CMGT 3500 Exam 2 Review Questions And Answers Rated 100%!!!

Document preview thumbnail
Voorbeeld 2 van de 5 pagina's

What are the three project award methods? - ANS competitive bidding, negotiation, direct assignment Where is competitive bidding used? - ANS federal or state and local projects, publicly financed Where is negotiation/direct assignment used? - ANS private government What are the advantages of competitive bidding? - ANS fair to all contractors, allows competition and innovation to reduce price, allows new contractors a chance to enter the market What is negotiated bidding? - ANS selective pool of experienced and trustworthy contractors, looks at factors other than cost. Has a shorter period of time for bid evaluations What is bid rigging? - ANS form of fraud which can turn into collusion and jail time, illegal, tied to price fixing and market allocation What are the elements of the bid? - ANS advertisement for bid (used on public projects), invitation to bid (private projects), instructions for bidders (AIA) What does IFB stand for? - ANS Instructions to/for bidders What are instructions for bidders used for? - ANS Used to distribute uniformed information to all bidders, ensures uniformity and responsiveness, lets you know if bid bond is required through a bank or surety company, also shows the withdrawal process. What is competitive bidding? - ANS oldest and most commonly used for contractor selection. Lowest responsive responsible bidder wins What is a responsible bid? - ANS meets all terms and conditions of bid and instructions to bidder. Complies with contract documents with no deviation. What are bid changes? - ANS owner approved reasons for change will result in return of bid bond. Failure to follow owner instructions will result in bond revocation. When can you withdraw a bid? - ANS mistake must be considerable and of sufficient magnitude, not of negligence or inexperience. Owner does not suffer from withdrawal of bid What is low bidder determination? - ANS when the total bid price is considered for lump sum bids What is equivalent lump sum? - ANS associated with unit pricing, offers a maximum bid price What is an addenda? - ANS Addenda is a formal change initiated by owner or agent to the bid requirements, documents, conditions, or scope during the bidding process. All bidders will get copy of addenda. Issued for correction of error or discrepancies in specifications. Corrected with updated and revised versions. Could also be owner change When is a change order used? - ANS can only be used during the project What are the two major components of a contract document? - ANS project manual and drawings What does the project manual contain? - ANS invitation to bid, instruction to bidders, bid forms, general conditions of contract, general requirements of contract, technical specs divisions 2-49 of CSI What are the three phases of drawing development? - ANS diagram of functional relationships (DFR), working drawings, shop drawings

Voorbeeld van de inhoud

CMGT 3500 Exam 2 Review Questions
And Answers Rated 100%!!!




A
R
U
LA
C
O
D

, What are the three project award methods? - ANS competitive bidding, negotiation, direct
assignment

Where is competitive bidding used? - ANS federal or state and local projects, publicly
financed




A
Where is negotiation/direct assignment used? - ANS private government

What are the advantages of competitive bidding? - ANS fair to all contractors, allows




R
competition and innovation to reduce price, allows new contractors a chance to enter the market

What is negotiated bidding? - ANS selective pool of experienced and trustworthy
contractors, looks at factors other than cost. Has a shorter period of time for bid evaluations



U
What is bid rigging? - ANS form of fraud which can turn into collusion and jail time, illegal,
tied to price fixing and market allocation
LA
What are the elements of the bid? - ANS advertisement for bid (used on public projects),
invitation to bid (private projects), instructions for bidders (AIA)

What does IFB stand for? - ANS Instructions to/for bidders
C

What are instructions for bidders used for? - ANS Used to distribute uniformed information
to all bidders, ensures uniformity and responsiveness, lets you know if bid bond is required
through a bank or surety company, also shows the withdrawal process.
O


What is competitive bidding? - ANS oldest and most commonly used for contractor
selection. Lowest responsive responsible bidder wins
D



What is a responsible bid? - ANS meets all terms and conditions of bid and instructions to
bidder. Complies with contract documents with no deviation.

What are bid changes? - ANS owner approved reasons for change will result in return of
bid bond. Failure to follow owner instructions will result in bond revocation.

When can you withdraw a bid? - ANS mistake must be considerable and of sufficient
magnitude, not of negligence or inexperience. Owner does not suffer from withdrawal of bid

Documentinformatie

Geüpload op
17 oktober 2025
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€13,23

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DocLaura
4,2
(44)
Verkocht
161
Volgers
38
Items
6357
Laatst verkocht
1 maand geleden


Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen