Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 3 van de 25 pagina's
Tentamen (uitwerkingen)

ARE 5.0 Project Management Questions with Correct Answers | Updated (100% Correct Answers)

Document preview thumbnail
Voorbeeld 3 van de 25 pagina's

ARE 5.0 Project Management Questions with Correct Answers | Updated (100% Correct Answers)

Voorbeeld van de inhoud

1


ARE 5.0 Project Management Questions with
Correct Answers | Updated (100% Correct
Answers)
Project Management Answer: Includes project planning, scheduling,
monitoring, coordinating and directing, updating documentation,
closing out the job, and following up with clients.

Partnering Answer: Various stakeholders in a project (such as the
architect, owner, contractor and vendors) all participate in the
decision-making process.

Bar Chart Answer: Method commonly used for scheduling design
and construction projects. Tasks are listed in chronological order on
vertical access and time period is listed on horizontal axis. (Aka
Gantt Chart)

Dependency Answer: The relationship between a task that must be
completed before another can start.

Critical Path Method (CPM) Answer: Common scheduling tool that
graphically depicts all the tasks needed to complete a project, the
sequence in which tasks must occur, and each task's duration.

Float Answer: The maximum length of time a noncritical task can be
delayed or extended before it causes a delay.


© 2025 All rights reserved

,2
Work Plan Answer: A detailed project schedule, breaking the project
down into its component tasks and assigning staff members and
other resources to each task. (Aka Fee projection)

Pro Forma Answer: Statement listing the expected income that the
project will generate and the expected costs to build the project.

Value Engineering Answer: Reviewing individual systems and
materials to see if the same function can be accomplished in a less
expensive way.

Building Cost Answer: The money needed to construct the building,
including structure, exterior cladding, finishes, and electrical and
mechanical systems, as well as the contractor's overhead and profit.

Site Development Costs Answer: Cost of parking, drives, fences,
landscaping, exterior lighting, and irrigation systems.

Furniture, Fixtures, and Equipment (FF&E) Answer: Costs of movable
equipment, furnishings, accessories, and window coverings.

Professional Services Answer: Architectural and engineering fees as
well as costs for services such as topographic surveys, soil tests,
special consultants, appraisals, and legal consultation.

Financing Answer: Includes the long-term interest paid on
permanent financing as well as the immediate costs of loan


© 2025 All rights reserved

, 3
origination fees, construction loan interest, and other administrative
costs.

Debt Service Answer: The cost to pay off the construction loan for a
project and is generally considered an ongoing cost over many
years, not part of the original cost of the project.

Top-Down Approach Answer: An approach for estimating fees
where the PM begins by estimating the total fee needed to
complete the project using a combination of rules of thumb and
historical data.

Bottom-Up Approach Answer: An approach for estimating fees
where the PM begins by breaking the project down into individual
tasks and estimating how much time will be needed to complete
each one.

Total Working Fee Answer: The fee available to pay people to do
the job after subtracting fees for proffit, consultants and other
expenses.

Project Monitoring Chart Answer: Used to monitor employees' time
sheets weekly in order to compare the actual hours expended to the
budgeted time and take corrective action if the actual time exceeds
the budgeted time.




© 2025 All rights reserved

Documentinformatie

Geüpload op
16 januari 2026
Aantal pagina's
25
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€12,39

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Passit
3,5
(23)
Verkocht
128
Volgers
6
Items
14482
Laatst verkocht
2 weken geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen