Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 50 pagina's
Tentamen (uitwerkingen)

SAP Certification Questions with Answers (100% Correct Answers)

Document preview thumbnail
Voorbeeld 4 van de 50 pagina's

SAP Certification Questions with Answers (100% Correct Answers)

Voorbeeld van de inhoud

1




SAP Certification Questions with Answers (100%
Correct Answers)

What is the effect of setting the Freeze Book Inventory indicator in a
physical inventory document header?

a. the system blocks all inventory management units of the physical
inventory document for procurement

b. the system blocks all inventory management units of the physical
inventory doc for goods movement

c. the book inventory is determined and fixed in the physical inventory

document at the beginning of the count

d. the inventory is determined and fixed in the physical inventory doc at

the time of the difference posting Answer: c. the book inventory is
determined and fixed in the physical inventory document at the
beginning of the count

Supplier A should automatically be proposed as primary source for a
specific material. What options do you have?



© 2025 All rights reserved

,2


a. Use the Regular Supplier indicator in the info record.

b. Use the source list and mark the vendor as fixed.

c. Set the Regular Supplier indicator in the business partner master
record.

d. Use the Regular Supplier indicator in the material master record.
Answer: a. Use the Regular Supplier indicator in the info record.

b. Use the source list and mark the vendor as fixed.

What controls which item categories you are allowed to use when

creating new items in a purchasing document?

a. document category

b. user role

c. document type

d. account assignment category Answer: c. document type

You would like to create purchasing info records for consumable
materials without material master records. How must you proceed?



© 2025 All rights reserved

,3


a. you must first create material master records

b. you specify a special info category

c. you specify the relationship between a material type and a supplier

d. you specify the relationship between a material group and a supplier
Answer: d. you specify the relationship between a material group and a
supplier

Which lot-sizing procedures are suitable for reorder point planning?

a. daily lot size

b. fixed order quantity

c. monthly lot size

d. lot for lot order quantity

e. replenish to maximum stock level Answer: b. fixed order quantity

d. lot for lot order quantity

e. replenish to maximum stock level




© 2025 All rights reserved

, 4


Your company uses the classic release procedure for purchasing
documents. For which configuration object must approvers have the
appropriate authorization?

a. release group

b. release strategy

c. release indicator

d. release code Answer: d. release code

You want to automatically create a scheduling agreement delivery

schedule. How can this be accomplished?

a. by running the program to generate scheduling agreement releases

b. with the release creation profie.

c. through MRP

d. in the background when creating a scheduling agreement Answer: c.
through MRP

which options are available for the automatic posting of unplanned
delivery costs when creating an invoice with purchase order reference?

© 2025 All rights reserved

Documentinformatie

Geüpload op
8 januari 2026
Aantal pagina's
50
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€14,17

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Passit
3,5
(23)
Verkocht
128
Volgers
6
Items
14482
Laatst verkocht
2 weken geleden

Echte notities, van echte studenten
Elk document op Stuvia is geschreven door een medestudent die hetzelfde vak deed. Zo leer je van iemand die het al heeft gehaald.



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen