Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 7 pagina's
Tentamen (uitwerkingen)

NERC Prep Study Guide & Practice Questions for Certification Exam

Document preview thumbnail
Voorbeeld 2 van de 7 pagina's

Prepare for the NERC certification exam with a comprehensive NERC Prep study resource covering reliability standards, power system operations, grid reliability concepts, and exam-focused practice questions. Ideal for candidates reviewing key topics, strengthening their knowledge, and building confidence before the certification exam.

Voorbeeld van de inhoud

NERC Prep

How much load reduction to 6-10% Load reduction = 1HZ Frequency change same direction
change frequency

5% of online generation
Largest Load block to pick up
during sys resto

Ratio of Voltage change to load 5% change in Voltage=3% change in load (distribution only)
change

Power Losses on Line I squared * R

300 MW uncontrolled loss of load
100MW Firm load shed
50,000 customers out of power greater than 1 hr
3% Voltage reduction
DOE Reporting Conditions Public appeals to reduce load
vandalism, sabotage



60 minutes for initial report
Time requirements for DOT
reporting 48 hrs for followup report

24 hrs normal 72 hrs IROL violoation for intial
NERC reporting time
requirements 60 Days final report


How often must a blackstart gen every 5 years
be tested

How often must a sys resto plan every 1 year
be reviewed/updated

every 3 years (really not sure about this one)
How often must sys resto plan be
tested

Who is responsible for creating a TOP
sys resto plan

how often is ACE calculated every 6 seconds (have seen 4)

1% change in frequency = 2% change in load (approx. depending
ratio of frequency change to load
change on reactive nature of load)


transmission voltages 765, 500, 345,230,138, 115 kv

distribution voltages 240, 120, 4, 13, 26, 69 kv

30 minutes
how long does a gen have to
restart after shutdown without full
restart process


allowable voltage variation during +/- 10%
sys restoration

+/- 5%
allowable voltage variation during
normal condtions

, NERC Prep
59.75 hz - 61 hz (also saw 59.5 hz)
allowable frequency variation
during system resto

power transfer ((V1V2)sin power angle)/Xsubl

100 kV or higher
What voltage is considered part
of the BES

32 hrs
Number of required emergency
ops training hours for sys
operators


Formula for redispatching MW relief required/(GDF GenA-GDF GenB)=change in GenB
output
generation (only for balancing)

Minimum Torque angle for power 10 degrees
to start flowing

1% of estimated peak demand for next year or 1% of estimated
Minimum Frequncy Bias setting
for BA peak generation for next year if not load serving


CPS1 requirement greater than or equal to 100% for rolling 12 month period

CPS 2 requirement greater than or equal to 90% for month (10 minute intervals)

What level of disturbance is 80% of MSST
reportable for DCS

DCS requirement to return to pre 15 minutes
disturbance condition

90 minutes after the end of disturbance period
DCS requirement for recovery
period

1) +/- .02 hz to Fs
2) 20% of B added to NIs if unable to perform frequency
time error correction adjustment


3% of transaction
amount of interchange
transaction intermediate BAs
receive for losses


how long does BA have to submit 60 minutes
emergency RFI

60 minutes
length of time deficient BA can
use assistance from reserve
sharing group before must sumbit
RFI

1 minute
time Interchange Authority has to
distribute arranged interchange

Documentinformatie

Geüpload op
12 augustus 2026
Aantal pagina's
7
Geschreven in
2026/2027
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€9,75

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ACTUALSTUDY
4,7
(724)
Verkocht
2832
Volgers
242
Items
39098
Laatst verkocht
6 dagen geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen