CONTRACTORS LICENSE LAW TEST PAPER
2026 FULL SOLUTION SET

◉ Do sales tax costs need to be included in the bid estimate?
Answer: Yes


◉ If the subs bid is too low, should you let him know? Answer: Yes, it
is ethical and good practice to call the sub and inform him when the
bid is too high or low.


◉ Should you build against code if the customer insists? Answer: No.
It is illegal to build against code.


◉ Should you bid against other companies or against the job?
Answer: Always bid against the job. Doing otherwise will cause you
troubles in paying subs, materials, and equipment needed.


◉ Should you take your time and double check everything before
leaving a quote or just get it done quickly? Answer: Take your time
and be critical, ensure you understand all aspects of the plan, walk
the job and double check the bid estimate.


◉ An agreement with specific terms between two or more people
for performance and compensation. Answer: Contract

,◉ A contract is not enforceable unless it has ___ signatures? Answer:
2. The customer and the contractor.


◉ What is the standard contract used by customers and contractors?
Answer: Home Improvement Contract. It establishes and agreement
between the customer and the contractor for the work being done.


◉ What is the required down payment for a contract? Answer: 10%
or $1000. Whichever is less.


◉ Time given to the customer to cancel the contract? Answer:
midnight of the 3rd business day.


◉ Time given to the contractor to return all money given by the
customer back to him/her. Answer: 10 days, beginning on the day he
or she cancels the contract.


◉ days given to the customer to make all materials left on the
property available for pick up. Answer: 20 days


◉ The contractor has this many days from the declared start date, to
start the job before breaching the contract. Answer: 20 days

, ◉ Contracts should always be in writing, but they must be in writing
if the job costs more than ___. Answer: $500


◉ A lien placed upon the property that received construction. It is
filed by the contractor and is used if the contractor does not receive
payment for their work and properly filed a Preliminary Notice.
Answer: Mechanic's Lien


◉ How is a Stop Payment Notice similar to a Mechanic's Lien?
Answer: the lien is placed on the funds and not the property. It is still
used to get payment for work the contractor did.


◉ Can you record a Mechanic's Lien and a Stop Payment Notice on
private work? Answer: Yes


◉ Can you record a Mechanic's Lien and a Stop Payment on public
work? Answer: No. A Mechanic's Lien is limited to private work.


◉ What must be filed to keep the right to a Mechanic's Lien? How
many days do you have to file it? Answer: A Preliminary Notice Form
must be filed within 20 days of signing the contract. Subcontractors,
suppliers and anyone else who is going to participate in the job must
also file a Preliminary Notice if they want to keep their right.

Documentinformatie

Geüpload op
10 januari 2026
Aantal pagina's
19
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€12,41

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GradeGalaxy
4,3
(12)
Verkocht
158
Volgers
4
Items
52559
Laatst verkocht
9 uur geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen