CMGT EXAM FINAL QUESTIONS COMPLETE WITH CORRECT ANSWERS .Project Management - ANSWERS-A discipline has come about to respond to client needs for the construction of more complex projects, to be built faster and more cost effectively. .Associated Schools of Construction (ASC) - ANSWERS-1965 nine universities met in Florida and formed this to promote construction management as a legitimate and unique area of study at universities. .Steel - ANSWERS-In the 1800's this was introduced to allow for high- rise buildings. .Objective of Project Management - ANSWERS-May be said to be the achievement of predetermined specifics within given targets of time, quality, cost and scope. But, the measured of success of the project is the maintenance of relationships and perceived satisfaction of all the stakeholders after significant trade offs being made during the life cycle to maintain scope, quality, time and budget. .Heavy Civil - ANSWERS-10% Roadways, Bridges, Tunnels, Dams, Airports, and Railways Mostly publicly funded. Horizontal Construction .Industrial - ANSWERS-Steel mills, Processing plans, Manufacturing plants, Pipe lines, Electrical generating facilities, Oil refineries, Chemical processing plants. Mostly publicly funded. Least affected by economic fluctuations. Quality and time most important. .Funding Sources - ANSWERS-36% Public 64% Private Public Building: 10% Public Non-building: 12% Private Building: 71% Private Non-building: 7% .Specialization - ANSWERS-Range of specialties helps insulate agains economic down turns. Framing, Mechanical, Demolition, Roofing, Electrical, Public works and Roads are major categories. .Joint Venture/ Pooling Expertise - ANSWERS-As projects grow in size and complexity and contracts become schedule- oriented in order to mitigate costs, on- time completion becomes essential, firms pool expertise and financial resources for project bidding. .Construction Management, Design- Build - ANSWERS-The technological sophistication of many projects and increased popularity of design-build contracts encourage the integration of construction managers, architects, engineers and construction companies. .Repeat Business - ANSWERS-Bypassing bidding altogether and going with established relationships over low cost. .Ethics - ANSWERS-American Institute of Contractors Code of Ethics. Bid Shopping. Being able to trust people we work with is a big part of putting our best effort into our work. Key success is creating a trusting environment in which people feel comfortable with each other. .Iron Triangle - ANSWERS-These Construction Variables are Linked: Schedule, Cost, and Quality Change in one will affect the others: Projects done faster require more financial resources and quality may be compromised. High technical performance... increased time and money to complete. .Architect - ANSWERS-Lead Designer. Creates Concept Drawings.

Voorbeeld van de inhoud

CMGT EXAM FINAL QUESTIONS COMPLETE WITH
CORRECT ANSWERS



\.Project Management - ANSWERS✔-A discipline has come about to respond to
client needs for the construction of more complex projects, to be built faster and
more cost effectively.



\.Associated Schools of Construction (ASC) - ANSWERS✔-1965 nine universities
met in Florida and formed this to promote construction management as a
legitimate and unique area of study at universities.



\.Steel - ANSWERS✔-In the 1800's this was introduced to allow for high- rise
buildings.



\.Objective of Project Management - ANSWERS✔-May be said to be the
achievement of predetermined specifics within given targets of time, quality, cost
and scope. But, the measured of success of the project is the maintenance of
relationships and perceived satisfaction of all the stakeholders after significant
trade offs being made during the life cycle to maintain scope, quality, time and
budget.



\.Heavy Civil - ANSWERS✔-10%

Roadways, Bridges, Tunnels, Dams, Airports, and Railways
Mostly publicly funded.

,Horizontal Construction



\.Industrial - ANSWERS✔-Steel mills, Processing plans, Manufacturing plants, Pipe
lines, Electrical generating facilities, Oil refineries, Chemical processing plants.
Mostly publicly funded.
Least affected by economic fluctuations.
Quality and time most important.



\.Funding Sources - ANSWERS✔-36% Public

64% Private


Public Building: 10%
Public Non-building: 12%
Private Building: 71%
Private Non-building: 7%



\.Specialization - ANSWERS✔-Range of specialties helps insulate agains economic
down turns. Framing, Mechanical, Demolition, Roofing, Electrical, Public works
and Roads are major categories.



\.Joint Venture/ Pooling Expertise - ANSWERS✔-As projects grow in size and
complexity and contracts become schedule- oriented in order to mitigate costs,
on- time completion becomes essential, firms pool expertise and financial
resources for project bidding.

, \.Construction Management, Design- Build - ANSWERS✔-The technological
sophistication of many projects and increased popularity of design-build contracts
encourage the integration of construction managers, architects, engineers and
construction companies.



\.Repeat Business - ANSWERS✔-Bypassing bidding altogether and going with
established relationships over low cost.



\.Ethics - ANSWERS✔-American Institute of Contractors Code of Ethics.

Bid Shopping.
Being able to trust people we work with is a big part of putting our best effort into
our work.
Key success is creating a trusting environment in which people feel comfortable
with each other.



\.Iron Triangle - ANSWERS✔-These Construction Variables are Linked:

Schedule, Cost, and Quality


Change in one will affect the others:
Projects done faster require more financial resources and quality may be
compromised.
High technical performance... increased time and money to complete.



\.Architect - ANSWERS✔-Lead Designer.

Creates Concept Drawings.

Documentinformatie

Geüpload op
8 april 2026
Aantal pagina's
27
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€13,29

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
IszackBd
5,0
(3)
Verkocht
49
Volgers
3
Items
6110
Laatst verkocht
2 weken geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen