These are notes that give a general understanding of the EIA process in South Africa. It provides the general requirements outlined by NEMA and gives what is expected of you as an EAP.

Instelling
Vak

Voorbeeld van de inhoud

Lecture 7:
 Intrenched in legislation – in acting principles that found in constitution.
o Avenue of being enforced (NEMA) – what are principles that contained
and required for authorisation processes?
 Specific environmental management act (SEMAs) = waste management act,
biodiversity act, water act, heritage resources act, integrated coastal management
act
 May trigger environmental authorisation under NEMA but does not exclude SEMA
(can trigger in both forms of legislation).
o SEMA different application but run concurrently with NEMA (if air quality listed
activity and air quality for approval)
o Know different legislation – scope of the act (what is applicable to).
o Show if there are different authorizations required under the act.
 NEMA environmental authorisation types:
o Basic assessment process
 Smaller scale development when knowing the potential impacts (takes
180 – 200 days)
 Legislation tell the timeframes – can’t lapse then have to restart (high
cost)
 R2000 application.
o Scoping and EIA processes
 300-350 days
 Types of large-scale of development and the impacts are significant
and unknown.
 Large amount of specialist’s studies
 R10000 application fee.
o Section 24G process (listed activity has commenced without authorisation –
farmers starting development without authorisation)
 No timeframes associated.
 Levees – depending on how bad then administer fine that vary
between R200000 – R10 million.
 Generic EIA process (full scoping)
o Project
o Screening
 EIA not required.
 EIA required.
 Scoping
 Impact assessment
 Draft environmental management plan
 EIA report
 Review
 Decision
o Approved
o Not approved



 Screening: proponent provides a detailed project description (normally has
associated activities which may trigger) – location and the associated infrastructure
o Listing notices 1 and 3: basic assessment processes

,  Listing notices 3 refers to specific regions and differs in different
provinces (dependent on the project and look at the specific areas that
trigger the listing)
o Listing notices 2: full scoping and EIA
o There have been many amendments since NEMA started but the most
relevant is 2017.
o Listing shows different thresholds and take note of the fact that in listing
notice of and/ or factors when both.
 If not over the threshold, then does not require EIA.
 Definitions are important for explanation to differentiate concepts.
o Exclusions are included.
o Identified potential listed activities – different provinces and look at
applicability checklist (may be excluded but need confirmation from listed
authorities)
 Proposed development and list associated activities that are thought
applicable or not applicable and then the government will give
documented proof.
 The national government doesn’t have an applicability checklist.
o Always make sure up to date with the correct application form.
o Screening tool: potential things associated with the development (help
standardize for EAPs, and help determine the kind of specialists required,
bought out by the government)
 Screening tool report must be attached to all final document reports.
 Can dispute information because the screening tool uses
historical data and therefore requires specialists to prove if the
themes in the screening tool are correct.
 High sensitivity rating in theme then full scoping but if low then
can say no further specialists are required, just a compliance
statement unless specialists say that don’t need it because not
present.
 Very high, high and medium require specialists.
o Site verification when EAP agrees or disagrees with the screening tool.
o A site visit is always required by law to be done.
o Determine specialists and technical inputs required from the screening tool
and therefore if full application.
 Have to identify authority for an application form that has all the
information – CV of the person conducting.
 Submit notice of intent of application
 Arrange a pre-application meeting with the competent official.
o Before submitting the application have to have a draft and then have done 30
days of public participation and therefore have to submit upfront.


 From 2022 have to be registered EAPs to all EIA.
 Development setback: setback line defined or adopted by the competent authority
(doesn’t look at large area when there is only one triggered activity and want to
exclude that then only have in the area of development and exclude notice)
o Won’t know if someone has applied for a setback line – would have to ask
authority.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
27 september 2023
Aantal pagina's
12
Geschreven in
2023/2024
Type
College aantekeningen
Docent(en)
Kim
Bevat
Alle colleges

Onderwerpen

€3,20
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
shannonhyslop

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
shannonhyslop Stellenbosch University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
3 jaar
Aantal volgers
4
Documenten
19
Laatst verkocht
1 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen