Sap Certification Exam Unit Assessments (With Error-Free Solutions)
Real-time MRP processing is not possible with SAP S/4HANA. True or False? correct answers - False Advances in S/4Hana include all the following except. (choose 3) - Cloud use only - Preventive analysis - Advanced text mining - Simulations - Increased footprint - Powerful real-time decision support correct answers - Cloud use only - Preventive analysis - Increased footprint OLTP and OLAP are separate in SAP S/4 HANA. True or False? correct answers - False SAP S/4HANA's new generation of the suite comprises a new: (choose 3) - User interface - SAP Fiori user experience (UX) - Guided configurations - Code base correct answers - SAP Fiori use experience (UX) - Guided configurations - Code base Select those which represent facts about SAP S/4HANA (choose 4) - Built on SAP HANA - A 2x smaller data footprint - Unlimited work capacity - Multi-tenancy - Only deployed on the cloud - No locking, parallelism correct answers - Built on SAP HANA - Unlimited work capacity - Multi-tenancy - No locking, parallelism SAP 4/HANA can be Deployed on Premise, Cloud Private option and Cloud Public Options
Geschreven voor
- Instelling
- SAP Certification
- Vak
- SAP Certification
Documentinformatie
- Geüpload op
- 16 juli 2023
- Aantal pagina's
- 34
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
real time mrp processing is not possible with sap
Ook beschikbaar in voordeelbundel