100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

TOWER CRANE QUESTIONS AND ANSWERS 2025

Puntuación
4.0
(1)
Vendido
1
Páginas
12
Grado
A+
Subido en
05-11-2024
Escrito en
2024/2025

Which of the following OSHA regulations govern suspended personnel platforms? - ANSWER OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - ANSWER 15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - ANSWER 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is - ANSWER 5 to 1 According to ASME B30.3 Load hoist ropes that are not rotation resistant must have a design factor of - ANSWER 5 to 1 The OSHA construction standard for rigging equipment is - ANSWER 1926.251 According to ASME B30.3 on who's recommendations should a preventative maintenance program be set up? - ANSWER Crane manufacturer When using cable or nylon spreaders it is important to remember: - ANSWER The lower the spreader angle the greater the tension According to OSHA when testing a man basket how long must the test pick be maintained? - ANSWER 5 minutes According to ASME B30.3 What is the minimum pitch diameter for load hoisting sheaves? - ANSWER Not less than 18 times rope diameter

Mostrar más Leer menos
Institución
NCCCO Mobile Crane
Grado
NCCCO Mobile Crane









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NCCCO Mobile Crane
Grado
NCCCO Mobile Crane

Información del documento

Subido en
5 de noviembre de 2024
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

TOWER CRANE QUESTIONS AND ANSWERS
2025
Which,of,the,following,OSHA,regulations,govern,suspended,personnel,platforms?,-
,ANSWER,OSHA,1926.1431



According,to,ASME,B30.3,The,prohibited,zone,for,power,lines,that,are,60,kV,is,-,ANSWER,15,ft


According,to,ASME,B30.3,,load,hoist,rotation,resistant,wire,rope,has,a,design,factor,of,-
,ANSWER,5,to,1



According,to,ASME,B30.3,when,Lifting,a,suspended,personnel,platform,design,factor,for,the,riggi
ng,hardware,is,-,ANSWER,5,to,1


According,to,ASME,B30.3,Load,hoist,ropes,that,are,not,rotation,resistant,must,have,a,design,fact
or,of,-,ANSWER,5,to,1


The,OSHA,construction,standard,for,rigging,equipment,is,-,ANSWER,1926.251


According,to,ASME,B30.3,on,who's,recommendations,should,a,preventative,maintenance,progra
m,be,set,up?,-,ANSWER,Crane,manufacturer


When,using,cable,or,nylon,spreaders,it,is,important,to,remember:,-
,ANSWER,The,lower,the,spreader,angle,the,greater,the,tension



According,to,OSHA,when,testing,a,man,basket,how,long,must,the,test,pick,be,maintained?,-
,ANSWER,5,minutes



According,to,ASME,B30.3,What,is,the,minimum,pitch,diameter,for,load,hoisting,sheaves?,-
,ANSWER,Not,less,than,18,times,rope,diameter

, According,to,ASME,B30.3,what,is,the,minimum,pitch,diameter,for,load,block,sheaves?,-
,ANSWER,Not,less,than,16,times,rope,diameter



According,to,ASME,B30.3,what,is,the,minimum,pitch,diameter,for,boom,hoist,sheaves?,-
,ANSWER,Not,less,than,15,times,rope,diameter



According,to,OSHA,when,lifting,personnel,the,cranes,hook,must,be,the,type,that,-
,ANSWER,Can,be,closed,and,locked



According,to,OSHA,when,working,over,water,with,a,man,basket,are,the,people,inside,required,t
o,wear,a,belt/harness?,-,ANSWER,No,harness,or,belt,required


According,to,ASME,B30.3,when,working,near,powerlines,where,should,caution,stickers,be,install
ed?,-,ANSWER,Operator,station,and,at,the,base,of,the,crane


According,to,OSHA,a,frequent,inspection,is:,-,ANSWER,Daily,to,monthly


According,to,OSHA,a,periodic,inspection,is:,-,ANSWER,Monthly,to,annually


Cranes,idle,for,more,than,six,months,must,have,inspections,performed:,-
,ANSWER,Frequent,and,periodic



Cranes,idle,for,less,than,six,months,must,have,inspections,performed:,-,ANSWER,Frequent


Cranes,lifting,personnel,platform,must,have,the,platform,and,rigging,inspected:,-
,ANSWER,Prior,to,each,shift



Crane,hooks,must,not,be,twisted,in,excess,of:,-,ANSWER,10,degrees
$14.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
10 meses hace

4.0

1 reseñas

5
0
4
1
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TargeterWings NURSING
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
19
Miembro desde
1 año
Número de seguidores
0
Documentos
240
Última venta
1 semana hace
YOU

I know how frustrating it can get with all those assignments mate. Nursing Being my main profession line, i have essential guides that are A graded, I am a very friendly person so don

4.5

4 reseñas

5
2
4
2
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes