Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 31 pagina's
Tentamen (uitwerkingen)

VA DEQ ESC Inspector Practice Exam With Complete Questions And Correct Answers | Brand New Version | Latest 2026/2027 Update | Graded A+ | 100% Correct.

Document preview thumbnail
Voorbeeld 4 van de 31 pagina's

VA DEQ ESC Inspector Practice Exam With Complete Questions And Correct Answers | Brand New Version | Latest 2026/2027 Update | Graded A+ | 100% Correct. VESCP - ANSWERS: Virginia Erosion and Sediment Control Program - Administered by counties/cities (must), towns (may) - MUST BE APPROVED Minimum Standard 1 - ANSWERS: Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than one year permanent vegetation cover shall be established on denuded areas not otherwise permanently stabilized (permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with this*) reduce erosion and decrease sediment yield from disturbed area this is the standard used to verify that a site is ready for release of bonds or surety Minimum Standard 4 - ANSWERS: First-Step Measures Site at Final Grade - ANSWERS: - stabilize in 7 days (recommended immediately) - permanently or temporarily seed and mulch - mulch/matting/straw Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place a certain amount of initial land disturbance may be required to provide access for equipment to install the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter controls are in place intercepts and detains small amounts of sediment from disturbed areas during construction operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate level channel flow Perimeter Controls - ANSWERS: assures that sediment does not leave the perimeter of the land-disturbing area once site clearing, grading, and construction commences Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions, diversions Sediment Traps - ANSWERS: minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall only control drainage areas less than 3 acres *stone outlet = trap* Sediment Basins - ANSWERS: surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration; runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. Thank you for Purchasing this exam Study Guide. We provide high-quality academic materials to help students excel in exams. Our other Services include but not limited to: academic research, University & College assignments writing, essay writing, Online Classes, and research projects. Our services are reliable, affordable, and plagiarism-free. All the Best in your Exam. For more information; Contact us at: or 0R Sediment Trapping Devises - ANSWERS: 1. place near the lowest drainage points of a project 2. install as a first-step measure [MS-4] 3. stabilize immediately [MS-5] 4. must include outlet protection for basins [MS-11] Minimum Standard 7 - ANSWERS: Cut and Fill Slopes

Voorbeeld van de inhoud

VA DEQ ESC Inspector Practice Exam With Complete
Questions And Correct Answers | Brand New Version |
Latest 2026/2027 Update | Graded A+ | 100% Correct.




VESCP - ANSWERS: Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED



Minimum Standard 1 - ANSWERS: Stabilization


permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site; temporary soil stabilization shall be
applied within seven days to denuded areas that may not be at final grade but will remain
dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to
be left dormant for more than one year



permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is
achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - ANSWERS: First-Step Measures




Site at Final Grade - ANSWERS: - stabilize in 7 days (recommended immediately)

,- permanently or temporarily seed and mulch
- mulch/matting/straw




Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to
trap sediment shall be constructed as a first step in any land-disturbing activity and shall be
made functional before upslope land disturbance takes place


a certain amount of initial land disturbance may be required to provide access for equipment
to install the perimeter controls, but site clearing and grading should be kept to a minimum
until the perimeter controls are in place


intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and
low-to-moderate level channel flow


Perimeter Controls - ANSWERS: assures that sediment does not leave the perimeter of
the land-disturbing area once site clearing, grading, and construction commences


Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary
diversions, diversions




Sediment Traps - ANSWERS: minimum storage capacity shall be 134 cubic yards per
acre of drainage area and shall only control drainage areas less than 3 acres


*stone outlet = trap*



Sediment Basins - ANSWERS: surface runoff from disturbed areas that is comprised of
flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin;
minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage
area; the outfall system shall, at a minimum, maintain the structural integrity of the basin
during a 25-year storm of 24-hour duration; runoff coefficients used in runoff calculations
shall correspond to a bare earth condition or those conditions expected to exist while the
sediment basin is utilized.

,Thank you for Purchasing this exam
Study Guide. We provide high-quality
academic materials to help students
excel in exams. Our other Services
include
but not limited to: academic research,
University & College assignments
writing, essay writing, Online Classes,
and research projects. Our services are
reliable, affordable, and plagiarism-free.
All the Best in your Exam. For more
information;
Contact us at:
or
0R
+254 741484450

Sediment Trapping Devises - ANSWERS: 1. place near the lowest drainage points of a
project

, 2. install as a first-step measure [MS-4]


3. stabilize immediately [MS-5]


4. must include outlet protection for basins [MS-11]



Minimum Standard 7 - ANSWERS: Cut and Fill Slopes



Site NOT at Final Grade - ANSWERS: - stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year




Minimum Standard 2 - ANSWERS: Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact and silt fence
intercepts and detains from disturbed areas


Minimum Standard 3 - ANSWERS: Permanent Vegetation




roughening the surface of the slope decreases runoff, lowers the velocity runoff, increases
water retention, and leads to better seed germination


slopes that are found to be eroding excessively within on year of permanent stabilization shall
be provided with additional slop stabilizing measures until the problem is corrected

Documentinformatie

Geüpload op
12 juni 2026
Aantal pagina's
31
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€15,12

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DRBRIGHT2026
3,7
(191)
Verkocht
965
Volgers
697
Items
7068
Laatst verkocht
17 uur geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen