Studyclock
On this page, you find all documents, package deals, and flashcards offered by seller Studyclock.
- 7313
- 0
- 662
Community
- Followers
- Following
114 Reviews received
7989 items
![](/docpics/5630126/666ab55a9cd35_5630126_121_171.jpeg)
MILESTONE #1 Practice Exam Questions And Answers
MILESTONE #1 Practice Exam Questions And Answers 
 
 
Which information should the nurse have when assessing a client for therapeutic effects of a prescribed medication? 
 
a) The client's previous experience with medication. 
 
b) The client's baseline before taking the medication. 
 
c) Expected side effects of the medication. 
 
d) Expected response of the medication. - ANS b) The client's baseline before taking the medication. 
 
The nurse is teaching a client about the medication trea...
- Exam (elaborations)
- • 5 pages •
MILESTONE #1 Practice Exam Questions And Answers 
 
 
Which information should the nurse have when assessing a client for therapeutic effects of a prescribed medication? 
 
a) The client's previous experience with medication. 
 
b) The client's baseline before taking the medication. 
 
c) Expected side effects of the medication. 
 
d) Expected response of the medication. - ANS b) The client's baseline before taking the medication. 
 
The nurse is teaching a client about the medication trea...
![](/docpics/5629890/666aab7e40f6c_5629890_121_171.jpeg)
ECPI NUR 138 Pharmacology Exam 1 Questions And Answers All Verified
ECPI NUR 138 Pharmacology Exam 1 Questions And Answers All Verified 
 
The patient is to receive oral guaifenesin (Mucinex) twice a day. Today, the nurse was busy and gave the medication 2 hours after the scheduled dose was due. What type of problem does this represent? 
 
A. "Right route" 
B. "Right medication" 
C. "Right dose" 
D. "Right time" - ANS D. "Right time" 
 
Rationale: "Right time" is correct because the medication was given more than 30 minutes after the scheduled do...
- Exam (elaborations)
- • 16 pages •
ECPI NUR 138 Pharmacology Exam 1 Questions And Answers All Verified 
 
The patient is to receive oral guaifenesin (Mucinex) twice a day. Today, the nurse was busy and gave the medication 2 hours after the scheduled dose was due. What type of problem does this represent? 
 
A. "Right route" 
B. "Right medication" 
C. "Right dose" 
D. "Right time" - ANS D. "Right time" 
 
Rationale: "Right time" is correct because the medication was given more than 30 minutes after the scheduled do...
![](/docpics/5622891/6669a5f389078_5622891_121_171.jpeg)
Residential Construction Basics Exam Questions And Answers
Residential Construction Basics Exam Questions And Answers 
 
 
what a foundation wall rests on - ANS Footings 
 
All of the following are items used to mix concrete for a foundation EXCEPT: 
1. Cement 
2. Aggregate 
3. Sand 
4. Mortar - ANS mortar 
 
The common measure in a sack of cement: 
1. 1 cubic yard 
2. 1 cubic foot 
3. 40 lbs 
4. 1 square yd - ANS 1 cubic foot 
 
For which of the following foundation materials are forms most likely to be required? 
1. concrete blocks 
2. poured c...
- Exam (elaborations)
- • 14 pages •
Residential Construction Basics Exam Questions And Answers 
 
 
what a foundation wall rests on - ANS Footings 
 
All of the following are items used to mix concrete for a foundation EXCEPT: 
1. Cement 
2. Aggregate 
3. Sand 
4. Mortar - ANS mortar 
 
The common measure in a sack of cement: 
1. 1 cubic yard 
2. 1 cubic foot 
3. 40 lbs 
4. 1 square yd - ANS 1 cubic foot 
 
For which of the following foundation materials are forms most likely to be required? 
1. concrete blocks 
2. poured c...
![](/docpics/5622863/6669a50144106_5622863_121_171.jpeg)
Residential Contractor Practice Exam Questions And Answers
Residential Contractor Practice Exam Questions And Answers 
 
 
What is the MINIMUM overlap for joints in polyethylene film moisture barrier applied over the exterior of a below grade foundation wall? - ANS 6 inches 
 
What is the MINIMUM height required for a nonabsorbent wall surface above a bathtub? - ANS 6 feet 
 
Nails used to fasten concrete roofing tiles must penetrate the deck a MINIMUM of how many inches or through the thickness of the deck, Whichever is less? - ANS 3/4 inch
- Exam (elaborations)
- • 2 pages •
Residential Contractor Practice Exam Questions And Answers 
 
 
What is the MINIMUM overlap for joints in polyethylene film moisture barrier applied over the exterior of a below grade foundation wall? - ANS 6 inches 
 
What is the MINIMUM height required for a nonabsorbent wall surface above a bathtub? - ANS 6 feet 
 
Nails used to fasten concrete roofing tiles must penetrate the deck a MINIMUM of how many inches or through the thickness of the deck, Whichever is less? - ANS 3/4 inch
![](/docpics/5622835/6669a44d7140b_5622835_121_171.jpeg)
F13 Residential Building Contractor Exam Sample Questions And Answers
F13 Residential Building Contractor Exam Sample Questions And Answers 
 
 
The self-weight of the structural members normally provides the largest portion of the _____ load of a building. 
 
