WMGT 101-22A EXAM 3 QUESTIONS AND ANSWERS 100% PASS AFI 10-245, Antiterrorism - ANS CE shall: have at least 1 engineer at each base must complete Security Eng AT Planning & Design Course, review, document, and track construction projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism Officer Antiterrorism Requirement Planning - ANS 1. UFC 4-020-01 2. Is only the minimum standard required? 3. Yes: construction standoff distance available? No: UFC 4-020-02 and support manuals 4. If standoff distance is available, apply UFC 4-010-01 and support manuals Design Basis Threat (DBT) - ANS Baseline threat used in the design of protective measures Initial DBT - ANS Based on planning team, local intel and Geographic Combatant Command (COCOM) Theater-Wide threat assessments Modify Initial DBT - ANS Local threat assessments Level of Protection - ANS The degree to which an asset is protected, defines the amount of damage a facility or asset can sustain during an attack ©THESTAR 2025 ALL RIGHTS RESERVED LOP: Very low - ANS Progressive collapse is unlikely, but space in and around damaged area will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled into the building and cause serious injuries. Doors may be propelled into rooms, presenting serious hazards. LOP: Low - ANS Building will not be economically repairable and space in and around damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture and may come out of the frame, but does not present a significant injury hazard. Doors may fail but present minimal hazards. LOP: Medium - ANS Minor damage, space in and around damaged area can be used and will be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame. Doors may stay in frames but will not be reusable. LOP: High - ANS Minimal to no damage with no permanent definitions. Glazing will not break. Doors will be reusable. UFC 4-010-01 - ANS DoD minimum antiterrorism standards for buildings. Intent is to reduce mass casualties, minimize collateral damage to nearby facilities, and facilitate future upgrades and increases FPCON. UFC 4-020-01 - ANS DoD Security Engineering Facility Planning Manual. Acts as a starting point for Garrison Antiterrorism and a quantitative risk-based model. Uses scoring model to evaluate asset value (0-1.0), threat likelihood (0-1.0), and use of minimum AT standards (<0.5). Includes cost data and helps establish a DBT and required LOP. AT/FP misconceptions - ANS 1. Bollards, fences, curbs, and barriers are and adequate substitution for standoff 2. Existing roads must be moved away from existing buildings 3. All building require standoff Mandatory design standards - ANS Standard 1: Standoff distance Standard 6: Progressive collapse

Mostrar más Leer menos
Institución
WMGT 101-22A
Grado
WMGT 101-22A









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WMGT 101-22A
Grado
WMGT 101-22A

Información del documento

Subido en
12 de mayo de 2025
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©THESTAR 2025 ALL RIGHTS RESERVED




WMGT 101-22A EXAM 3 QUESTIONS
AND ANSWERS 100% PASS


AFI 10-245, Antiterrorism - ANS CE shall: have at least 1 engineer at each base must
complete Security Eng AT Planning & Design Course, review, document, and track construction
projects AT compliance, provide vulnerability assessment protection option program (VAPO)
analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism
Officer


Antiterrorism Requirement Planning - ANS 1. UFC 4-020-01
2. Is only the minimum standard required?
3. Yes: construction standoff distance available?
No: UFC 4-020-02 and support manuals
4. If standoff distance is available, apply UFC 4-010-01 and support manuals


Design Basis Threat (DBT) - ANS Baseline threat used in the design of protective measures


Initial DBT - ANS Based on planning team, local intel and Geographic Combatant Command
(COCOM) Theater-Wide threat assessments


Modify Initial DBT - ANS Local threat assessments


Level of Protection - ANS The degree to which an asset is protected, defines the amount of
damage a facility or asset can sustain during an attack

, ©THESTAR 2025 ALL RIGHTS RESERVED

LOP: Very low - ANS Progressive collapse is unlikely, but space in and around damaged area
will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled into the
building and cause serious injuries. Doors may be propelled into rooms, presenting serious
hazards.


LOP: Low - ANS Building will not be economically repairable and space in and around
damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture
and may come out of the frame, but does not present a significant injury hazard. Doors may fail
but present minimal hazards.


LOP: Medium - ANS Minor damage, space in and around damaged area can be used and will
be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame.
Doors may stay in frames but will not be reusable.


LOP: High - ANS Minimal to no damage with no permanent definitions. Glazing will not
break. Doors will be reusable.


UFC 4-010-01 - ANS DoD minimum antiterrorism standards for buildings. Intent is to reduce
mass casualties, minimize collateral damage to nearby facilities, and facilitate future upgrades
and increases FPCON.


UFC 4-020-01 - ANS DoD Security Engineering Facility Planning Manual. Acts as a starting
point for Garrison Antiterrorism and a quantitative risk-based model. Uses scoring model to
evaluate asset value (0-1.0), threat likelihood (0-1.0), and use of minimum AT standards (<0.5).
Includes cost data and helps establish a DBT and required LOP.


AT/FP misconceptions - ANS 1. Bollards, fences, curbs, and barriers are and adequate
substitution for standoff
2. Existing roads must be moved away from existing buildings
3. All building require standoff


Mandatory design standards - ANS Standard 1: Standoff distance
Standard 6: Progressive collapse
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar Florida State University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
611
Miembro desde
2 año
Número de seguidores
179
Documentos
24416
Última venta
3 días hace
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

122 reseñas

5
58
4
22
3
21
2
4
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes