Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 36 pagina's
Tentamen (uitwerkingen)

VA DEQ ESC Inspector Exam Questions & Answers | Latest Version Already Graded A+ Update 2025|2026.

Document preview thumbnail
Voorbeeld 4 van de 36 pagina's

VA DEQ ESC Inspector Exam Questions & Answers | Latest Version Already Graded A+ Update 2025|2026.

Voorbeeld van de inhoud

VA DEQ ESC Inspector Exam Questions &
Answers | Latest Version Already Graded A+
Update 2025|2026.


VESCP - ANSWER: Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - ANSWER: Stabilization


permanent or temporary soil stabilization shall be applied to denuded
areas within seven days after final grade is reached on any portion of
the site; temporary soil stabilization shall be applied within seven days
to denuded areas that may not be at final grade but will remain dormant
for longer than 14 days; permanent stabilization shall be applied to
areas that are to be left dormant for more than one year


Site NOT at Final Grade - ANSWER: - stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - ANSWER: - stabilize in 7 days (recommended
immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw

1|Page

,Minimum Standard 2 - ANSWER: Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be
stabilized or protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact
and silt fence intercepts and detains from disturbed areas


Minimum Standard 3 - ANSWER: Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not
otherwise permanently stabilized (permanent vegetation shall not be
considered established until a ground cover is achieved that is uniform,
mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of
bonds or surety


Minimum Standard 4 - ANSWER: First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and
other measures intended to trap sediment shall be constructed as a
first step in any land-disturbing activity and shall be made functional
before upslope land disturbance takes place




2|Page

,a certain amount of initial land disturbance may be required to provide
access for equipment to install the perimeter controls, but site clearing
and grading should be kept to a minimum until the perimeter controls
are in place


intercepts and detains small amounts of sediment from disturbed areas
during construction operation to prevent sediment from leaving the site
and decrease velocity of sheet flows and low-to-moderate level
channel flow


Perimeter Controls - ANSWER: assures that sediment does not leave
the perimeter of the land-disturbing area once site clearing, grading,
and construction commences


Examples: silt fences, sediment traps, sediment basins, construction
entrance, temporary diversions, diversions


Minimum Standard 5 - ANSWER: Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as
dams, dikes, and diversions immediately after installation


reduce erosion and sedimentation and reduce damage from sediment
and runoff to downstream or off-site areas


Minimum Standard 6 - ANSWER: Traps and Basins


sediment traps and basins shall be designed and constructed based
upon the total drainage area (not just disturbed area) to be served by
the trap or basin


3|Page

, Sediment Traps - ANSWER: minimum storage capacity shall be 134
cubic yards per acre of drainage area and shall only control drainage
areas less than 3 acres


*stone outlet = trap*


Sediment Basins - ANSWER: surface runoff from disturbed areas that
is comprised of flow from drainage areas greater than or equal to 3
acres shall be controlled by a basin; minimum storage capacity of a
sediment basin shall be 134 cubic yards per acre of drainage area; the
outfall system shall, at a minimum, maintain the structural integrity of
the basin during a 25-year storm of 24-hour duration; runoff
coefficients used in runoff calculations shall correspond to a bare earth
condition or those conditions expected to exist while the sediment basin
is utilized.


Sediment Trapping Devises - ANSWER: 1. place near the lowest
drainage points of a project


2. install as a first-step measure [MS-4]


3. stabilize immediately [MS-5]


4. must include outlet protection for basins [MS-11]


Minimum Standard 7 - ANSWER: Cut and Fill Slopes


roughening the surface of the slope decreases runoff, lowers the
velocity runoff, increases water retention, and leads to better seed
germination


4|Page

Documentinformatie

Geüpload op
4 maart 2026
Aantal pagina's
36
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€25,27

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Verkocht
55
Volgers
3
Items
4585
Laatst verkocht
2 dagen geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen