Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 5 pagina's
Tentamen (uitwerkingen)

SEDIMENTATION AND EROSION CONTROL CERTIFICATION

Document preview thumbnail
Voorbeeld 2 van de 5 pagina's

SEDIMENTATION AND EROSION CONTROL CERTIFICATION

Voorbeeld van de inhoud

SEDIMENTATION AND EROSION
CONTROL CERTIFICATION


Erosion - ans- sq sq




is the process by which land surface is worn away by the action of wind, water, and gravity.
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




Sedimentation - ans-is the settling of soil particles sq sq sq sq sq sq sq




Soil erosion is classified as either ____ erosion or ____ erosion - ans-wind , water
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




Water erosion can be classified as either ______ erosion or _____ erosion - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




overland , stream sq sq




Four processes of overland erosion - ans-
sq sq sq sq sq sq




splash erosion, sheet erosion, rill erosion, gully erosion
sq sq sq sq sq sq sq




Four principle factors influencing soil erosion are - ans-
sq sq sq sq sq sq sq sq




soil characteristics, vegetative cover, topography, climate
sq sq sq sq sq




Physical effects of erosion and sedimentation - ans-
sq sq sq sq sq sq sq




increase flooding, reduce hydraulic capacity, increased maintenance of storm water syste
sq sq sq sq sq sq sq sq sq sq




ms, increased water treatment costs, decreased recreational value
sq sq sq sq sq sq sq




Biological effects of erosion and sedimentation - ans- sq sq sq sq sq sq sq




reduced light for aquatic plants, clogs fish gills, impairs spawning, disrupts food chain, blan
sq sq sq sq sq sq sq sq sq sq sq sq sq




kets bottom, disrupts ecosystem
sq sq sq




Minimize the _______ of the area exposed at one time and the ______ of exposure - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




extent, duration sq




Apply __________ practices to protect the disturbed area from off-
sq sq sq sq sq sq sq sq sq




site runoff and to protect off-site areas from sediment damage - ans-perimeter control
sq sq sq sq sq sq sq sq sq sq sq sq




Apply ________ practices to prevent excessive on site damage - ans-erosion control
sq sq sq sq sq sq sq sq sq sq sq




Keep runoff velocities _____ and _____ runoff on site - ans-low , retain
sq sq sq sq sq sq sq sq sq sq sq sq




Stabilize disturbed areas ________ after final grading - ans-inmediately
sq sq sq sq sq sq sq sq

, Implement a thorough ____ and ____ (inspection) program - ans-maintenance, follow up
sq sq sq sq sq sq sq sq sq sq sq




Type A soils have ___ infiltration rates and ___ runoff potential. Examples - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




high, low (Sand) sq sq




Type D soils have _____ infiltration rates and _______ runoff potential. Examples - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




low, high (muck, clay) sq sq sq




Based on EPA guidance, FDEP has determined that ______ also meet the definition of con
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




struction activities - ans-demolition sq sq sq




Any type of soil disturbance over 1 acre must get ______ permit - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




CGP (Construction Generic Permit) sq sq sq




A CGP is required for projects that disturb _____ or more acres of land - ans-1
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




The CGP permit requires inspections how often? - ans-
sq sq sq sq sq sq sq sq




weekly and within 24 hours of the end of a storm 1/2 inch or greater
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




A storm water event with a ______ hour break in between is still considered one storm wate
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




r event - ans-4
sq sq sq




The CGP permit requires sediment basins for areas _____ or more - ans-10 acres
sq sq sq sq sq sq sq sq sq sq sq sq sq




Any BPM that collects sediment must be cleaned before it reaches _____ of it's capacity -
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




ans-50%
sq




Never service construction equipment near a live stream, use storm water sewers instead
sq sq sq sq sq sq sq sq sq sq sq sq sq




T/F - ans-False sq sq




A temporary gravel construction entrance must extend the full width of the entrance. It must
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




be at least _____ ft long and _____ in thick. Aggregate should be _____ in stone or FDOT
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




No. _____ stone - ans-50, 6, 2, 1
sq sq sq sq sq sq sq




Prior to installing gravel entrance ______ should be placed on the ground and maintenanc
sq sq sq sq sq sq sq sq sq sq sq sq sq




e should be performed when the voids are full of ______ - ans-geotextile, sediment
sq sq sq sq sq sq sq sq sq sq sq sq sq




Max drainage are for a silt fence under _____ flow conditions is ____ acre per 100 ft of barri
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




er length - ans-sheet, 1/4
sq sq sq sq




The average usable life of a silt fence is ____ months - ans-6
sq sq sq sq sq sq sq sq sq sq sq sq




For proper installation of silt fence a trench ____ by _____ must be excavated. This will allo
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




w_______ of fabric to extend into the ground for back-filling and compaction - ans-4, 4, 8
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq

Documentinformatie

Geüpload op
1 mei 2026
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€12,89

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Verkocht
19
Volgers
1
Items
1153
Laatst verkocht
6 dagen geleden


Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen