1




PMI CAPM Questions with Answers (100%
Correct Answers)
Once the make-or-buy analysis is completed, which document defines the
project delivery method?



A. Procurement statement of work (SOW)



B. Procurement strategy



C. Terms of reference



D. Change request Answer: B. Procurement strategy

A project is just beginning, and management creates a long list of potential
stakeholders. Which statement about identifying and engaging stakeholder, is
correct?



A. The project manager should identify and deal with stakeholders only during
the execution phase.



B. Stakeholder satisfaction should be identified immediately and managed as a
project objective.

,2


C. The project manager should focus on project objectives and deal with
stakeholders as a secondary priority.



D. Stakeholder satisfaction is the most important goal, and project objectives
should be considered a secondary priority. Answer: B. Stakeholder satisfaction
should be identified immediately and managed as a project objective.

Which is an example of leveraging evolving trends and emerging practices in
Project Integration Management?



A. Hybrid methodologies



B. Risk register updates



C. Outsourced project resources



D. Reliance on lessons learned documents Answer: A. Hybrid methodologies

What should a project manager use to determine how much money is needed
to complete a project?



A. Earned value management (EVM)



B. Estimate at completion (EAC)

,3


C. Earned value analysis (EVA)



D. Budget at completion (BAC) Answer: C. Earned value analysis (EVA)

The project manager is creating the communications management plan. Which
group of inputs is required to begin?



A. Work performance reports, change requests, and risk register



B. Work performance data, project documents, and stakeholder engagement
plan



C. Project charter, project management plan, and project documents



D. Work performance data, stakeholder register, and team management plan
Answer: C. Project charter, project management plan, and project documents

A project is in progress and about to move to a different phase, according to the
plan. This will be a good opportunity for the project manager to:



A. create the project management plan.



B. identify the project objectives.

, 4


C. review and update stakeholder engagement.



D. create the schedule baseline. Answer: C. review and update stakeholder
engagement.

A new project has been set. Four main stakeholders besides the project
manager and four other team members have been identified. How many
communication channels are available?



A. 8



B. 18



C. 36



D. 40 Answer: C. 36

A project manager is preparing to meet with three crucial project stakeholders
on a new project. Which tools and techniques can the project manager use to
capture stakeholder interest?



A. Review stakeholder register and meeting



B. Data analysis and communication skills

Documentinformatie

Geüpload op
20 november 2025
Aantal pagina's
106
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€20,38

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Passit
3,5
(23)
Verkocht
129
Volgers
6
Items
14482
Laatst verkocht
1 dag geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen