◍ The maintenance procedure steps on the MRC are.
Answer: TO BE FOLLOWED PRECISELY
◍ The objectives of first aid are save lives,.
Answer: PREVENT FURTHER INJURY, LIMIT INFECTION
◍ A five inch outside micrometer will measure objects that are ....... inches
thick..
Answer: 4-5IN
◍ A term used to describe total breakdown of the body's heat balance is .......
Answer: HEAT STROKE
◍ Which of the following periodicity code is used when a maintenance
requirement is performed monthly?.
Answer: M
◍ Torque wrenches are considered ....... equipment.
Answer: PRECISION
◍ Readings on the WBGT may only be taken after verifying the internal
calibration to within plus or minus .......
Answer: 0.2
◍ Which procedure does NOT require eye protection?.
Answer: NORMAL OPERATION OF A LUBE OIL SYSTEM
◍ The responsibility to replace a missing MRC belongs to the ........
Answer: WORK CENTER SUPERVISOR
◍ All "Cleared" Danger/Caution tag-out Record Sheets are filed in section five
until ........
, Answer: THE NEXT TAG OUT AUDIT
◍ The overall purpose of PQS is to .......
Answer: provide a means to qualify ships personnel.
◍ Which Emergency Escape Breathing Device can be wall mounted
(INTERNATIONAL ORANGE storage case) or belt-worn to provide quick
and easy access?.
Answer: OCENCO
◍ The Scott EEBD device is operated by .......
Answer: A PULL PIN MECHANISM
◍ In the Hearing Conservation Program, physical exclusion is referred to as.
Answer: AUDITORY REST
◍ Which document is use to verify that you have the proper MRC?.
Answer: MIP (MAINTENANCE INDEX PAGE)
◍ Which of the following serves as the "Table of Contents" for the Work
Center PMS manual?.
Answer: LIST OF EFFECTIVE PAGES (LOEP)
◍ The SYSCOM Control Number assigned for each maintenance requirement
listed in a MIP must match the number on the corresponding.
Answer: MRC (maintenance requirement card)
◍ Materials needed to perform the required maintenance are found on the.
Answer: FRONT OF THE MRC
◍ Who is responsible for ensuring that PMS is performed on eyewash
stations?.
Answer: DIVISION OFFICER
◍ Which schedule is NOT used in the 3M system?.
Answer: DAILY
◍ Electrical power tools must be inspected prior to issue by a qualified ........
Answer: ELECTRICIAN
QUESTIONS WITH ANSWERS GRADED A+
◍ The maintenance procedure steps on the MRC are.
Answer: TO BE FOLLOWED PRECISELY
◍ The objectives of first aid are save lives,.
Answer: PREVENT FURTHER INJURY, LIMIT INFECTION
◍ A five inch outside micrometer will measure objects that are ....... inches
thick..
Answer: 4-5IN
◍ A term used to describe total breakdown of the body's heat balance is .......
Answer: HEAT STROKE
◍ Which of the following periodicity code is used when a maintenance
requirement is performed monthly?.
Answer: M
◍ Torque wrenches are considered ....... equipment.
Answer: PRECISION
◍ Readings on the WBGT may only be taken after verifying the internal
calibration to within plus or minus .......
Answer: 0.2
◍ Which procedure does NOT require eye protection?.
Answer: NORMAL OPERATION OF A LUBE OIL SYSTEM
◍ The responsibility to replace a missing MRC belongs to the ........
Answer: WORK CENTER SUPERVISOR
◍ All "Cleared" Danger/Caution tag-out Record Sheets are filed in section five
until ........
, Answer: THE NEXT TAG OUT AUDIT
◍ The overall purpose of PQS is to .......
Answer: provide a means to qualify ships personnel.
◍ Which Emergency Escape Breathing Device can be wall mounted
(INTERNATIONAL ORANGE storage case) or belt-worn to provide quick
and easy access?.
Answer: OCENCO
◍ The Scott EEBD device is operated by .......
Answer: A PULL PIN MECHANISM
◍ In the Hearing Conservation Program, physical exclusion is referred to as.
Answer: AUDITORY REST
◍ Which document is use to verify that you have the proper MRC?.
Answer: MIP (MAINTENANCE INDEX PAGE)
◍ Which of the following serves as the "Table of Contents" for the Work
Center PMS manual?.
Answer: LIST OF EFFECTIVE PAGES (LOEP)
◍ The SYSCOM Control Number assigned for each maintenance requirement
listed in a MIP must match the number on the corresponding.
Answer: MRC (maintenance requirement card)
◍ Materials needed to perform the required maintenance are found on the.
Answer: FRONT OF THE MRC
◍ Who is responsible for ensuring that PMS is performed on eyewash
stations?.
Answer: DIVISION OFFICER
◍ Which schedule is NOT used in the 3M system?.
Answer: DAILY
◍ Electrical power tools must be inspected prior to issue by a qualified ........
Answer: ELECTRICIAN