SAP S/4HANA Full List (TS410 Exam) 100% verified answers 2023
What are the scope of a planning run? -Regenerative Planning -Net Change for Total Horizon What is the purpose of Material Ledger? -the elimination of locking and increase throughput for standard pricing for material valuation -improved and flexible valuation methods in multiple currencies and parallel accounting 01:07 01:29 What is the output of an MRP run? -Planned Order -Purchase Req for Dependent Requirements -Reservation for Dependent Items What is the master data need for Adv. Planning? - Location - Product - Resource List the Options for Running MRP? - Total Planning - Single Item Planning Multilevel - Single Item Planning Single Level - Single Item Planning Interactive What is the difference between the stock requirements list and the MRP list? Stock Req - Real Time / Dynamic MRP List - Static / Frozen What is the difference between MRP and Consumption Based Planning? MRP - planned on requirements (future, current, forecast) CBP - planning on historical data (historical) What does a work center control? Standard Values Scheduling Capacity Costing Cost Center Formulas Activity Types What is the result of a completion confirmation? - Progress of the order / status update - GR partial or final - Time Activity Update - Scrap leftover material What happens, on the Stock Requirements List, when a planned order is converted to a production order for the finished product: - planned order converts to production order - BOM + routing is copied from planned order to production order What happens, on the Stock Requirements List, when a planned order is converted to a production order for the components: - reservations for dependent components What is a standard cost estimate used for? -Determine the sales price - Update the standard price in material master - Calculate the planned cost in a production order What is a work center? - type of time (days, hours) - where - who - identifies the resources - formula calculations Describe each of the different types of goods movements. - GR - GI - Stock Transfer / Transfer Posting What is a routing? Sequence of steps to complete the work Quantity of time to complete the work What transactions debit a production order? GI Confirmation External Processing Overhead Direct FI Postings What transactions credit a production order? GR Settlement How is a Stock Transport Order used to complete a stock transfer? GI for sending plant GR for receiving plant What is the difference between a one step and a two-step stock transfer? Authorizations needed to complete step Number of Documents Level of Control List the solutions of the SAP S4 HANA Suite Ariba Concur Successfactors Fieldglass Hybris List the key innovations developed for SAP S4 HANA MRP Inv Management Material Valuation Capacity Planning Available to Promise and Backorder Processing Order Management and Billing Procurement List the Key Aspects of SAP S4 HANA UX Footprint Reduction Choice of Development Work Patterns Native Capabilities Design Support What is the content of the Simplification List? Recommendations Business Impact Description What are the features of OLTP and OLAP Reporting? HANA Brings them together What is CDS view Core Data Services How is SAP Fiori UX different from traditional interface design? UI focuses on interface only UX focuses on users experience & emotions
Documentinformatie
- Geüpload op
- 13 februari 2023
- Aantal pagina's
- 32
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden