logo-home

YOU

I know how frustrating it can get with all those assignments mate.



Nursing Being my main profession line, i have essential guides that are A graded, I am a very friendly person so don

Community

  • Seguidores
  • Siguiendo

4 Comentarios recibidos

268 artículos

TOWER CRANE QUESTIONS AND ANSWERS 2025

(1)
$14.49
1x  vendido

Which of the following OSHA regulations govern suspended personnel platforms? - ANSWER OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - ANSWER 15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - ANSWER 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is - ANSWER 5 to 1 According to ASME B30.3 Load hoist ropes that are not rotation ...

i x
  •  Package deal
  • Examen
  •  • 12 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x

NCCCO RIGGER 1 STUDY QUESTIONS AND ANSWERS 2025

(0)
$13.99
0x  vendido

1. A wire rope that is a 6x19 classification could have how many wires per strand? - ANSWER 15 through 26 wires per strand 2. How often should a synthetic web sling be inspected? - ANSWER Each day before use 3. Which considerations should be given to suspend lifting operations with a mobile crane? - ANSWER Winds in excess of 35 mph 4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - ANSWER Abrasion 5. Which of the following defects disco...

i x
  •  Package deal
  • Examen
  •  • 6 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x

NCCCO 5 ONES I MISSED QUESTIONS AND ANSWERS 2025

(0)
$15.99
0x  vendido

Which of the following OSHA regulations governs suspended personnel platforms - ANSWER OSHA 1926. 1431 According to OSHA 1926.1408 the prohibited zone the powerlines that are 60 KV is - ANSWER 15 ft What percentage of the gross capacity is used when lifting with more than one crane? - ANSWER 75% You are required to pass a physical exam every - ANSWER 3 years How many broken wires at an end socket of a standing wire rope are allowed before the wire rope must be replaced - ANSWER 1 ...

i x
  •  Package deal
  • Examen
  •  • 7 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x

NR503 EPIDEMIOLOGY FINAL, NR 503 EPI FINAL, NR 503 EPI MIDTERM QUESTIONS AND ANSWERS 2025

(0)
$13.99
0x  vendido

Common risk factors - ANSWER unhealthy diet, physical inactivity, tobacco use Childhood risk - ANSWER conditions before birth and early in childhood influence health in adult life. Risk accumulation - ANSWER Ageing is an important marker of the accumulation of modifiable risks for chronic disease Underlying determinants - ANSWER a reflection of the major forces driving social, economic, and cultural change. I.e. globalization, urbanization, population ageing, and general policy environm...

i x
  • Examen
  •  • 20 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x

NCCCO ACRONYMS 11-2025 QUESTIONS AND ANSWERS

(0)
$15.99
0x  vendido

A&L - ANSWER Antenna & Line Specialty: A designation of the NWSA Telecommunication Program ABC - ANSWER Articulating Boom Crane: A designation of the NCCCO Articulating Crane Program ABL - ANSWER Articulating Boom Loader: A designation of the NCCCO Articulating Crane Program ABW - ANSWER Articulating Boom Crane w/ Winch: A designation of the NCCCO Articulating Crane Program AC - ANSWER Administrative Appeals Committee: NCCCO Committee that hears administrative appeals ACMC - ANSWE...

i x
  •  Package deal
  • Examen
  •  • 10 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x

NCCCO LATTICE BOOM GENERAL KNOWLEDGE QUESTIONS AND ANSWERS 2025

(0)
$13.89
0x  vendido

The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - ANSWER 2% The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - ANSWER A. 75% The most unstable working quadrant for a crawler crane is the; - ANSWER Side What type of capacity is listed on a crane load chart? - ANSWER Static If ...

i x
  •  Package deal
  • Examen
  •  • 6 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x

MOBILE CRANE STUDYBOOK QUESTIONS AND ANSWERS 2025

(0)
$10.99
0x  vendido

what are industery standards and osha regulations that cover mobile cranes - ANSWER ASME B30.5 or OSHA subpart cc and 1910.180-pcsa#2 define the term operating radius - ANSWER the horiznal distance from the center of rotation of the crane to center line of hook or center of gravity can a crane be overloaded before any signs of tipping are evident? - ANSWER yes,because the crane could fail in the structral zone of the chart explain the meaning of the bold line or shaded area in the capac...

i x
  •  Package deal
  • Examen
  •  • 2 páginas • 
  • por TargeterWings • 
  • subido  2024
Vista rápida
i x