Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 3 van de 24 pagina's
Tentamen (uitwerkingen)

"Ace the NAB Exam with Verified Federal NHA Solutions and Answers"

Document preview thumbnail
Voorbeeld 3 van de 24 pagina's

"Ace the NAB Exam with Verified Federal NHA Solutions and Answers"

Voorbeeld van de inhoud

1. What is the main factor that determines the thickness of the road
pavement?

A. The type of vehicles using the road

B. The road's aesthetic design

C. The weather conditions in the area

D. The cost of construction

Answer: a) The type of vehicles using the road

Rationale: The thickness of the pavement is primarily based on the
expected traffic load, including the types of vehicles and their frequency of
use.



2. In NHA's road construction projects, what is the purpose of conducting a
'traffic survey'?

A. To estimate the number of toll booths needed

B. To determine the traffic volume and patterns for planning road capacity

C. To assess the environmental impact

D. To create advertising space along the road
Answer: b) To determine the traffic volume and patterns for planning road
capacity

Rationale: Traffic surveys help in understanding traffic patterns, volumes,
and peak hours, which are essential for designing roads that can
accommodate future traffic demands.

,3. Which of the following is a key consideration in the design of a national
highway?

A. The color of the road surface

B. The aesthetic design of streetlights

C. The capacity to handle traffic volume

D. The proximity to historical sites

Answer: c) The capacity to handle traffic volume

Rationale: The design of highways focuses on ensuring that they can handle
the expected traffic volume efficiently, promoting safety and smooth flow.



4. Which of the following is a major challenge in the maintenance of
national highways?

A. Managing fuel prices

B. Dealing with road congestion during peak hours

C. Repairing damage caused by weather conditions

D. Determining vehicle ownership

Answer: c) Repairing damage caused by weather conditions
Rationale: Weather conditions, such as heavy rainfall, snow, or extreme
temperatures, can cause significant damage to roads, leading to a need for
regular maintenance and repairs.



5. What is a 'cut-and-fill' process in road construction?
A. A method to grade land by removing soil from higher areas and filling
lower areas

B. A technique for cutting down trees along the road

, C. A process for creating decorative road signs

D. A method for installing road lights

Answer: a) A method to grade land by removing soil from higher areas and
filling lower areas

Rationale: The 'cut-and-fill' process is used in road construction to level the
terrain by removing material from higher areas (cut) and using it to fill
lower areas (fill).



6. Which of the following is a method used for controlling traffic during
road construction?

A. Temporary traffic signs and barriers

B. Closing all lanes permanently

C. Allowing unrestricted access

D. Allowing only emergency vehicles

Answer: a) Temporary traffic signs and barriers
Rationale: Temporary traffic signs and barriers are used during
construction to redirect and control traffic flow while maintaining safety
for workers and drivers.



7. In highway construction, what does 'subgrade' refer to?

A. The final surface layer of the road

B. The soil layer beneath the pavement

C. The materials used for road signs

D. The portion of the road where tolls are collected

Answer: b) The soil layer beneath the pavement

Documentinformatie

Geüpload op
1 februari 2025
Aantal pagina's
24
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€20,82

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
wefvn
5,0
(429)
Verkocht
4582
Volgers
2
Items
491
Laatst verkocht
1 week geleden


Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.

Reviews van geverifieerde kopers




Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen