OM 493 Chapter_08_Test_Bank Very Correct
MC Qu. 01 (Static) Resources are adequate, but demand varies... Resources are adequate, but demand varies widely over the life of the project. Delaying noncritical activities to lower peak demand on resources is known as resource shifting. effectiveness. manipulating. smoothing. allocation. If resources are adequate but the demand varies widely over the life of the project, it may be desirable to even out resource demand by delaying noncritical activities (using slack) to lower peak demand and, thus, increase resource utilization. This process is called resource smoothing. References Multiple Choice Difficulty: 1 Easy MC Qu. 01 (Static) Resources are adequate, but demand varies... Learning Objective: 08-01 Understand the differences between timeconstrained and resourceconstrained schedules. 2. Award: 1.00 point MC Qu. 02 (Static) If resources are not adequate to... If resources are not adequate to meet peak demands, the resulting reschedule is termed resource-constrained scheduling
Escuela, estudio y materia
- Institución
- George Mason University
- Grado
- OM 493
Información del documento
- Subido en
- 26 de septiembre de 2023
- Número de páginas
- 116
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
om 493
-
chapter08testbank
-
if resources are adequate
Documento también disponible en un lote