EPA Model Lead Based Paint Risk Assessor Exam Questions And Answers Verified 100% Correct A certified Risk Assessor every two years if Lead Based Paint remains in the unit. - ANSWER HUD regulations requires a follow-up reevaluation to be performed by: The state or local regulatory agencies - ANSWER An Investigations of EBL units are often coordinated by: Summarizes the results by indicating where the hazards were found Include any raw data and identifying information In some jurisdiction may become a legal document - ANSWER The Risk Assessment Report: Dry scraping, sanding, abrasive, open flame - ANSWER HUD does not recommend what type of lead Paint removal: 30 ug/m3 (microgram per cubic centimeter) - ANSWER What is OSHA's action level: 1990 - ANSWER In what year was lead-based product discontinued: 50 ug/m3 (microgram per cubic centimeter) - ANSWER What is OSHA PEL level: 1978 - ANSWER In what year did the CPSC reduction occur Glazed Pottery Battery Sinker s Chemicals and Brass Faucet - ANSWER Name at least 3 products that contain lead: A identifiable part of a residence such as: - rooms, exterior, foyer, staircase, etc. - ANSWER What is a room equivalent: 250 ug/ft2 - ANSWER What is the standard clearance for window sill: 40 ug/ft2 - ANSWER What is the standard clearance for floor: 25 ug/ft2 - ANSWER What is the Lead Hazard Screen level for floor: 125 ug/ft2 - ANSWER What is the Lead Hazard Screen level for window sill: National Lead Laboratory Accredited Program (NLLAP) - ANSWER What does NLLAP stand for: Toxic Characteristics Leaching Program - ANSWER What does TCLP stand for: Sodium sulfide Sodium rhodizonate - ANSWER Name two types of qualitative means (kits) for detecting lead in paint. Aloe or lanolin - ANSWER What is not allow for wipes: True - ANSWER T or F A Risk Assessor should have the following supplies for dust wipe sampling: - disposable lead dust wipes. Wipes that do not contain aloe or lanolin; - disposable glove that are non-steriled and non powdered - disposable shoe covers b/t buildings; - centrifuge tubes or other hard plastic. Non-sterilized plaster tube equipped with a sealable lid.) - Reuable templates (12" x 12" plastic or disposable cardboard template is best). True - ANSWER T or F A Spike samples should be labeled so you can identify them, but the lab cannot True - ANSWER T or F If a blank sample is contaminated, then the data should not be used and the unit in question should be re-sampled. 2 (floor and window sill) - ANSWER How many dust composite samples must be taken in a Lead Screen. Atomic Absorption Spectramotery (AAS) - ANSWER How are paint chip tested Add it to the sample - ANSWER What do you do when taking a paint chip sample and part of the paint falls on plastic trained - ANSWER Can a risk assessor conduct a risk assessment with what personnel 1978 - ANSWER When did they reduce the Lead Levels in consumer produce 1990 - ANSWER In what year was lead discontinued in consumer products Yes, but according to the regulation it is not required. - ANSWER Do you need a respirator when using a heat gun dry condition - ANSWER In what condition should you collect bare soil composite a mother and fetus - ANSWER Who gets affected by exposure to lead Welder - ANSWER What has more lead dust someone doing what type of work. When condition of paint is deteriorated or a known lead hazard exist. - ANSWER When should you bypass a Lead Hazard Screen: The owner and the firm - ANSWER When completing a Lead Risk Assessment who gets to keep the final report. Blood and anemmia - ANSWER Low weight in a child affects what: Dark grey or black - ANSWER What color does the sodium sulfide field test kits turns when in contact with a surface that contains lead. Deteriorated paint Impact Friction Leaking roof - ANSWER Name some cause Lead Paint Hazards Dust - ANSWER What is the largest Lead Hazards in a Dwelling No. - ANSWER Would a wall be considered a friction surface Elemental analysis - ANSWER Atomic absorption spectrometry (AAS) is a method for: Abatement of soil - removal and replacement of contaminated soil - permanent barriers - ANSWER If a play area (bare soil) has a concentration of 5,000 ppm what should be done:

Aperçu du contenu

EPA Model Lead Based Paint Risk Assessor
Exam Questions And Answers Verified 100%
Correct

A certified Risk Assessor every two years if Lead Based Paint remains in the unit. -
ANSWER HUD regulations requires a follow-up reevaluation to be performed by:

The state or local regulatory agencies - ANSWER An Investigations of EBL units are
often coordinated by:

Summarizes the results by indicating where the hazards were found
Include any raw data and identifying information
In some jurisdiction may become a legal document - ANSWER The Risk Assessment
Report:

Dry scraping, sanding, abrasive, open flame - ANSWER HUD does not recommend
what type of lead Paint removal:

30 ug/m3 (microgram per cubic centimeter) - ANSWER What is OSHA's action level:

1990 - ANSWER In what year was lead-based product discontinued:

50 ug/m3 (microgram per cubic centimeter) - ANSWER What is OSHA PEL level:

1978 - ANSWER In what year did the CPSC reduction occur

Glazed
Pottery
Battery
Sinker
s
Chemicals and
Brass Faucet -
ANSWER
Name at least
3 products that
contain lead:

A identifiable part of a residence such as:

,- rooms, exterior, foyer, staircase, etc. - ANSWER What is a room equivalent:

250 ug/ft2 - ANSWER What is the standard clearance for window sill:

40 ug/ft2 - ANSWER What is the standard clearance for floor:

25 ug/ft2 - ANSWER What is the Lead Hazard Screen level for floor:

125 ug/ft2 - ANSWER What is the Lead Hazard Screen level for window sill:

National Lead Laboratory Accredited Program (NLLAP) - ANSWER What does NLLAP
stand for:

Toxic Characteristics Leaching Program - ANSWER What does TCLP stand for:

Sodium sulfide
Sodium rhodizonate - ANSWER Name two types of qualitative means (kits) for
detecting lead in paint.

