Tentamen (uitwerkingen)

Safe Rte 5

Document preview thumbnail
Voorbeeld 2 van de 8 pagina's

Exam of 8 pages for the course arbeids- en organisatiepyschologie at arbeids- en organisatiepyschologie (SAFE RTE 5)

Voorbeeld van de inhoud

SAFE RTE 5.0 2023 Questions and
Correct Answers| Rated A+
What's the Best way to foster flow of value, innovation and apply Lean Budgeting in the
enterprise? - ANSWERS-Implement the Lean Portfolio core Competency

What are my personal Observations on being a RTE? - ANSWERS-For me, an RTE is a
Scrum master at Program level; a Principle Scrum master if you ask me. Someone who
can look at all the different Scrum teams that compose an ART and is able to track and
coordinate all dependencies, risks, goals and features that compose it. But more than
that - The RTE should champion the Agile culture and promote it through the Scrum
masters while enforces a second layer of communication and relationships between
team members, Scrum masters, Product owners and Stakeholders.

Release Train Engineer (RTE)? - ANSWERS-The RTE facilitates Agile Release Train
processes and execution. The RTE escalate impediments, helps manage risk, helps
ensure value delivery, and drives continuous improvement.

Which tool can the RTE use to visualize the flow of value? - ANSWERS-Kanban
systems

How can the RTE support Decentralized Decision-making? - ANSWERS-Empower
knowledge workers to manage the dependencies with other teams

What's the best way for the RTE to show progress in the current PI to Management? -
ANSWERS-Use a System Demo

What SAFe principle is being applied when a RTE treats suppiers as Partners? -
ANSWERS-Apply Systems Thinking

What is the term Alignment in SAFe? - ANSWERS-Alignment must rely on the
Enterprise business objectives. It starts with the strategy and investment decisions at
the Portfolio level and is reflected in Strategic Themes, Portfolio Vision, and the Portfolio
Backlog. In turn, this informs the Vision, Roadmap, and the backlogs at all levels of
SAFe.

In order to evolve as a Leader in SAFe, what practices can the RTE recommend? -
ANSWERS-Encourage personal development

What's one way to secure Stakeholder commitment to the ART? - ANSWERS-Have
them attend the Program Increment (PI) event

Situation Question: During PI planning, the RTE sees the excitement of the team quickly
decline as Product Management starts making sudden changes to Priorities - including

, the Top 10 Features - in the Program Backlog! What do you think is the cause? -
ANSWERS-1. Lack of Training, and;
2. Preparation for PI Planing

Which two actions must the RTE take when facilitating the PI planning event? (choose
two) - ANSWERS-1. Distribute the PI planning Agenda to Agile teams
2. Ensure all Audio/Visuals are setup correctly

How many iterations does one Program Increment (PI) have in SAFe - ANSWERS-PIs
are typically 8 - 12 weeks long. The most common pattern for a PI is four development
Iterations, followed by one Innovation and Planning (IP) Iteration

If a team's vote on the confidence level is high enough the aggregate set of objectives
becomes - ANSWERS-ART Plan

What are two ways Program Risk can be Categorized? (choose two)
a. Reliable
b. Owned
c. Leaning out
d. Resolved - ANSWERS-Owned, Resolved

The Teams DRAFT plan review consists of which three items at the end of the 1st DAY
of the PI planning event, (choose 3)
a. Risks and Impediments
b. Capacity and Load Estimates
c. Agile team assessment
d. Draft PI Objectives - ANSWERS-Risks and Impediments; Capacity and Load
Estimates and Draft PI Objectives

Which Tool is useful in facilitating Scrum of Scrum meetings? - ANSWERS-Program
Board

What's the only true OBJECTIVE measure of an ART? - ANSWERS-System Demo
(hint: make sure you know difference between a Solution demo and System demo)

What's an ANTI-PATTERN, for an RTE, facilitating a Scrum of Scrum? - ANSWERS-
Reviewing Individual team Performance

What two items should be kept under VERSION control? (choose two)
a. SAFe tool
b. Test data
c. PI objectives
d. Configuration items - ANSWERS-Test data; Configuration Items

Documentinformatie

Geüpload op
20 mei 2025
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€13,28

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Verkocht
0
Volgers
0
Items
57
Laatst verkocht
-

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen