Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 5 pagina's
Tentamen (uitwerkingen)

QISP Introduction Comprehensive Exam UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Document preview thumbnail
Voorbeeld 2 van de 5 pagina's

QISP Introduction Comprehensive Exam UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS In order to obtain NOI coverage under the IGP, PRDs include: - CORRECT ANSWER electronic certification by the LRP Permit registration fee Site Map SWPPP NOI and If the discharger must redact information in order to comply with federal law that addresses security in the US, the discharger must also submit - CORRECT ANSWER A written justification that the information redaction is necessary to comply with federal law What are three reasons for a discharger submitting an NOT in SMARTs? - CORRECT ANSWER -the facilities' industrial operations have changed and are no longer subject to the IGP -operation of the facility has been transferred to another entity -the facility has ceased operations, completed closure activities, and removed all industrial related pollutants A person in which position would be eligible to be an LRP: Maintenance supervisor, QISP consultant, Public works director, or Monitoring consultant? - CORRECT ANSWER Public works director The temporary suspension of industrial activities requires what to be uploaded in SMARTS? - CORRECT ANSWER -The justification for why the monitoring is infeasible at the facility during the temporary suspension -The projected date that the industrial activities will resume at the facility -SWPPP revisions specifically addresses the facility stabilization BMPs -The date the facility is fully stabilized for temporary suspension of industrial activities

Voorbeeld van de inhoud

QISP Introduction Comprehensive Exam
UPDATED ACTUAL QUESTIONS AND
CORRECT ANSWERS
In order to obtain NOI coverage under the IGP, PRDs include: - CORRECT ANSWER NOI and
electronic certification by the LRP

Permit registration fee

Site Map

SWPPP



If the discharger must redact information in order to comply with federal law that addresses security
in the US, the discharger must also submit - CORRECT ANSWER A written justification that
the information redaction is necessary to comply with federal law



What are three reasons for a discharger submitting an NOT in SMARTs? - CORRECT
ANSWER -the facilities' industrial operations have changed and are no longer subject to the
IGP

-operation of the facility has been transferred to another entity

-the facility has ceased operations, completed closure activities, and removed all industrial related
pollutants



A person in which position would be eligible to be an LRP: Maintenance supervisor, QISP consultant,
Public works director, or Monitoring consultant? - CORRECT ANSWER Public works director



The temporary suspension of industrial activities requires what to be uploaded in SMARTS? -
CORRECT ANSWER -The justification for why the monitoring is infeasible at the facility
during the temporary suspension

-The projected date that the industrial activities will resume at the facility

-SWPPP revisions specifically addresses the facility stabilization BMPs

-The date the facility is fully stabilized for temporary suspension of industrial activities



Authorized NSWDs include which of the following: discharges from a broken water main in an
employee parking lot; fire hydrant testing; rinse water from industrial equipment washing, BMPs are

, deployed as needed; water from landscape irrigation that runs through the facility's stockpiled
materials? - CORRECT ANSWER Fire Hydrant Testing



Name four things required to be in the SWPPP? - CORRECT ANSWER -Storm Water
Pollution Prevention Team members

-Potential pollutant sources

-Scheduled facility operating hours

-Minimum BMPs



Which of the following must the discharger identify on the facility site map: a restroom's municipal
sanitary sewer connection; structural control measures; analytical sampling values from the previous
reporting year; each BMP implemented at the facility; spills and leaks over 42 gallons from the
previous 6 year period? - CORRECT ANSWER Structural control measures



A discharger that has fulfilled the requirements for the temporary suspension of industrial activities at
a facility is not required to... - CORRECT ANSWER Perform sampling and analysis of storm
water discharges because the discharger has justified that it is infeasible to do so



Water Quality Based Corrective Actions can be required by which agency? - CORRECT
ANSWER Regional Water Board



The IGP does not require training for the: - CORRECT ANSWER LRP (Legally Responsible
Person)



What is the expiration date of the IGP? - CORRECT ANSWER June 30, 2020 or the effective
date of a new IGP



If the discharger's industrial storm water discharges and/or authorized NSWDs contain pollutants that
cause violations of Receiving Water Limitations, what must the discharger implement? - CORRECT
ANSWER Any additional BMPs or SWPPP implementation measures as necessary to reduce or
prevent pollutants in industrial storm water discharges to meet the Receiving Water Limitations.



The sum of the allowable contributions of a single pollutant to a water body from all anthropogenic
sources plus the contribution from background sources is which of the following? - CORRECT
ANSWER TMDL (Total Maximum Daily Load)

Documentinformatie

Geüpload op
17 april 2026
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€10,18

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Verkocht
66
Volgers
2
Items
9425
Laatst verkocht
2 dagen geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen