IFMA PROJECT MANAGEMENT FINAL EXAM QUESTIONS AND 100% VERIFIED CORRECT ANSWERS!!

Document preview thumbnail
Aperçu 2 sur 12 pages

IFMA PROJECT MANAGEMENT FINAL EXAM QUESTIONS AND 100% VERIFIED CORRECT ANSWERS!!

Aperçu du contenu

IFMA PROJECT MANAGEMENT FINAL
EXAM QUESTIONS AND 100% VERIFIED
CORRECT ANSWERS!!!
Which is an attribute of a project?

Projects are finite.

Which work activities should be treated as a project?

Relocating whole departments within the same building.

Which is true of facility management (FM) organization projects?

Projects can be initiated to address the results of programming.

Which is an example of the application of sound management techniques by a project
manager?

they break down a task further if it remains at the same percent completion despite reported
progress.

What does a project manager need to be successful?

Ability to hire, discipline, and terminate project team members

Which is an advantage to using a standardized project management model?

The model is a framework that project managers can adapt to project specifics.

In the project model, what do outputs from the Plan phase become?

inputs to the Do phase.

Which PMBOK Process Groups involves establishing the scope of the project and defining
the course of action?

Planning

An FM organization's policy specifies use of a predefined project management process.
What is a typical feature of such a process?

, It lists specific persons from whom to seek approvals.

A project has a long payback period. To what should the project be linked to increase the
chances the project will be approved?

Strategic facility plans

What should a facility management contractor get from its customer to initiate a project?

Scope/statement of work

Which is set by policy at the start of a project?

Estimating

What constraint addresses sensitivity to organizational politics and influences how projects
are identified and prioritized?

Organizational culture

Which source provides information about the facility and its components as they exist prior
to a new project?

Archived project data

What should project managers do at the start of a project to increase the chance of
success?

assure there is a shared understanding of the end purpose of a project.

Which is true of the steps involved in defining project success?

Specifying nonessential parameters is as important as specifying essential ones.

When defining project success, after the business need is defined, what could be used in the
next step of the process?

Statement of requirements

Which documents includes details such as adjacency diagrams, space standards, and
information on current and future staffing count for business units?

Infos sur le Document

Publié le
29 juin 2025
Nombre de pages
12
Écrit en
2024/2025
Type
Examen
Contenu
Questions et réponses
11,45 €

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
QUINTER
3,6
(73)
Vendu
410
Abonnés
106
Éléments
39858
Dernière vente
3 jours de cela



Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Vous travaillez sur vos références ?

Créez des citations précises en APA, MLA et Harvard avec notre générateur de sources gratuit.

Vous travaillez sur vos références ?

Foire aux questions