Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 36 pagina's
Tentamen (uitwerkingen)

DBIA Certification Exam Practice Test (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+

Document preview thumbnail
Voorbeeld 4 van de 36 pagina's

DBIA Certification Exam Practice Test (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+ DBIA Certification Exam Practice Test (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+

Voorbeeld van de inhoud

DBIA Certification Exam Practice Test
(New Update 2026/2027) Questions
with 100% Correct Answers| Graded A+
Question:

How is Design-Builder selected?
i,- i,- i,-




Answer:
Qualification-Based or best value i,- i,- i,-




Question:

similar to design build, in industrial and power generation sectors,
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


systems and performance testing are central to scope, contractor will
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


typically perform engineering with its in-house staff, owner has need for
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



single point responsibility, contracts include plant and process
i,- i,- i,- i,- i,- i,- i,- i,-


performance guarantees, contract items include performance and
i,- i,- i,- i,- i,- i,- i,-


schedule liquidated damages and limitations of liability?
i,- i,- i,- i,- i,- i,-




Answer:
Engineer Procure Construct i,- i,-




Question:
owner contracts with multiple trade contractors, attributes are typically
i,- i,- i,- i,- i,- i,- i,- i,- i,-


similar to DBB, owner's ability to schedule and coordinate the work?
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-

,Answer:
Multiple Prime Contracti,- i,-




Question:

multi-party agreement - all parties equal, QBS procurement and target
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


pricing contract approach, private sector use (limited at this time), key:
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



owner's ability to accept risk?
i,- i,- i,- i,-




Answer:
Integrated Project Delivery i,- i,-




Question:

instead of government building and maintaining major infrastructure
i,- i,- i,- i,- i,- i,- i,- i,-



(such as highway, water treatment plant), build and maintenance is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


outsourced to a private company. Opposed by public sector unions. this is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


not considered a delivery system but its underlying approaches are
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


delivery systems and typically use DB. multiple procurement and
i,- i,- i,- i,- i,- i,- i,- i,- i,-



contracting approaches? i,-




Answer:

Public-Private-Partnership




Question:

,Intense efforts to establish scope early in the process; drives early team
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


formation to include key trade subcontractors; can enable big decisions to
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


be made early, affect project outcomes at lower cost, establish a need for
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


location and collaboration, and compress times during concurrent design
i,- i,- i,- i,- i,- i,- i,- i,- i,-



and construction?
i,-




Answer:

shift left i,-




Question:

Typically two-phase best value procurement with lump sum contract;
i,- i,- i,- i,- i,- i,- i,- i,- i,-


owner defines project requirements and scope of prescriptive work; use of
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


performance-based technical requirements with limited perspective i,- i,- i,- i,- i,- i,-


specifications?

Answer:
traditional design build i,- i,-




Question:
design and procurement are progressively developed after the design-
i,- i,- i,- i,- i,- i,- i,- i,-


builder is under contract; final project cost and schedule commitment is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



not established as part of the selection process; two phases; preliminary
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


services and final design and construction services?
i,- i,- i,- i,- i,- i,-




Answer:

Progressive design build i,- i,-

, Question:

What documents describe the end result?
i,- i,- i,- i,- i,-




Answer:

Criteria documents
i,-




Question:

Prescribes how to achieve the end result?
i,- i,- i,- i,- i,- i,-




Answer:
Bridging Documents i,-




Question:
Prior to bidding, owner undertakes a process to design the project and all
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


of its details to 100% complete plans and specs. The owner is therefore
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


responsible for success or failure of details of the design, and warrants the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


sufficiency of design to the contractor. The owner is therefore liable to the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



contractor for any gaps between plans and specs and owner's
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


requirements for project performance? i,- i,- i,-




Answer:
Design bid build paradigm
i,- i,- i,-

Documentinformatie

Geüpload op
2 september 2026
Aantal pagina's
36
Geschreven in
2026/2027
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€12,59

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
AcademiaExpert
3,8
(520)
Verkocht
2023
Volgers
767
Items
4552
Laatst verkocht
5 uur geleden


Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen