• Verkeerd document? Gratis ruilen
  • Geschreven door studenten die geslaagd zijn
  • Direct beschikbaar na je betaling
  • Online lezen of als PDF
Verkopen
Kies je studieland
Kies je taal
Document preview thumbnail
Voorbeeld 2 van de 13 pagina's
Tentamen (uitwerkingen)

Csu Con 101 Final Exam Study Guide.

Document preview thumbnail
Voorbeeld 2 van de 13 pagina's

Base isolators - ANS Large shock absorbers made of alternating layers of rubber and steel attached to a building foundation to allow movement of the structure without causing damage. Brownfield sites - ANS A property that is abandoned or underused because of historic environmental contamination. constuctability review - ANS A design review process in which experienced contractors and construction managers work with designers to ensure that the details of the design actually can be built in an efficient and cost-effective manner cofferdams - ANS Temporary watertight enclosures erected to prevent water from seeping into an area, allowing construction to take place in the water free space. CSU CON 101 FINAL EXAM STUDY GUIDE. Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2 infrastructure - ANS The basic roadways, bridges, and railroad networks that support a community or society. lean principles - ANS Stemming from the Toyota Production system, principles that focus on creating more value for customers with less work and the elimination of waste program - ANS A written statement that identifies and describes an owner or end user's needs and requirements for a facility. Every design starts with a program. specifications - ANS The written instruction from an architect or engineer accompanying the project plans pertaining to the quality of materials and workmanship required for the project. Agency CM - ANS A construction management option in which the CM acts in the owners best interests at every stage of the project from design through construction Architectural programming - ANS The research and decision-making process, initiated by an owner, usually with the help of an architect or other programming specialist, that identifies the basic needs of the client and the parameters of the project to be designed and ultimately built by a construction p

Voorbeeld van de inhoud

CSU CON 101 FINAL EXAM STUDY
GUIDE.



Base isolators - ANS Large shock absorbers made of alternating layers of rubber and steel

attached to a building foundation to allow movement of the structure without causing damage.




Brownfield sites - ANS A property that is abandoned or underused because of historic

environmental contamination.




constuctability review - ANS A design review process in which experienced contractors and

construction managers work with designers to ensure that the details of the design actually can

be built in an efficient and cost-effective manner




cofferdams - ANS Temporary watertight enclosures erected to prevent water from seeping

into an area, allowing construction to take place in the water free space.




Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1

, infrastructure - ANS The basic roadways, bridges, and railroad networks that support a

community or society.




lean principles - ANS Stemming from the Toyota Production system, principles that focus on

creating more value for customers with less work and the elimination of waste




program - ANS A written statement that identifies and describes an owner or end user's

needs and requirements for a facility. Every design starts with a program.




specifications - ANS The written instruction from an architect or engineer accompanying the

project plans pertaining to the quality of materials and workmanship required for the project.




Agency CM - ANS A construction management option in which the CM acts in the owners

best interests at every stage of the project from design through construction




Architectural programming - ANS The research and decision-making process, initiated by an

owner, usually with the help of an architect or other programming specialist, that identifies the

basic needs of the client and the parameters of the project to be designed and ultimately built

by a construction pro.

Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2

Documentinformatie

Geüpload op
2 juli 2025
Aantal pagina's
13
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€12,22

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brightstars
3,4
(43)
Verkocht
281
Volgers
7
Items
15996
Laatst verkocht
1 week geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen