BUS 430 Management Quiz 2021 |BUS430 Management Quiz - 100%
BUS 430 Management Quiz 2021 – 100% Score User USER 1 Course Test Started Operations Management Quiz Chapters 8 & 9 11/12/21 Submitted 11:48AM Due Date 11/15/21 9:00AM Status Completed Attempt 40 out of 40 points Score Time 1 hour, 13 minutes out of 2 hours Elapsed Instructions This quiz consists of 30 multiple-choice questions. The first 10 questions cover the material in Chapter 8. The second 20 questions cover the material in Chapter 9. Be sure you are in the correct Chapter when you take the quiz. Results SubmittedAnswers, CorrectAnswers, Feedback Displayed Question 1 2 out of 2 points An assembly line with 28 operations is to be balanced. The total amount of time required for all 28 operations is 39 minutes. The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes. The line will operate for 450 minutes per day. 1. Determine the minimum and maximum cycle time. 2. What is the output rate if the cycle time is set at 2.2 minutes? SelectedAnswer: min cycle time = 0.8; max cycle time = 39; output rate = 204.5 CorrectAnswer: ,e; min cycle time = 0.8; max cycle time = 39; output rate = 204.5 Question 2 2 out of 2 points is vertical expansion of job duties to give the worker more responsibility. SelectedAnswer: & Job enrichment CorrectAnswer: e, Job enrichment A WEEK 6 > USER1 53 ..., Question 3 2 out of 2 points Which one of the following fits best with process layout? Selected Answer: 0 Skilled workers Correct Answer: & Skilled workers Question 4 2 out of 2 points A layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or the delivery of a service. Selected Answer: e, Product Correct Answer: e, Product Question 5 2 out of 2 points The determination of specific job tasks and responsibilities is called . Selected Answer: & Job design Correct Answer: e, Job design Question 6 2 out of 2 points For a given cycle time in line balancing, assembly-line efficiency can be increased by Selected Answer:
Libro relacionado
Escuela, estudio y materia
Información del documento
- Subido en
- 30 de noviembre de 2021
- Número de páginas
- 27
- Escrito en
- 2021/2022
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
bus 430 management quiz 2021 strayer university
-
an assembly line with 28 operations is to be balanced the total amount of time required for all 28 operations is 39 minutes the longest operation ta