A. Dead 
B. Live 
C. Wind 
D. Heavy - ANS A. Dead 
 
R301.4 Dead load. 
 
What distance is required between masonry veneer and sheathing? 
 
A. .5 inch 
B. 1 inch 
C. 1.5 inch 
D. 2 inch - ANS B. 1 inch 
 
FIGURE R703.8 
 
What is the maximum stud spacing of 2X6 bearing walls when supporting two f...
- Exam (elaborations)
- • 5 pages •
F13 Residential Building Contractor Exam Sample Questions And Answers 
 
 
The self-weight of the structural members normally provides the largest portion of the _____ load of a building. 
 
A. Dead 
B. Live 
C. Wind 
D. Heavy - ANS A. Dead 
 
R301.4 Dead load. 
 
What distance is required between masonry veneer and sheathing? 
 
A. .5 inch 
B. 1 inch 
C. 1.5 inch 
D. 2 inch - ANS B. 1 inch 
 
FIGURE R703.8 
 
What is the maximum stud spacing of 2X6 bearing walls when supporting two f...
![](/docpics/5622705/6669a103a6179_5622705_121_171.jpeg)
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers Combined Solutions
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers Combined Solutions 

- Package deal
- • 5 items •
- ACI Concrete Field Testing Technician- Grade I Exam Questions And Answers • Exam (elaborations)
- ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) • Exam (elaborations)
- ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers • Exam (elaborations)
- ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers • Exam (elaborations)
- ACI Concrete Field Testing Technician - Grade I Exam Questions And Answers • Exam (elaborations)
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers Combined Solutions 

![](/docpics/5622705/6669a103a6179_5622705_121_171.jpeg)
ACI Concrete Field Testing Technician - Grade I Exam Questions And Answers
ACI Concrete Field Testing Technician - Grade I Exam Questions And Answers 
 
The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of __mm [__in.] into the freshly mixed concrete. - ANS 77mm /3in. 
 
The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to +- __C [+__F] through a range of __. - ANS 0.5 C / +-1F / 0-50 Degrees C 
 
The temp. measuring device shall be verified __, or...
- Package deal
- Exam (elaborations)
- • 5 pages •
ACI Concrete Field Testing Technician - Grade I Exam Questions And Answers 
 
The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of __mm [__in.] into the freshly mixed concrete. - ANS 77mm /3in. 
 
The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to +- __C [+__F] through a range of __. - ANS 0.5 C / +-1F / 0-50 Degrees C 
 
The temp. measuring device shall be verified __, or...
![](/docpics/5622683/6669a05a14b57_5622683_121_171.jpeg)
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers 
 
 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
 
A. True 
B. False - ANS B. False 
 
 ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. 
 
A. True 
B....
- Package deal
- Exam (elaborations)
- • 30 pages •
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers 
 
 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
 
A. True 
B. False - ANS B. False 
 
 ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. 
 
A. True 
B....
![](/docpics/5622665/66699fa58de23_5622665_121_171.jpeg)
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers 
 
ASTM C1064 - ANS Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete 
 
The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - ANS 3 inches [75 mm] 
 
C1064, Sec. 8.1 
 
The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± _...
- Package deal
- Exam (elaborations)
- • 21 pages •
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions And Answers 
 
ASTM C1064 - ANS Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete 
 
The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - ANS 3 inches [75 mm] 
 
C1064, Sec. 8.1 
 
The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± _...
![](/docpics/5622636/66699ebe30049_5622636_121_171.jpeg)
ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17)
ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) 
 
 
 
The Method of determining air content of concrete containing lightweight aggregate is the pressure method. True or False? - ANS False 
 
When making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete. True or False? - ANS True 
 
While the technician is checking the slump of the concrete, there is a dec...
- Package deal
- Exam (elaborations)
- • 2 pages •
ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) 
 
 
 
The Method of determining air content of concrete containing lightweight aggregate is the pressure method. True or False? - ANS False 
 
When making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete. True or False? - ANS True 
 
While the technician is checking the slump of the concrete, there is a dec...
Unit 7 Progress Check Questions And Answers
Unit 7 Progress Check Questions And Answers
Unit 7 progress check MCQ Exam Questions And Answers
Unit 7 Progress Check: MCQ practice Exam Questions And Answers
Thankyou studyclock
MCQ Unit 7 Progress Check APUSH Exam Questions And Answers
Nice pack a life saver it is