In order to obtain NOI coverage under the IGP, PRDs include: - ANS NOI and electronic
certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with federal law that addresses
security in the US, the discharger must also submit - ANS A written justification that the
information redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in SMARTs? - ANS -the facilities'
industrial operations have changed and are no longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and removed all industrial
related pollutants
A person in which position would be eligible to be an LRP: Maintenance supervisor, QISP
consultant, Public works director, or Monitoring consultant? - ANS Public works director
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
, The temporary suspension of industrial activities requires what to be uploaded in SMARTS? -
ANS -The justification for why the monitoring is infeasible at the facility during the
temporary suspension
-The projected date that the industrial activities will resume at the facility
-SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of industrial activities
Authorized NSWDs include which of the following: discharges from a broken water main in an
employee parking lot; fire hydrant testing; rinse water from industrial equipment washing,
BMPs are deployed as needed; water from landscape irrigation that runs through the facility's
stockpiled materials? - ANS Fire Hydrant Testing
Name four things required to be in the SWPPP? - ANS -Storm Water Pollution Prevention
Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility site map: a restroom's
municipal sanitary sewer connection; structural control measures; analytical sampling values
from the previous reporting year; each BMP implemented at the facility; spills and leaks over 42
gallons from the previous 6 year period? - ANS Structural control measures
A discharger that has fulfilled the requirements for the temporary suspension of industrial
activities at a facility is not required to... - ANS Perform sampling and analysis of storm water
discharges because the discharger has justified that it is infeasible to do so
Water Quality Based Corrective Actions can be required by which agency? - ANS Regional
Water Board
The IGP does not require training for the: - ANS LRP (Legally Responsible Person)
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
COMPREHENSIVE EXAM UPDATED
QUESTIONS AND CORRECT ANSWERS.
In order to obtain NOI coverage under the IGP, PRDs include: - ANS NOI and electronic
certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with federal law that addresses
security in the US, the discharger must also submit - ANS A written justification that the
information redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in SMARTs? - ANS -the facilities'
industrial operations have changed and are no longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and removed all industrial
related pollutants
A person in which position would be eligible to be an LRP: Maintenance supervisor, QISP
consultant, Public works director, or Monitoring consultant? - ANS Public works director
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
, The temporary suspension of industrial activities requires what to be uploaded in SMARTS? -
ANS -The justification for why the monitoring is infeasible at the facility during the
temporary suspension
-The projected date that the industrial activities will resume at the facility
-SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of industrial activities
Authorized NSWDs include which of the following: discharges from a broken water main in an
employee parking lot; fire hydrant testing; rinse water from industrial equipment washing,
BMPs are deployed as needed; water from landscape irrigation that runs through the facility's
stockpiled materials? - ANS Fire Hydrant Testing
Name four things required to be in the SWPPP? - ANS -Storm Water Pollution Prevention
Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility site map: a restroom's
municipal sanitary sewer connection; structural control measures; analytical sampling values
from the previous reporting year; each BMP implemented at the facility; spills and leaks over 42
gallons from the previous 6 year period? - ANS Structural control measures
A discharger that has fulfilled the requirements for the temporary suspension of industrial
activities at a facility is not required to... - ANS Perform sampling and analysis of storm water
discharges because the discharger has justified that it is infeasible to do so
Water Quality Based Corrective Actions can be required by which agency? - ANS Regional
Water Board
The IGP does not require training for the: - ANS LRP (Legally Responsible Person)