SAP S/4HANA Full List (TS410 Exam) Updated 2022.
SAP S/4HANA Full List (TS410 Exam) Updated 2022. What are the scope of a planning run? -Regenerative Planning -Net Change for Total Horizon What is the purpose of Material Ledger? -the elimination of locking and increase throughput for standard pricing for material valuation -improved and flexible valuation methods in multiple currencies and parallel accounting What is the output of an MRP run? -Planned Order -Purchase Req for Dependent Requirements -Reservation for Dependent Items What is the master data need for Adv. Planning? - Location - Product - Resource List the Options for Running MRP? - Total Planning - Single Item Planning Multilevel - Single Item Planning Single Level - Single Item Planning Interactive What is the difference between the stock requirements list and the MRP list? Stock Req - Real Time / Dynamic MRP List - Static / Frozen What is the difference between MRP and Consumption Based Planning? MRP - planned on requirements (future, current, forecast) CBP - planning on historical data (historical) What does a work center control? Standard Values Scheduling Capacity Costing Cost Center Formulas Activity Types What is the result of a completion confirmation? - Progress of the order / status update - GR partial or final - Time Activity Update - Scrap leftover material What happens, on the Stock Requirements List, when a planned order is converted to a production order for the finished product: - planned order converts to production order - BOM + routing is copied from planned order to production order
Documentinformatie
- Geüpload op
- 3 mei 2023
- Aantal pagina's
- 17
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden