VA CONTRACTOR GENERAL QUESTIONS WITH ANSWERS 100% CORRECT

Document preview thumbnail
Voorbeeld 2 van de 5 pagina's

A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when the contractor does not renew his license on time? - ANSWER-The Licensee Contractor A Designated Employee should be? - ANSWER-At least 18, Full Time, Passed Required Exams What is the initial Recovery Fund fee? - ANSWER-$25.00 If a contractor ears more that $_______ per year, then the contractor is required to have a Class A. - ANSWER-$750,000.00

Voorbeeld van de inhoud

VA CONTRACTOR GENERAL
QUESTIONS WITH ANSWERS 100%
CORRECT
A contractor does not notify a change of address and so does not receive a timely
Notice of Renewal. Who is responsible for when the contractor does not renew his
license on time? - ANSWER-The Licensee Contractor

A Designated Employee should be? - ANSWER-At least 18, Full Time, Passed
Required Exams

What is the initial Recovery Fund fee? - ANSWER-$25.00

If a contractor ears more that $_______ per year, then the contractor is required to
have a Class A. - ANSWER-$750,000.00

If a contract awards more than $_________ per payment, the contractor is required
to have a Class A. - ANSWER-$120,000.00

An Erosion control conservation plan needs to be approved within ____ days. -
ANSWER-45

Where do you go to file an appeal of a violation to the USBC provisions? -
ANSWER-To The BBCA

A contractor is required to submit a renewal within____ days of the expiration date? -
ANSWER-30

Who can file a complaint against a contractor? - ANSWER-any one

What is required when changing the from of entity from a sole proprietorship to a
corporation - ANSWER-A new license

What is the maximum fund allowed for a single contractor? - ANSWER-$40,000.00

To Whom should the stop work order be given? - ANSWER-Owner, Owner's Agent,
Contractor

Within how many days should be submitted an appeal for construction? - ANSWER-
90 Days

Where is the Recovery Fund used? - ANSWER-to pay claimants subject to improper
or dishonest conduct

Disturbed land areas of less than ______ sq ft in size may not be an issue of
sediment and erosion control. - ANSWER-10,000

, Which of the following is permitted to receive awards from the Fund? - ANSWER-
Property Owner

An appeal of the local building officials decision to refuse to grant a modification to
the USBC MUST be made within how many days? - ANSWER-90 Days

Documents related to a contract should be kept for ______ years? - ANSWER-5
Years

Where should one set of all approved building documents be kept? - ANSWER-At
the building site

An erosion control conservation specification needs to be approved within_____
days - ANSWER-60 days

After notification by the code official, an application for a permit shall be considered
to have been abandoned for _____ months - ANSWER-6

The Board can refuse to renew a license when the principal owner is a former owner
or officer of a firm that______ - ANSWER-Had its contractor licensee revoked

what is the maximum amount a single contractor's Transaction Recovery Fund claim
against a licensee can be? - ANSWER-$40,000.00

What is the maximum amount that can be paid out on behalf of a single contractor? -
ANSWER-$40,000.00

A license was issued on 10/15/2003. The expiration date is? - ANSWER-10/31/2005

A designated employee must work a minimum of how many hours for licensed
contracting business? - ANSWER-30 Hours

Where must a building permit be kept? - ANSWER-at the building site

Who may make a claim for a payment from the contractors Recovery Trust Fund? -
ANSWER-a property owner who contracted with the licensee

A permit has been issued and construction is underway. The inspection must take
place in? - ANSWER-six months

Soil stabilization MUST be applied to denuded areas within how many days after
final grade is reached on any portion of the site? - ANSWER-7 days

A contractor must apply for reinstatement rather than renewal if the renewal
application and fee are not submitted within how many days of expiration? -
ANSWER-30 days

A new building may be used after ______________ is issued. - ANSWER-certificate
of occupancy

Documentinformatie

Geüpload op
15 mei 2026
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€12,00

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Verkocht
1
Volgers
0
Items
190
Laatst verkocht
2 maanden geleden


Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen