Module Exam
,CS ICC Code Specialist Module Exam
Question 1
Which item belongs to the technical work described as Calculating required setbacks,
yards, and maximum percentages of lot coverage?
A. specifications for submittal
B. Calculating areas
C. engineered construction drawings
D. Calculating required setbacks
Correct Answer: D
Full Explanation:
Calculating required setbacks is included in Site Plan Review. The technical work concerns Calculating
required setbacks, yards, and maximum percentages of lot coverage; this places the selected item
within that responsibility.
Question 2
An assessment of Perform Calculations and Use Scales is followed by a task involving
Investigating property history, previous violations, and existing permits. Which most
specific subject best identifies the transition in technical focus?
A. Read Maps
B. Perform Calculations and Use Scales
C. Records Research
D. Appeals and Revocation
Correct Answer: C
Full Explanation:
The subsequent task concerns Records Research. The change in responsibility should therefore be
recognized as a change in technical focus, rather than assuming that every subsequent activity
remains within Perform Calculations and Use Scales.
Question 3
Case 1 concerns Managing emergency mitigation and demolition procedures. Case 2
concerns Ensuring public and internal accessibility of administrative records. Which
pairing identifies the appropriate subject for each case?
A. Hazard Abatement; then Records Management
B. Inspections and Certificate of Occupancy; then Records Management
C. Records Management; then Hazard Abatement
D. Hazard Abatement; then Records Research
Correct Answer: A
Full Explanation:
The first responsibility belongs with Hazard Abatement, while the second belongs with Records
Management. The distinction preserves the technical subject of each task; exchanging the two
subjects or replacing either with another area changes the required focus.
2
,CS ICC Code Specialist Module Exam
Question 4
Two assignments were exchanged by mistake: the first concerns Administering policies
and lawful procedures required for entry onto private property for authorized
enforcement purposes, and the second concerns Verifying structure locations on lots
against zoning, setback, and engineering requirements. Which order restores the
correct technical assignments?
A. Hazard Abatement; then Site Plan Review
B. Right of Entry; then Site Plan Review
C. Site Plan Review; then Right of Entry
D. Right of Entry; then Right-of-Way, Utilities, and Easements
Correct Answer: B
Full Explanation:
The first responsibility belongs with Right of Entry, while the second belongs with Site Plan Review.
The distinction preserves the technical subject of each task; exchanging the two subjects or replacing
either with another area changes the required focus.
Question 5
A reviewer describes one task as Calculating and verifying valuations and fees. Which
most specific technical subject should be retained when distinguishing that task from
Basic Building Concepts?
A. Right-of-Way, Utilities, and Easements
B. Right of Entry
C. Basic Building Concepts
D. Permit Issuance and Fees
Correct Answer: D
Full Explanation:
The described task is associated with Permit Issuance and Fees. Basic Building Concepts represents
another technical area. Distinguishing tasks by their actual subject prevents a broad assessment
from losing the specific responsibility being tested.
3
,CS ICC Code Specialist Module Exam
Question 6
For Review and Related Documents, an assessment already includes Verifying content
of architectural plans. Which item would extend the review to a different relevant
element?
A. Regulating construction
B. construction materials
C. or national governing authorities
D. engineered construction drawings
Correct Answer: D
Full Explanation:
Addressing Verifying content of architectural plans covers one element of Review and Related
Documents; engineered construction drawings adds another. The technical responsibility includes
Verifying content of architectural plans, engineered construction drawings, and specifications for
submittal.
Question 7
A reviewer describes one task as Processing administrative appeals, board of appeals
hearings, and related documentation. Which most specific technical subject should be
retained when distinguishing that task from Read Maps?
A. Appeals and Revocation
B. Read Maps
C. Permits, Notices, and Orders
D. Site Plan Review
Correct Answer: A
Full Explanation:
The described task is associated with Appeals and Revocation. Read Maps represents another
technical area. Distinguishing tasks by their actual subject prevents a broad assessment from losing
the specific responsibility being tested.
4