OM 493

George Mason University

Here are the best resources to pass OM 493. Find OM 493 study guides, notes, assignments, and much more.

All 17 results

Sort by

 OM 493 Chapter_02_Test_Bank
  • OM 493 Chapter_02_Test_Bank

  • Exam (elaborations) • 105 pages • 2023
  • Available in package deal
  • MC Qu. 01 (Static) Which of the following is NOT... Which of the following is NOT true about an organization's strategy? Strategy determines how an organization will compete. Strategy is implemented through projects. Only top management must understand strategy. Project selection should be clearly aligned with strategy. Project management plays a key role in supporting strategy. Strategy was considered to be under the purview of senior management, but this is old school thinking. Projec...
    (0)
  • $10.99
  • + learn more
 OM 493 Chapter_05_Test_Bank A Graded
  • OM 493 Chapter_05_Test_Bank A Graded

  • Exam (elaborations) • 111 pages • 2023
  • Available in package deal
  • MC Qu. 02 (Static) In practice, estimating processes are frequently... In practice, estimating processes are frequently classified as top down/bottom up. rough/polished. precise/order of magnitude. draft/final. broad/specific. Estimating processes are frequently classified as top-down and bottom-up. Top-down estimates are usually done by senior management. Bottom-up estimates are typically done by the people doing the work. References Multiple Choice Difficulty: 1 Easy MC Qu. 02 (St...
    (0)
  • $10.99
  • + learn more
 OM 493  Chapter_08_Test_Bank Very Correct
  • OM 493 Chapter_08_Test_Bank Very Correct

  • Exam (elaborations) • 116 pages • 2023
  • Available in package deal
  • MC Qu. 01 (Static) Resources are adequate, but demand varies... Resources are adequate, but demand varies widely over the life of the project. Delaying noncritical activities to lower peak demand on resources is known as resource shifting. effectiveness. manipulating. smoothing. allocation. If resources are adequate but the demand varies widely over the life of the project, it may be desirable to even out resource demand by delaying noncritical activities (using slack) to lower peak de...
    (0)
  • $10.49
  • + learn more
OM 493 Chapter 9Test Bank QUESTION AND ANSWERS  100% CORRECT
  • OM 493 Chapter 9Test Bank QUESTION AND ANSWERS  100% CORRECT

  • Exam (elaborations) • 88 pages • 2023
  • Available in package deal
  • MC Qu. 01 (Static) Without any formal planning, the president... Without any formal planning, the president of a high-tech company remarks in a speech that new technologically advanced routers will be available in one year. This may lead to a project that must be done faster than anticipated. This is an example of reducing project duration caused by imposed project deadlines. time to market. unforeseen project delays. high overhead. incentive contracts. Imposed deadlines are another rea...
    (0)
  • $10.49
  • + learn more
 OM 493 Chapter 10 Test Bank QUESTIONS AND VERIFIED ANSWERS
  • OM 493 Chapter 10 Test Bank QUESTIONS AND VERIFIED ANSWERS

  • Exam (elaborations) • 101 pages • 2023
  • MC Qu. 01 (Static) Project success or failure often is... Project success or failure often is reliant upon the contributions of all the following groups of stakeholders EXCEPT customers. suppliers. contractors. competitors. top management. Project success does not just depend on the performance of the project team. Success or failure often depends on the contributions of top management, functional managers, customers, suppliers, contractors, and others. References Multiple Choice Dif...
    (0)
  • $10.49
  • + learn more
 OM 493 Chapter 03 Test Bank (Questions and verified Answers)
  • OM 493 Chapter 03 Test Bank (Questions and verified Answers)

  • Exam (elaborations) • 105 pages • 2023
  • MC Qu. 01 (Static) Organizational culture has a connection... Organizational culture has a connection to projects. It (organizational culture) is best explained as organizational _____. personality hierarchy reporting relationships background management style A simple explanation of organizational culture is that it reflects the "personality" of an organization. References Multiple Choice Difficulty: 1 Easy MC Qu. 01 (Static) Organizational culture has a connection... Learning ...
    (0)
  • $10.49
  • + learn more
 OM 493 Chapter 11 Test Bank QUESTIONS AND VERIFIED ANSWERS
  • OM 493 Chapter 11 Test Bank QUESTIONS AND VERIFIED ANSWERS

  • Exam (elaborations) • 106 pages • 2023
  • MC Qu. 01 (Static) The essence of positive synergy can... The essence of positive synergy can be found in the phrase, "Front of ship sink—back of ship sink." "If it doesn't kill you, it makes you stronger." "There is no ‘I’ in team." "Two heads are better than one." "The whole is greater than the sum of the parts." "If it doesn't kill you, it makes you stronger." The essence of positive synergy can be found in the phrase, "The whole is greater than the sum of the pa...
    (0)
  • $12.49
  • + learn more
 OM 493 Chapter 15 Test Bank QUESTIONS AND VERIFIED ANSWERS
  • OM 493 Chapter 15 Test Bank QUESTIONS AND VERIFIED ANSWERS

  • Exam (elaborations) • 98 pages • 2023
  • MC Qu. 01 (Static) Traditional approaches to project management concentrate... Traditional approaches to project management concentrate firmly on thorough planning up front. new technology. flexibility. change. iterative development. Traditional approaches to project management concentrate firmly on thorough planning up front. The rationale is that if you plan, execute your plan, and take corrective action on deviations from plan, you have a high probability of success. References Mu...
    (0)
  • $12.49
  • + learn more
 OM 493 Chapter 15 Test Bank QUESTION AND ANSWERS  100% CORRECT
  • OM 493 Chapter 15 Test Bank QUESTION AND ANSWERS  100% CORRECT

  • Exam (elaborations) • 98 pages • 2023
  • MC Qu. 01 (Static) Traditional approaches to project management concentrate... Traditional approaches to project management concentrate firmly on thorough planning up front. new technology. flexibility. change. iterative development. Traditional approaches to project management concentrate firmly on thorough planning up front. The rationale is that if you plan, execute your plan, and take corrective action on deviations from plan, you have a high probability of success. References Mu...
    (0)
  • $10.49
  • + learn more
 OM 493 Chapter 11 Test Bank QUESTION AND ANSWERS  100% CORRECT
  • OM 493 Chapter 11 Test Bank QUESTION AND ANSWERS  100% CORRECT

  • Exam (elaborations) • 106 pages • 2023
  • MC Qu. 01 (Static) The essence of positive synergy can... The essence of positive synergy can be found in the phrase, "Front of ship sink—back of ship sink." "If it doesn't kill you, it makes you stronger." "There is no ‘I’ in team." "Two heads are better than one." "The whole is greater than the sum of the parts." "If it doesn't kill you, it makes you stronger." The essence of positive synergy can be found in the phrase, "The whole is greater than the sum of the pa...
    (0)
  • $10.49
  • + learn more