100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Samenvatting

Samenvatting - Projectmanagement (2113MDOGCP)

Beoordeling
-
Verkocht
-
Pagina's
33
Geüpload op
26-05-2023
Geschreven in
2022/2023

ENGELS Samenvatting aan de hand van de belangrijkste begrippen per les. H1 t/m 8 + 10, 11












Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
26 mei 2023
Aantal pagina's
33
Geschreven in
2022/2023
Type
Samenvatting

Voorbeeld van de inhoud

Inhoudsopgave
Lecture 1: Complex projects........................................................................................................................................................................................................... 2
Lecture 2: Project management, the bigger picture........................................................................................................................................................................ 5
Lecture 3: Initiating projects............................................................................................................................................................................................................ 7
Lecture 4: Defining projects............................................................................................................................................................................................................ 9
Lecture 5: Planning and preparing projects.................................................................................................................................................................................. 13
Lecture 6: Implementation & aftercare.......................................................................................................................................................................................... 15
Lecture 7: Managing time............................................................................................................................................................................................................. 16
Lecture 8: Project finance & budget management – process & project management................................................................................................................... 19
Lecture 10: Managing uncertainty & risk...................................................................................................................................................................................... 24
Lecture 11: Managing quality........................................................................................................................................................................................................ 30

,Lecture 1: Complex projects
Project Actionable parts of plans ( structureplans, spatial policy)
3 requirements:
 Timing
 Place (bv project zone, project study area)
 Budget
Strategic projects Projects embedded in strategic plans
Spatial Development Infrastructure projects
Projects (SDP’s)
Type of actors within SDP’s  Public projects (bv. Scheldekaaien)
 Private projects
 Public – private projects
Differentiation between main actors that run the project.
Type of goals SDP’s Single goal or multiple goal
Type of field for SDP’s  Greenfield
o Producing not developed land
 Brownfield
o Producing on developed land (sanitizing before building, more consistent projects)
o More shifting to these types of projects because greenfield is limited.
Type of landscape SDP’s  Urban: landscape projects
 Rural: non-urban projects
Type of SDP’s  Strategic
o Once in a lifetime project
o No routines in place to manage kind of projects
 Operational
o Series of projects that always have the same processes
o With a team that’s always working on those projects.
Management
characteristics of
SDP’s
Complex systems theory  Systems with many components
 Systems with high distinction (= onderscheid) between components
 Mutual dependent  things can go easily wrong. Bv. Parkeerplaats te klein / te groot
dat een effect kan hebben op leven, winkelen, milieu.
Different types of complexity  Technological complexity
o Design & Engineering
o Unicity (= zeldzaam) & nieuwigheid (novelty) v technology  (= overall anders, de
techn. Op de ene locatie is niet hetzeflde als op de andere)

, o Functional interdependencies  (sommige markten kunnen achterlopen met techn.)
o Uncertainty regarding the impact
o Technological dynamics during the project
 Societal complexity
o Many actors involved with different goals  differential impact thus winners &
losers, so projects result in societal struggle
o Bv de ring: port area more infrastructure to use, but less space to live.
o Large societal impact
 Political complexity
o Multi-level governance (te maken met verschillende lagen met een groot project ivm
budget)
o Effect of elections and political volatility (onzekerheid)
o Political strategic behaviour: political actors block each other
o Political logic is different from technological logic: political horse-trading in projects.
 Organizational complexity
o Organizational complexity  public, private, civil society
o Mutual dependency (resource dependency)
o Obliged to cooperate
 Juridical-administrative complexity
o Lot of procedures, environmental legislation, contracts
Megaprojects A separate specie of SDP’s
 Cost > 1 billion
 Many years to build
 Involve multiple stakeholders
 Impact millions of people
Performance of megaprojects shows: Systematic
 Cost overrun
o Cost escalation
 Time slippage
 Non-implementation
 Underperformance or underuse
 Decreasing ambition levels over time.
Theoretical causes of failures  The sublime of megaprojects (= drivers from megaproject initiation)
o 4 sublimes:
 Technological: possibilities in longest-highest-fastest projects
 Political: happy to have monuments and being visible in media & public.
 Economic: happy to get money & jobs from megaprojects.

,  Aesthetic: happiness from design lovers when buildings are beautiful/stylish.
 Optimism bias and deception (= drivers for mega project commitment)
o Pattern of errors is always skewed to the right (cost overrun)
o Their errors are intentional due cost underestimation
o Project promotors are too optimistic about costs & benefits (optimism bias)
 Accountability & Risk
o Ignoring uncertainties by different groups who are involved in decision making of a
megaproject because of no responsibility when things go wrong (accountability =
responsibility)
o Types of risk in megaprojects:
 Cost risk
 Demand risk
 Financial market risk (future interest rates)
 Political risk (regulation, parallel public investment)
o Studies are biased because of no accountability by actors in the decision-making
process.
o Traditional approaches to project management & better approaches
 Sunk costs and the escalation of commitment (= drivers for megaproject escalation)
o Escalation of commitment = tendency to keep investing in “bad” investments (fi old
car, waiting in line)
o Because of:
 Psychological mechanism
 Social drivers
 Project & economic drivers


 Transfer of risk and impacts to outside parties
 Fail
Questions: 1. What are SDP’s 1. Infrastructure projects
2. What are the different forms of 2. Technological, societal, political, organizational, juridical-adminstrative
complexity in Spatial development 3. ?Uncertainties & risks?
projects? 4. drivers from megaproject initiation: 4 types: technological, politic, economic, aesthetic.
3. What are the typical fail factors in Spatial 5. (4) sublimes, optimism bias and deception, accountability & risk, sunk costs and the
development projects? escalation of commitment
4. What is the megaproject sublime?
5. What are causes of megaproject failure?

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Mstudent123 Universiteit Antwerpen
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
16
Lid sinds
7 jaar
Aantal volgers
13
Documenten
0
Laatst verkocht
8 maanden geleden

4,2

6 beoordelingen

5
4
4
0
3
1
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen