Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 66 pagina's
Tentamen (uitwerkingen)

CPIM PRACTICE EXAM 1+2 QUESTIONS AND ANSWERS GRADED A+ 2025/2026

Document preview thumbnail
Voorbeeld 4 van de 66 pagina's

CPIM PRACTICE EXAM 1+2 QUESTIONS AND ANSWERS GRADED A+ 2025/2026

Voorbeeld van de inhoud

CPIM PRACTICE EXAM 1+2 QUESTIONS
AND ANSWERS GRADED A+ 2025/2026




Mixed-model scheduling is most appropriately used to accomplish which of the following?



A. Build inventory in advance of peak demand.

B. Increase daily production efficiency.

C. Produce the products expected to be sold that day.

D. Reduce cumulative lead time - ANS C. Produce the products expected to be sold that day.



Which of the following manufacturing processes would most likely be characterized by a narrow
range of standard products, low direct labor costs, and a high level of technical support for
manufacturing?



A. Job shop

B. Line

C. Batch

D. Project - ANS B. Line



The number of exposures to stockouts can best be decreased if which of the following factors is
increased?



1 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

,A. Order quantity of replenishment orders

B. Customer service level percentage

C. Cost of placing purchase orders

D. Cost of stockouts - ANS A. Order quantity of replenishment orders



A company has a lean relationship with a supplier. Which of the following should be shared with
the supplier for procurement planning over the horizon?



A. Purchase order

B. Kanban

C. Contract

D. Schedule - ANS D. Schedule



Which of the following factors has the greatest impact on reducing transportation inventory?



A. Fuel surcharges

B. Transit time

C. Safety stock

D. Shipment size - ANS B. Transit time



A process that is monitored using control charts has been in control but now has a mean that is
trending out of control. What is the most likely reason for this?



A. Tooling that has begun to wear

B. Operator who needs a refresher

C. Different way of measuring


2 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

,D. Machine error - ANS A. Tooling that has begun to wear



When investing in large, high-throughput equipment, the planned tradeoff is typically between
reduced per-unit costs and the potential of:



A. competitive mimicking.

B. underutilized capacity.

C. increasing per-unit costs.

D. capacity technology obsolescence. - ANS B. underutilized capacity.



Which of the following factors must be known in order to compute economic order quantity
(EOQ)?



A. Forecast variation

B. Safety stock

C. Setup cost

D. Lead time - ANS C. Setup cost



Which of the following would typically be considered a strategic use of the conclusions from a
SWOT analysis?



A. Developing promotional material to emphasize the strengths

B. Sharing the four lists with all employees

C. Using the threats as a tool to motivate employees

D. Using strengths to limit the impact of external threats - ANS D. Using strengths to limit the
impact of external threats



3 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

, Can master scheduling be done in a make-to-order (MTO) environment? , master scheduling
should take place at which of the following levels?



A. Yes, but it would occur at the raw material level.

B. No, demand orders cannot be issued until actual orders appear.

C. No, only final assembly scheduling is needed.

D. Yes, but only at the product family level. - ANS A. Yes, but it would occur at the raw
material level.



Which of the following validations is most likely to be performed for measuring master
scheduling performance as it relates to sales and operations planning in a make-to-stock
company?



A. The bottleneck work center has a safety capacity to absorb unplanned demand.

B. The inventory plan supports the finished goods portion of the business plan.

C. The master schedule equals the production plan quantity.

D. Available-to-promise shows inventory for promising customer orders. - ANS C. The master
schedule equals the production plan quantity.



When is processor-dominated scheduling most often and most effectively used?



A. Order due dates are inflexible.

B. Material is relatively expensive.

C. Capacity is flexible.

D. Capacity is relatively expensive. - ANS D. Capacity is relatively expensive.




4 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

Documentinformatie

Geüpload op
17 februari 2026
Aantal pagina's
66
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€13,28

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brightstars
3,3
(40)
Verkocht
266
Volgers
7
Items
14493
Laatst verkocht
4 dagen geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen