UNISA  2024  INF3708-24-Y  This is INF3708!  Assessment 1

QUIZ




Started on Wednesday, 3 April 2024, 7:18 PM
State Finished
Completed on Saturday, 6 April 2024, 6:42 PM
Time taken 2 days 23 hours
Marks 167.00/183.00
Grade 91.26 out of 100.00


Question 1
Correct

Mark 1.00 out of 1.00




Which approach for constructing a WBS uses a similar project’s WBS as a starting point?


a. mind-mapping
b. bottom-up
c. top-down
d. analogy 




Question 2
Correct

Mark 1.00 out of 1.00




The table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed
is referred to as _______.


a. Gantt chart
b. requirements traceability matrix 
c. state transition table
d. entity-attribute-value model




Question 3
Correct

Mark 1.00 out of 1.00




Which project management knowledge area ensures that the project will satisfy the stated or implied needs for which it was
undertaken?


a. Project time management
b. Project risk management
c. Project quality management 
d. Project cost management

,Question 4

Correct

Mark 1.00 out of 1.00




The organization recognizes that a new project exists and completes a project charter during which processes for a new
project?


a. opening
b. initiating 
c. planning
d. controlling




Question 5
Correct

Mark 1.00 out of 1.00




In project schedule management, what is the next step after defining project activities?


a. planning schedule management
b. controlling the schedule
c. determining their dependencies 
d. estimating activity duration




Question 6
Correct

Mark 1.00 out of 1.00




What document used to coordinate all project planning documents and help guide a project’s execution and control?


a. project management plan 
b. statement of work
c. scope statement
d. business case




Question 7
Correct

Mark 1.00 out of 1.00




Which statement best describes scope?


a. work involved in creating the products and the processes used to create them 
b. each level of work that is outlined in a work breakdown structure
c. end product created as part of a project that is delivered to the client
d. tasks that are decomposed into smaller tasks in a work breakdown structure

,Question 8

Correct

Mark 1.00 out of 1.00




According to Thamhain and Wilemon, what is the ability to improve a worker’s position?


a. penalty
b. promotion 
c. assignment
d. expertise




Question 9
Correct

Mark 1.00 out of 1.00




What are the bottom four needs in Maslow’s structure are referred to as?


a. self-actualization
b. deficiency 
c. safety
d. growth




Question 10
Correct

Mark 1.00 out of 1.00




Which software development approach allows developers to use a model to generate functional requirement and physical
design specifications concurrently?


a. Prototyping approach 
b. incremental approach
c. RAD approach
d. Waterfall approach




Question 11
Correct

Mark 1.00 out of 1.00




The main outputs of which process are team performance assessments, change requests, and updates to several
documents?


a. managing the project team
b. acquiring the project team
c. human resource planning
d. developing the project team 

, Question 12

Correct

Mark 1.00 out of 1.00




Which technique is used for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for
the least incremental cost?


a. crashing 
b. dependency
c. feeding buffers
d. breakdown structure




Question 13
Correct

Mark 1.00 out of 1.00




You work for a project team which decides not to us an upcoming release of software because it might cause your schedule
to slip. Which risk response strategy are you using?


a. acceptance
b. transference
c. avoidance 
d. mitigation




Question 14
Correct

Mark 1.00 out of 1.00




Which process involves prioritizing risks based on their probability and impact of occurrence?


a. planning risk responses
b. identifying risks
c. performing quantitative risk analysis
d. performing qualitative risk analysis 




Question 15

Correct

Mark 1.00 out of 1.00




Business case are developed at which software project management activity of?


a. Project design
b. Feasibility study 
c. Project execution
d. Planning

Gekoppeld boek

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
6 april 2024
Aantal pagina's
46
Geschreven in
2023/2024
Type
OVERIG
Persoon
Onbekend

Onderwerpen

€6,43
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
foxNotes Acsess Business Academy
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
113
Lid sinds
3 jaar
Aantal volgers
63
Documenten
36
Laatst verkocht
3 weken geleden
saveNotes

5,0

5 beoordelingen

5
5
4
0
3
0
2
0
1
0

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen