• Verkeerd document? Gratis ruilen
  • Geschreven door studenten die geslaagd zijn
  • Direct beschikbaar na je betaling
  • Online lezen of als PDF
Verkopen
Kies je studieland
Kies je taal
Document preview thumbnail
Voorbeeld 2 van de 5 pagina's
Tentamen (uitwerkingen)

NERC Practice Test Question Set - Expert-Verified Solutions

Document preview thumbnail
Voorbeeld 2 van de 5 pagina's

NERC Practice Test Question Set - Expert-Verified Solutions a. 100 MW - answer - Using the shown diagram, determine the HVDC schedule. a. 100 MW b. 150 MW c. 200 MW d. 300 MW b. The Balancing Authority would over respond to an external loss of generation - answer - What would be the consequence of an interconnected Balancing Area operating with its AGC in Flat Frequency mode? a. The Balancing Authority would not respond sufficiently to an external loss of generation b. The Balancing Authority would over respond to an external loss of generation c. The primary frequency response from governor action will be withdrawn by AGC d. ACE will no longer be affected by an external loss of generation d. Decrease output of Generator 2 - answer - Use the diagram to answer the following question: Line 2 is exceeding its SOL by 20 MW. Which of the following actions would be most appropriate? a. Increase the HVDC schedule by 50 MW b. Shed load at Load 2 c. Decrease output of Generator 1 d. Decrease output of Generator 2 c. The primary frequency response from governor action will be withdrawn by AGC - answer - What would be the consequence of an interconnected Balancing Area operating with its AGC in Flat Tie-line mode? a. An internal loss of generation would not affect ACE b. The Balancing Authority would over respond to an external loss of generation c. The primary frequency response from governor action will be withdrawn by AGC d. An external loss of generation would not affect ACE b. Shed load at Load 2 - answer - Use the diagram to answer the following question: Line 3 is exceeding its SOL by 20 MW. Which of the following actions would be most appropriate? a. Increase the HVDC schedule by 50 MW b. Shed load at Load 2 c. Decrease output of Generator 1 d. Decrease output of Generator 2 b. EEA 2 - answer - Balancing Authority Z is unable to meet its demand, however, is maintaining its Contingency Reserve requirements. What Energy Emergency Alert level is the Balancing Authority in? a. EEA 1 b. EEA 2 c. EEA 3 d. This condition does not require an EEA c. EEA 3 - answer - Balancing Authority C has implemented demand management procedures per its EOP-011 Emergency Operating Plan for Energy and Capacity Emergencies. The expected demand peak is two hours away and the Balancing Authority is developing a load shed plan for implementation. What level EEA should the Balancing Authority request from the Reliability Coordinator? a. EEA 1 b. EEA 2 c. EEA 3 d. This condition does not require an EEA b. Transmission Operator - answer - A low voltage event has resulted in load shed of 290 MW. Who is responsible for reporting? a. Balancing Authority b. Transmission Operator c. Load Serving Entity d. This is not a reportable event per EOP-004 b. Planned outage of primary control center for 2 weeks - answer - When is a tertiary control center necessary? a. Planned outage of primary control center for 1 week b. Planned outage of primary control center for 2 weeks c. Planned outage of primary control center for 1 month d. Anytime the primary control center is out c. Thermal - answer - Exceeding which of the following transmission line ratings will result in line sag? a. Stability b. Voltage c. Thermal d. PV Curve a. GIC - answer - Which of the following could result in EHV transformer problems and loss of reactive resources? a. GIC b. Sub-synchronous resonance c. Ferranti rise d. AGC malfunction a. Balancing Authority - answer - Which of the following entities is responsible for developing load forecasts? a. Balancing Authority b. Distribution Provider c. Purchase-Selling Entity d. Load-Serving Entity b. PV - answer - What type of solar is instantaneous? a. Concentrated Solar b. PV c. Parabolic Trough d. Saturated Thermal a. MVAR output will decrease - answer - During system restoration, what will a generator producing MVAR do when a nearby line is placed in service? a. MVAR output will decrease b. MVAR output will increase c. MW output will decrease


Documentinformatie

Geüpload op
26 november 2026
Aantal pagina's
5
Geschreven in
2026/2027
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€10,34

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SARAHnkalu
4,6
(7)
Verkocht
50
Volgers
0
Items
9092
Laatst verkocht
2 dagen geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen

Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.