Aloe or lanolin - ANSWER What is not allow for wipes:

True - ANSWER T or F A Risk Assessor should have the following supplies for dust
wipe sampling:
- disposable lead dust wipes. Wipes that do not contain aloe or lanolin;
- disposable glove that are non-steriled and non powdered
- disposable shoe covers b/t buildings;
- centrifuge tubes or other hard plastic. Non-sterilized plaster tube equipped with a
sealable lid.)
- Reuable templates (12" x 12" plastic or disposable cardboard template is best).

True - ANSWER T or F A Spike samples should be labeled so you can identify them,
but the lab cannot

True - ANSWER T or F If a blank sample is contaminated, then the data should not be
used and the unit in question should be re-sampled.

2 (floor and window sill) - ANSWER How many dust composite samples must be taken
in a Lead Screen.

Atomic Absorption Spectramotery (AAS) - ANSWER How are paint chip tested

Add it to the sample - ANSWER What do you do when taking a paint chip sample and
part of the paint falls on plastic

,trained - ANSWER Can a risk assessor conduct a risk assessment with what
personnel

1978 - ANSWER When did they reduce the Lead Levels in consumer produce

1990 - ANSWER In what year was lead discontinued in consumer products

Yes, but according to the regulation it is not required. - ANSWER Do you need a
respirator when using a heat gun

dry condition - ANSWER In what condition should you collect bare soil composite

a mother and fetus - ANSWER Who gets affected by exposure to lead

Welder - ANSWER What has more lead dust someone doing what type of work.

When condition of paint is deteriorated or a known lead hazard exist. - ANSWER When
should you bypass a Lead Hazard Screen:

The owner and the firm - ANSWER When completing a Lead Risk Assessment who
gets to keep the final report.

Blood and anemmia - ANSWER Low weight in a child affects what:

Dark grey or black - ANSWER What color does the sodium sulfide field test kits turns
when in contact with a surface that contains lead.

Deteriorated paint
Impact
Friction
Leaking roof - ANSWER Name some cause Lead Paint Hazards

Dust - ANSWER What is the largest Lead Hazards in a Dwelling

No. - ANSWER Would a wall be considered a friction surface

Elemental analysis - ANSWER Atomic absorption spectrometry (AAS) is a method for:

Abatement of soil
- removal and replacement of contaminated soil
- permanent barriers - ANSWER If a play area (bare soil) has a concentration of
>5,000 ppm what should be done:

, 2,000 ug/g - ANSWER What are the Old EPA standard level of concern for other
residential yard areas

Elevated blood level - ANSWER What does EBL stand for:

90% - ANSWER When __________% or more of the drinking water taps in a
community exceed this level, regulations require corrosion control treatment, source
water treatment, public education and lead service line replacement.

Roof, gutters, downspouts, windows, porches, masonry, fences and garages -
ANSWER What are some exterior components that a risk assessor should inspect?

50 ug - 1,000 ug - ANSWER What is the Range of Lead in Dust Spikes?

5,000 ug/g - ANSWER What are the Levels requiring Permanent Abatement for Bare
Soil

No, but If tenants cannot relocate, certain precautionary methods should be taken. -
ANSWER T/F: Is relocating of tenants while work is ongoing required.

AALA - American Association for Laboratory Accreditation

AIHA - American Industrial Hygiene Association - ANSWER NLLAP includes these 2
organizations:

- A Lead-based paint risk assessments
- A lead based paint inspections
- An abatement
- Interim controls in housing before children are lead poisoned. - ANSWER What are
the 4 Primary Prevention:

The principle play room, kitchen, bedroom of youngest child >6 months of age,
bedroom of next oldest child - ANSWER What are the 4 minimum rooms that should
be sampled for Composite Dust samples:

A full risk assessment be performed. The more samples of deteriorated paint you take,
the more likely one will fail. Save costs by skipping to a full risk assessment or paint
inspection. - ANSWER Scenario: Owner describes home as relatively good condition,
so you decide that the home is a good candidate for a lead hazard screen. However,
you find there are >5 areas with poor paint. What do you recommend?

Pro

Infos sur le Document

Publié le
9 juin 2025
Nombre de pages
31
Écrit en
2024/2025
Type
Examen
Contenu
Questions et réponses
12,43 €

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
TopGradeGuru
1,5
(2)
Vendu
17
Abonnés
0
Éléments
2362
Dernière vente
3 jours de cela



Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Vous travaillez sur vos références ?

Créez des citations précises en APA, MLA et Harvard avec notre générateur de sources gratuit.

Vous travaillez sur vos références ?

Foire aux questions