CMGT Final 9 Study Guide, Practice Questions and Complete Exam Review 2026
schedule - correct answer ✔✔what is the primary tool for project planning?
Gantt charts and network diagrams - correct answer ✔✔the two types of schedule introduced
in this chapter are?
show overall length of the project and each activity - correct answer ✔✔gantt charts are used
to:
activity on the node - correct answer ✔✔what is one type of network diagram?
steel or concrete structure - correct answer ✔✔which of the following is NOT a factor to use
when determining what type of schedule to use?
float schedules - correct answer ✔✔which of the following is NOT how schedules are used?
three weeks - correct answer ✔✔what is the typical period of time used in a short-interval
schedule?
the plotting stage - correct answer ✔✔all of the following are stages of building a schedule
except?
used to keep track of your progress on the job - correct answer ✔✔all of the following are TRUE
regarding project activities except?
none of the above: steel, lighting, millwork, doors - correct answer ✔✔long lead items that fall
into procurement activities include all of the following except?
schedule - correct answer ✔✔what is the primary tool for project planning?
Gantt charts and network diagrams - correct answer ✔✔the two types of schedule introduced
in this chapter are?
show overall length of the project and each activity - correct answer ✔✔gantt charts are used
to:
activity on the node - correct answer ✔✔what is one type of network diagram?
steel or concrete structure - correct answer ✔✔which of the following is NOT a factor to use
when determining what type of schedule to use?
float schedules - correct answer ✔✔which of the following is NOT how schedules are used?
three weeks - correct answer ✔✔what is the typical period of time used in a short-interval
schedule?
the plotting stage - correct answer ✔✔all of the following are stages of building a schedule
except?
used to keep track of your progress on the job - correct answer ✔✔all of the following are TRUE
regarding project activities except?
none of the above: steel, lighting, millwork, doors - correct answer ✔✔long lead items that fall
into procurement activities include all of the following except?