100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Samenvatting

Summary Methods & Techniques 1

Beoordeling
-
Verkocht
-
Pagina's
26
Geüpload op
17-10-2019
Geschreven in
2018/2019

This is a summary of all the articles necessary for the first exam of the course Business Innovation through IT Project Management











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
17 oktober 2019
Aantal pagina's
26
Geschreven in
2018/2019
Type
Samenvatting

Onderwerpen

Voorbeeld van de inhoud

Paper Summary
Paper 1 – Framing of project critical success factors by a systems model
Introduction
- Critical success factors:
o Limited number of areas in which results will ensure successful competitive performance
for the organization
o Few key areas where ‘things must go right’ for the business to flourish
o Areas of activity that should receive constant and careful attention from management
o Areas in which good performance is necessary to ensure attainment of goals
Comparison of sets of factors
- Only limited agreement among authors on factors that influence project success
- Three most cited factors:
o Importance of project receiving support form senior management
o Having clear and realistic objectives
o Producing an efficient plan
Criticisms of the critical factor approach
- Two criticisms:
o Inter-relationship between factors are at least as important as individual factors
▪ CSF approach does not provide mechanism for taking account of inter-
relationships
▪ ‘better understanding of relationship is required if success factors are to be of any
guidance
o Factors approach tends to view implementation as static process instead of dynamic
phenomenon
▪ Ignores potential for a factor to have varying levels of importance at different
stages of the implementation process
The Formal System Model (FSM)
- Model of robust system that is capable of purposeful activity without failures
- Formal system comprises:
o Decision-making subsystem that manages the system
▪ Responsible for decisions about how the purpose if the system are to be achieved
o Performance monitoring subsystem that observes transformation processes and reports
deviations from expectations
▪ Used to conceptualize situation as a system → compares the resulting system
with the FSM to determine extent to which features necessary for purposeful
activity are present
- Model contains within it factors identified in literature as being critical to success
o Able to act as framing device for project critical success factors
o Should provide way of making links between factors → overcomes two main criticisms
of CSF
Conclusion
- Lot of overlap between sets but the factors selected for inclusion in individual lists vary to a
considerable extent
- FSM contains within it all of the factors covered by sets of CSFs
o Has advantage of being able to consider the relationship between factors

, o Overcomes third criticism of CSF approach
- FSM capable of distinguishing between successful and unsuccessful projects
o Can provide way of tackling human and organizational aspects of systems development
projects

, Paper 2 – One Size does not fill all projects: Exploring Classical
Contingency Domains
Introduction
- Everyone is using some formal project management structure → defined as a temporary
organization that has been established to complete a specific goal
Theoretical Background and Basic Proposition
- Classical contingency theory asserts that different external conditions might require different
organizational characteristics
o Effectiveness is contingent upon the amount of goodness of fit between structural and
environmental variables
- Mechanistic organization was described as formal, centralized, specialized and bureaucratic
o Predominate in simple, stable and more certain environments
o Organizations less differentiated, achieve high degree of integration
- Organic organization was characterized as being informal, decentralized, having just few
authority levels and using extensive levels of communication
o Cope better with uncertain and complex environments → provide more capacity
o Organizations highly differentiated and integrated
- Literature assumes that all projects share universal set of managerial characteristics
o ‘one-size-fits-all’ idea is disappointing
- Emergence of two dimensions – uncertainty & complexity
o Coping with uncertainty is central problem for complex organizations
o Technology and environments major sources of uncertainty
The Conceptual Model
- Focus on study of technical and engineering-based projects → result in new product, process or
service
- Four levels of uncertainty & three levels of complexity (Scope)

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
helena-f Universiteit Twente
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
25
Lid sinds
6 jaar
Aantal volgers
22
Documenten
18
Laatst verkocht
1 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen