NM ES-3 Test (New Mexico Low Voltage Journeyman) Complete Study Guide This comprehensive study guide is designed to help you prepare for the New Mexico ES-3

Document preview thumbnail
Voorbeeld 4 van de 41 pagina's

NM ES-3 Test (New Mexico Low Voltage Journeyman) Complete Study Guide This comprehensive study guide is designed to help you prepare for the New Mexico ES-3

Voorbeeld van de inhoud

NM ES-3 Test (New Mexico Low
Voltage Journeyman) Complete Study
Guide


This comprehensive study guide is designed to help you prepare for
the New Mexico ES-3 Low Voltage Journeyman licensing examination.
The exam is administered by PSI and consists of 50 open-book
questions to be completed in 145 minutes, requiring a passing score
of 75%.

License Scope: The ES-3 license permits work on interior and exterior
special systems operating at 50 volts or less, including
telecommunications, fire alarm, CATV, audio/visual, security systems,
and access control.




SECTION 1: WIRING & INSTALLATION
REQUIREMENTS
Question 1​
What is the minimum clearance to the edge of a wood stud for a wire
hole?

A) 1/2 inch​
B) 3/4 inch​
C) 1 inch​
D) 1 1/4 inches

,Answer: D

Rationale: The minimum clearance to the edge of a wood stud for a
wire hole is 1 1/4 inches. This requirement ensures that nails or
screws driven into the stud will not contact and damage the wiring.



Question 2​
Electrical conduit buried 18 inches below grade shall have a warning
tape at how many inches above the conduit?

A) 6 inches​
B) 8 inches​
C) 10 inches​
D) 12 inches

Answer: D

Rationale: Warning tape must be placed 12 inches above buried
conduit that is installed 18 inches below grade. The tape provides a
visual alert for future excavation work.



Question 3​
A phase converter is an electrical device that ______?

A) Converts AC to DC power​
B) Converts single-phase power to three-phase power​
C) Steps voltage up or down​
D) Regulates current flow

Answer: B

,Rationale: A phase converter is an electrical device that converts
single-phase electrical power to three-phase electrical power. This is
commonly used when three-phase equipment must operate on
single-phase power sources.



Question 4​
A rotary phase converter has a nameplate rating of 28 full load input
amps. What is the minimum ampacity required for the conductor
supplying the phase converter?

A) 28 amps​
B) 30 amps​
C) 35 amps​
D) 40 amps

Answer: C

Rationale: The minimum ampacity required is 35 amps. The conductor
must be sized at 125% of the full load input amp rating (28 × 1.25 =
35).



Question 5​
According to the NEC, electrical equipment may NOT be mounted to
concrete, cinder block, or brick walls with which of the following?

A) Expansion anchors​
B) Wooden plugs​
C) Toggle bolts​
D) Masonry screws

Answer: B

, Rationale: Wooden plugs are prohibited for mounting electrical
equipment to concrete, cinder block, or brick walls. Wooden plugs can
rot, shrink, or become loose over time, compromising the security of
the installation.



Question 6​
If a cable is being installed in an area that is above a suspended
ceiling that contains completely enclosed air ducts, what term
identifies this location?

A) Plenum​
B) Accessible​
C) Concealed​
D) Exposed

Answer: B

Rationale: This location is defined as "accessible," meaning it can be
approached or entered for maintenance without damaging the
building structure. The presence of enclosed air ducts above the
ceiling does not make the space a plenum.



Question 7​
What percentage of fill is allowed in a conduit with three conductors?

A) 30%​
B) 35%​
C) 40%​
D) 50%

Answer: C

Documentinformatie

Geüpload op
15 augustus 2026
Aantal pagina's
41
Geschreven in
2026/2027
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
€25,32

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
martinezmartinez
4,9
(260)
Verkocht
104
Volgers
44
Items
4695
Laatst verkocht
1 dag geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen