During crane assembly/disassembly, the operator must identify if he/she can get within how many feet from a power line up to 350Kv? - 20 ft.

During each shift, the operator shall visibly inspect: - Control mechanisms, wire rope, hooks and latches

A frequent inspection are to be documented monthly and retention of records for how long? - 3 months

Most crane manufacturers require what percentage of reduction to load chart during high winds? - 50%

Cranes not in regular use that are idle for 3 m...