BSOP 429 (BSOP 429)

Devry University

Here are the best resources to pass BSOP 429 (BSOP 429). Find BSOP 429 (BSOP 429) study guides, notes, assignments, and much more.

All 12 results

Sort by

BSOP 429 Week 8 Final Exam (Version 1) | 100% CORRECT SOLUTIONS.
  • BSOP 429 Week 8 Final Exam (Version 1) | 100% CORRECT SOLUTIONS.

  • Exam (elaborations) • 8 pages • 2021
  • Page 1 (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 ho urs for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (TCO 3) Scheduling in service systems may i...
    (0)
  • $10.99
  • + learn more
Exam (elaborations) BSOP 429
  • Exam (elaborations) BSOP 429

  • Exam (elaborations) • 6 pages • 2021
  • 1. (TCO 12) is the objective under JIT and time-based competition. (Points : 5) WIP reduction Material velocity Lead-time reduction Decreasing material wait time 2. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5) Run, move, and queue Move and queue Run and setup Move and setup 3. (TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5) Inventory decreases Inventory increases Inventory rema...
    (0)
  • $13.49
  • + learn more
BSOP 429 Week 8 Final Exam Set 1 questions &answers,100% CORRECT
  • BSOP 429 Week 8 Final Exam Set 1 questions &answers,100% CORRECT

  • Exam (elaborations) • 10 pages • 2020
  • (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (TCO 3) Scheduling in service systems may inv...
    (0)
  • $16.49
  • + learn more
BSOP 429 Week 8 Final Exam Set 2 (Q&A),100% CORRECT
  • BSOP 429 Week 8 Final Exam Set 2 (Q&A),100% CORRECT

  • Exam (elaborations) • 14 pages • 2020
  • (TCO 4) The two different approaches to load work centers in job-shop scheduling are (TCO 2) The priority rule where jobs are processed according to the smallest ratio of due date to processing time is (TCO 2) A scheduling rule used for sequencing jobs through two work centers is (TCO 3) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:……If he uses the first-come, first-served (FCFS) priority rule to sched...
    (0)
  • $17.49
  • + learn more
BSOP 429 Week 4 Midterm (Version 1)Questions With Best Explained (VERIFIED) 100% Complete Solutions Graded A
  • BSOP 429 Week 4 Midterm (Version 1)Questions With Best Explained (VERIFIED) 100% Complete Solutions Graded A

  • Exam (elaborations) • 4 pages • 2020
  • (TCO 12) _____ is the objective under JIT and time-based competition. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (TCO 3) What happens to inventory as the number of kanban cards increases? (TCO 1) In managing supplier relations, which of the following is a beneficial setup? (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered? (TCO 9) Which of the follo...
    (0)
  • $14.49
  • + learn more
BSOP 429 Week 8 Final Exam (Version 1) Questions With Best Explained (VERIFIED) With 100% Answers Graded A
  • BSOP 429 Week 8 Final Exam (Version 1) Questions With Best Explained (VERIFIED) With 100% Answers Graded A

  • Exam (elaborations) • 8 pages • 2020
  • Available in package deal
  • (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (TCO 3) Scheduling in service systems may involv...
    (0)
  • $16.49
  • + learn more
BSOP 429 Week 8 Final Exam (Version 2) Questions And Best Explained Latest And Complete (VERIFIED) 100% Answers 2020
  • BSOP 429 Week 8 Final Exam (Version 2) Questions And Best Explained Latest And Complete (VERIFIED) 100% Answers 2020

  • Exam (elaborations) • 12 pages • 2020
  • Available in package deal
  • (TCO 4) The two different approaches to load work centers in job-shop scheduling are (TCO 2) The priority rule where jobs are processed according to the smallest ratio of due date to processing time is (TCO 2) A scheduling rule used for sequencing jobs through two work centers is (TCO 3) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:……If he uses the first-come, first-served (FCFS) priority rule to schedule...
    (0)
  • $16.49
  • + learn more
BSOP 429 WEEK 2 QUESTIONS WITH GRADE A SOLUTIONS
  • BSOP 429 WEEK 2 QUESTIONS WITH GRADE A SOLUTIONS

  • Exam (elaborations) • 1 pages • 2020
  • 1. What kind of warning signals would you like fed back from PAC to MRP? 2. Lead times are sometimes called rubbery. What accounts for this concept of elasticity in lead times? Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to use the Dropbox, read these step-by-step instructions or watch this
    (0)
  • $14.49
  • + learn more
BSOP 429 WEEK 3 QUESTIONS WITH GRADE A SOLUTIONS
  • BSOP 429 WEEK 3 QUESTIONS WITH GRADE A SOLUTIONS

  • Exam (elaborations) • 2 pages • 2020
  • 1. What are the differences in how bottleneck and non-bottleneck work centers are scheduled under TOC? Why are these differences desirable? 2. Why should buffers be located in front of bottleneck work centers under TOC scheduling? How should the size of the buffers be determined? Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to use the Dropbox, read these step-by-step Instructions or watch this Dropbox Tutorial. See the Syllabus ...
    (0)
  • $16.49
  • + learn more