100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Samenvatting

Case Sudy Fukushima lecture notes + summary all articles

Beoordeling
-
Verkocht
2
Pagina's
105
Geüpload op
21-12-2023
Geschreven in
2021/2022

Case Sudy Fukushima lecture notes + summary all articles












Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
21 december 2023
Aantal pagina's
105
Geschreven in
2021/2022
Type
Samenvatting

Onderwerpen

Voorbeeld van de inhoud

Introduction to the Fukushima case.
Lecture 1 Wit:
11 March, 2011, the day of the triple disaster.
Great Tohoku Earthquake. 9.0-9.1 magnitude. Most powerful in Japan.
Damage to infrastructure
- Roads inaccessible
- Power outage due to severed power lines
 Tsunami
- Over 30 m in certain places
- 500 km of Japanese east coast devastated
- Water covered area 90% of Tokyo
- Highest tsunami in history
HQ in Prime Minister office.
- Crisis management center
- Disaster countermeasures
- decapitation of local governments
Mobilization of Japanese self-defense forces.
- Support from the US. Operation Tomodachi.
- Countries and international organizations
- Civil society, large amount of volunteers
- NGO’s (institutions coordinating disaster relief across Japan)
Disaster:

,
,Actors:

On site: workers
Off site: Supervisor Yoshida
Leader: PM Naoto Kan




Humanitarian crisis:
470.000 people displaced at peak crisis
170.000 due to natural disasters
Still lots of people are displaced.
Consequences and aftermath:
Support for evacuees and reconstruction of the region
reviving industries and livelihoods.
decommisioning Daichi and nuclear safety.

, Reading Kushia 2016: Learning from a disaster
Fukushima Daiichi plant had 6 reactors, 1, 2 & 3 were operational. (the rest, routine maintenance)
After earthquake, reactors scrammed (SCRAM), emergency shutdown.
All external power was cut off, but internal power (EDG’s and batteries0 began to operate pumps
and cool system.

Tsunami obliterated the seawall, destroyed all on-site back-up power sources and pumps (necessary
to cool down reactor). Without capability to cool  core meltdown and hydrogen explosion.

No direct deaths because of radiation. Disaster 7 on a scale of INES. Maximum, just like Chernobyl (6
times more radiation due to explosion core reactor)

Too cool down reactor: seawater into fuel pools and reactor  contaminated water. Partly released
into the Pacific.

EARTHQUAKE

 Operations center buildings catastrophically damaged, almost unusable.
 Completely dependent on its on-site backup power sources.
 Staff evacuated to a newly constructed emergency operations center, built on slightly higher
ground and designed to withstand strong earthquakes.
Had this structure not existed, the lack of a viable on-site staging ground for the rescue
operation would have likely led to a significantly worse outcome. This seismically reinforced
operations center had been completed just eight months prior to the earthquake

TSUNAMI

 10 m. seawall designed to stop a tsunami only up to 5.7 meters. Waves of 12 meter
 Destroyed much of cooling system. Pumps seawater  reactor building. Cool fuel rods.
 Almost all of the on-site backup power sources and infrastructure—the diesel generators,
batteries, and circuit boards for the plant.
 Lost capability to cool.

The Fukushima Daiichi Reactors 1, 2, and 3, which were operating at the time of the disaster, were
boiling water reactors (BWR). In a BWR, heat from the nuclear reactions of fuel rods within a sealed
chamber boils water under high pressure, creating steam that rotates turbines to generate
electricity. The total seawater requirement was almost 1.9 million tons daily for this one plant.

Initial scrams - emergency shutdowns of the fuel core reactions—were successful.
But even after shutting down, the fuel rods retained considerable heat, requiring large amounts of
water for cooling.
Restoring cooling capabilities was of paramount importance.

Not been able to cool the reactors and could not monitor the water levels of Reactors 1 and 2,
Fukushima Daiichi plant manager Masao Yoshida officially declared a “nuclear emergency in
progress,” in accordance with the Nuclear Emergency Preparedness Act. As soon as the hot core
evaporated the water and exposed the fuel rods, the rods would overheat and become damaged,
resulting in the phenomenon commonly labeled “meltdown.”

As events rapidly unfolded, severe information and communications problems at all levels of
decision-making plagued the recovery effort.
The earthquake paralyzed telecommunications networks around the country, and in the Tokyo

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
mauritshorst Universiteit Leiden
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
27
Lid sinds
3 jaar
Aantal volgers
15
Documenten
12
Laatst verkocht
1 maand geleden

2,5

2 beoordelingen

5
0
4
0
3
1
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen