RVTI - PDI Flashcards Exam Questions With
Correct Answers
Propane |- |Preparing |to |Run |Propane |Test |- |CORRECT |ANSWER✔✔-Step |1: |Verify |Propane |in |
container |- |briefly |open |outage |valve |and |listen |for |release |of |vapor
Propane |- |Setting |the |Pressure |- |CORRECT |ANSWER✔✔-Step |1: |Connect |a |calibrated |
manometer- |connect |manometer |to |barbed |fitting
Propane |- |Lockup |Pressure |Test |- |CORRECT |ANSWER✔✔-Step |1: |Prepare |for |and |perform |lock |
up |test |- |close |the |orifice |valve |on |test |apparatus |while |watching |manometer |measurement.
Propane |- |Timed |Pressure |Drop |Test |- |CORRECT |ANSWER✔✔-Step |1: |Prepare |for |times |
pressure |drop |test |- |close |the |service |valve |fully
Propane |- |Bubble |Solution |Test |- |CORRECT |ANSWER✔✔-Step |1: |Perform |bubble |test |- |open |
service |valve |and |bubble |test |all |fittings |that |had |been |removed |and |reinstalled |during |test |
procedures |using |detection |solution
Water |- |Fresh |Water |System |- |CORRECT |ANSWER✔✔-Step |1: |Pump |strainer |- |inspect |water |
pump |strainer, |clean |if |'tank |trash' |is |visible
Water |- |Leak |Test |- |CORRECT |ANSWER✔✔-Step |1: |Leak |Test |- |turn |off |the |city |water
Water |- |Fixture |Flow |Test |- |CORRECT |ANSWER✔✔-Step |1: |Level |RV |- |Orient |RV |into |level |
position
, Electric |- |Battery |Inspection |- |CORRECT |ANSWER✔✔-Step |1: |Battery |Box |- |Confirm |battery |is |
vapor |tight |from |the |inside |of |the |RV |and |properly |vented
Electric |- |Converter |Output |Circuits |- |CORRECT |ANSWER✔✔-Step |1: |Fuses |and |Circuit |Breaker
|- |visually |inspect |fuses |or |circuit |breakers
Electric |- |Power |Converters |- |CORRECT |ANSWER✔✔-Step |1: |Documentation |and |Prepare |- |
Assemble |documentation |and |plug |coach |into |AC |power |source
Electric |- |Parallel |Battery |Bank |- |CORRECT |ANSWER✔✔-Step |1: |Configure |batteries |on |test |
bench |- |batteries |properly |oriented; |positive |and |negative
Electric |- |Safety |Ground |Conductor |Continuity |- |CORRECT |ANSWER✔✔-Step |1: |Access |Shore |
Cord
Electric |- |Hot |Skin |Test |- |CORRECT |ANSWER✔✔-Step |1: |Preparation |for |the |Test |- |Assembled |
documentation |for |performing |HST
Step |2: |Voltage |at |Source |and |Polarity |- |Measured |voltage |at |source |before |plugging |in
Electric |- |Receptacle |Test |- |CORRECT |ANSWER✔✔-Set |DMM |- |Set |DMM |to |AC |voltage
Electric |- |GFCI |Test |- |CORRECT |ANSWER✔✔-Step |1: |Preparation |for |the |Test |- |assemble |
documentation |for |performing |GFCI |test; |verify |coach |is |plugged |in
Step |2: |initiate |fault |- |using |UFCI |tester, |initiate |a |leak |to |trip |the |circuit
Electric |- |Polarity |Test |- |CORRECT |ANSWER✔✔-Step |1: |Preparation |for |Test |- |assemble |
documentation |for |performing |Polarity |test
Step |2: |Test |Process |- |insert |a |circuit |tester |into |the |opening |of |all |receptacles; |interpret |
reading |for |results
Correct Answers
Propane |- |Preparing |to |Run |Propane |Test |- |CORRECT |ANSWER✔✔-Step |1: |Verify |Propane |in |
container |- |briefly |open |outage |valve |and |listen |for |release |of |vapor
Propane |- |Setting |the |Pressure |- |CORRECT |ANSWER✔✔-Step |1: |Connect |a |calibrated |
manometer- |connect |manometer |to |barbed |fitting
Propane |- |Lockup |Pressure |Test |- |CORRECT |ANSWER✔✔-Step |1: |Prepare |for |and |perform |lock |
up |test |- |close |the |orifice |valve |on |test |apparatus |while |watching |manometer |measurement.
Propane |- |Timed |Pressure |Drop |Test |- |CORRECT |ANSWER✔✔-Step |1: |Prepare |for |times |
pressure |drop |test |- |close |the |service |valve |fully
Propane |- |Bubble |Solution |Test |- |CORRECT |ANSWER✔✔-Step |1: |Perform |bubble |test |- |open |
service |valve |and |bubble |test |all |fittings |that |had |been |removed |and |reinstalled |during |test |
procedures |using |detection |solution
Water |- |Fresh |Water |System |- |CORRECT |ANSWER✔✔-Step |1: |Pump |strainer |- |inspect |water |
pump |strainer, |clean |if |'tank |trash' |is |visible
Water |- |Leak |Test |- |CORRECT |ANSWER✔✔-Step |1: |Leak |Test |- |turn |off |the |city |water
Water |- |Fixture |Flow |Test |- |CORRECT |ANSWER✔✔-Step |1: |Level |RV |- |Orient |RV |into |level |
position
, Electric |- |Battery |Inspection |- |CORRECT |ANSWER✔✔-Step |1: |Battery |Box |- |Confirm |battery |is |
vapor |tight |from |the |inside |of |the |RV |and |properly |vented
Electric |- |Converter |Output |Circuits |- |CORRECT |ANSWER✔✔-Step |1: |Fuses |and |Circuit |Breaker
|- |visually |inspect |fuses |or |circuit |breakers
Electric |- |Power |Converters |- |CORRECT |ANSWER✔✔-Step |1: |Documentation |and |Prepare |- |
Assemble |documentation |and |plug |coach |into |AC |power |source
Electric |- |Parallel |Battery |Bank |- |CORRECT |ANSWER✔✔-Step |1: |Configure |batteries |on |test |
bench |- |batteries |properly |oriented; |positive |and |negative
Electric |- |Safety |Ground |Conductor |Continuity |- |CORRECT |ANSWER✔✔-Step |1: |Access |Shore |
Cord
Electric |- |Hot |Skin |Test |- |CORRECT |ANSWER✔✔-Step |1: |Preparation |for |the |Test |- |Assembled |
documentation |for |performing |HST
Step |2: |Voltage |at |Source |and |Polarity |- |Measured |voltage |at |source |before |plugging |in
Electric |- |Receptacle |Test |- |CORRECT |ANSWER✔✔-Set |DMM |- |Set |DMM |to |AC |voltage
Electric |- |GFCI |Test |- |CORRECT |ANSWER✔✔-Step |1: |Preparation |for |the |Test |- |assemble |
documentation |for |performing |GFCI |test; |verify |coach |is |plugged |in
Step |2: |initiate |fault |- |using |UFCI |tester, |initiate |a |leak |to |trip |the |circuit
Electric |- |Polarity |Test |- |CORRECT |ANSWER✔✔-Step |1: |Preparation |for |Test |- |assemble |
documentation |for |performing |Polarity |test
Step |2: |Test |Process |- |insert |a |circuit |tester |into |the |opening |of |all |receptacles; |interpret |
reading |for |results