERIALS MANAGEMENT CHAPTER 1 ANSWERS TO PROBLEMS 1.1 Sales 100% 100% Cost of manufacturing 60% 50% Other costs 30% Profit (percent of Sales) Therefore a 10% reduction in the cost of manufacturing would produce a 100% increase in profit. 1.2 Profit = Sales – (direct costs + overhead) 0.20 = Sales – (0.60 × Sales + 0.30) Sales = 0.5 = 1.25 = 125% 0.4 To increase profits from 10% to 20% takes a 25% increase in sales but only a 10% decrease in costs. Good materials ma...
  • Popular
    ExamsExpert
    £25.59 More Info

Newest Unit 7 - Business Operations in Engineering summaries

Test Bank For Construction Project Administration 10th Edition By Fisk
  • Exam (elaborations)

    Test Bank For Construction Project Administration 10th Edition By Fisk

  • CHAPTER 1 ANSWERS 1. Project time, cost, and quality 2. Professional Construction Manager (under direct contract with the Owner as the Owner’s representative) 3. Either the planning or the conceptual phase 4. Any of the listed alternatives 5. True (This usually means between the Resident Project Representative and the Contractor’s Superintendent or Project Manager at the site) 6. Working relationships among the parties through a mutually-developed, formal strategy of commitment and co...
  • New
    ExamsExpert
    £20.99 More Info
Introduction To Materials Management 8th Edition By Chapman - Test Bank
  • Exam (elaborations)

    Introduction To Materials Management 8th Edition By Chapman - Test Bank

  • INTRODUCTION TO MATERIALS MANAGEMENT CHAPTER 1 ANSWERS TO PROBLEMS 1.1 Sales 100% 100% Cost of manufacturing 60% 50% Other costs 30% Profit (percent of Sales) Therefore a 10% reduction in the cost of manufacturing would produce a 100% increase in profit. 1.2 Profit = Sales – (direct costs + overhead) 0.20 = Sales – (0.60 × Sales + 0.30) Sales = 0.5 = 1.25 = 125% 0.4 To increase profits from 10% to 20% takes a 25% increase in sales but only a 10% decrease in costs. Good materials ma...
  • New
    ExamsExpert
    £25.59 More Info
SOFTWARE ENGINEERING TEST
  • Exam (elaborations)

    SOFTWARE ENGINEERING TEST

  • 1. Generic products Stand-alone systems that are marketed and sold to any customer who wishes to buy them • Examples•PC software such as graphics programs•Pro- ject management tools•CAD software•Software for specif- ic markets such as appointments systems for dentists. 2. Customized products 3. What is soft- ware? 4. What are the at- tributes of good software? 5. What is software engineering? 6. What are the fun- damental soft- ware engineering activities? 7. What is the dif- f...
  • New
    YOURVERIFIEDEXAMPLUG
    £11.22 More Info
C215 WGU
  • Exam (elaborations)

    C215 WGU

  • 1. Internal resource constraint 2. Capacity-con- strained 3. Customer Re- lationship Man- agement (CRM) A regular bottleneck Bottleneck caused by inefficient usage Software solutions that enable the firm to collect cus- tomer-specific data 4. allowance factor the amount of time the analyst allows for personal time, fatigue, and unavoidable delays 5. appraisal costs Costs incurred in the process of uncovering defects 6. common Random causes that cannot be identified 7. consumer's ris...
  • New
    YOURVERIFIEDEXAMPLUG
    £9.35 More Info
WGU C215 Q Bank For CPHQ Practice Questions And Answers
  • Exam (elaborations)

    WGU C215 Q Bank For CPHQ Practice Questions And Answers

  • 1. TQM: Total Quali- ty Management 2. Customer De- fined Quality 3. Conformance to specification 4. Example of Con- formance to specification is an integrated organizational effort designed to improve quality at every level. TQM is about meeting quality expectations as defined by the customer. measures how well the product or service meets the targets and tolerances determined by its designers. The wait for hotel room service may be specified as 20 minutes, but there may be an acceptable delay...
  • New
    YOURVERIFIEDEXAMPLUG
    £11.97 More Info
Make study stress less painful
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your revision notes too and start uploading now.