● ACWP. Answer: Actual Cost of Work Performed
● BAC. Answer: Budget at Completion
● BCWP. Answer: Budgeted Cost of Work Performed
● BCWS. Answer: Budgeted Cost of Work Scheduled
● APC. Answer: Angled Physical Contact
● ASP. Answer: Authorized Service Provider
● BAS. Answer: Building Automation System
● BDA. Answer: Bidirectional Amplifier
● BMS. Answer: Building Management System
● CAFM. Answer: Computer Aided Facility Management
, ● CD. Answer: Construction Documents
● CEV. Answer: Controlled Environment Vault
● CM. Answer: Construction Manager
● CMAR. Answer: Construction Manager at Risk
● CO. Answer: Change Order
● CPI. Answer: Cost Performance Index
● CPM. Answer: Critical Path Method
● CV. Answer: Cost Variance
● DB. Answer: Design-Build
● DBB. Answer: Design-Bid-Build
● DBOM. Answer: Design-Build-Operate-Maintain