Rédigé par des étudiants ayant réussi Disponible immédiatement après paiement Lire en ligne ou en PDF Mauvais document ? Échangez-le gratuitement 4,6 TrustPilot
logo-home
Document preview thumbnail
Aperçu 2 sur 6 pages
Examen

PMT 0170 Risk Management Exam Questions With Complete Solutions.

Document preview thumbnail
Aperçu 2 sur 6 pages

PMT 0170 Risk Management Exam Questions With Complete Solutions.

Aperçu du contenu

PMT 0170 Risk Management Exam Questions
With Complete Solutions


Why are Monte Carlo simulations used in program schedule analysis? 10.2 -
| | | | | | | | | | | |


CORRECT ANSWER✔✔-To find the cumulative effect of multiple risks on total
| | | | | | | | | | |


project schedule duration or total project cost
| | | | | |




A shortage of steel has caused a delay in one of the tasks until the material is
| | | | | | | | | | | | | | | | |


available. The original plan estimated the material to be available in 6 weeks, but
| | | | | | | | | | | | | |


the shortage continues. What would be an appropriate step in tracking and
| | | | | | | | | | | |


managing this issue? 15.3 - CORRECT ANSWER✔✔-Adjust the corrective action
| | | | | | | | | |


plan and issue level as warranted.
| | | | |




Since risks should be closely tied to individual tasks and deliverables, which of the
| | | | | | | | | | | | |


following should be used as a cross-reference to each risk? 31.1 - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-Work Breakdown Structure (WBS) number | | | |




The following describes which type of category of risk: Two legacy software
| | | | | | | | | | | |


systems must be combined into one system in order to operate a new piece of
| | | | | | | | | | | | | | |


hardware. Programmers must find a way to ensure that old data records in each
| | | | | | | | | | | | | |


system are still editable. If not, the hardware will not operate correctly. 7.2 -
| | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Technical |




Which of the following is important for good government/contractor coordination
| | | | | | | | |


of risk management (RM)? (Select two that apply.) 6.3 - CORRECT ANSWER✔✔-
| | | | | | | | | | | |


Not: |

, Common approaches to addressing risk.
| | | |




All personnel committing to plan and execute a successful risk management (RM)
| | | | | | | | | | | |


program


Which of the following is a critical success factor to ensure effective risk
| | | | | | | | | | | | |


management (RM)? 4.1 - CORRECT ANSWER✔✔-Program Risk Process (PRP)
| | | | | | | | |


Document


Which stage of the issue management (IM) process is characterized by the
| | | | | | | | | | | |


following scenario: It has been observed that the battery used in the new
| | | | | | | | | | | | |


portable Doppler-based wind measuring system doesn't maintain a charge for
| | | | | | | | | |


long periods of time. After some study, it is determined that the issue has only a
| | | | | | | | | | | | | | | |


moderate effect on the program's success. 15.1 - CORRECT ANSWER✔✔-Not:
| | | | | | | | | |


Issue identification
|




Which of the following is a step of the Department of Defense (DoD) Risk
| | | | | | | | | | | | | |


Management Process? 3.1 - CORRECT ANSWER✔✔-Mitigation | | | | |




Which of the following are risk process planning objectives? (Select three that
| | | | | | | | | | | |


apply.) 6.1 - CORRECT ANSWER✔✔-Identifies the plan for training Integrated
| | | | | | | | | |


Product Team (IPT) members in RM techniques
| | | | | |




Ensures sound risk management (RM) principles, tools, and techniques are
| | | | | | | | | |


applied to the risk management program
| | | | |




Identifies and describes the risk management (RM) roles and responsibilities for
| | | | | | | | | | |


all program personnel
| |

Infos sur le Document

Publié le
31 mars 2026
Nombre de pages
6
Écrit en
2025/2026
Type
Examen
Contenu
Questions et réponses
12,87 €

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Lectphilip
4,0
(42)
Vendu
280
Abonnés
6
Éléments
26352
Dernière vente
5 jours de cela



Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Vous travaillez sur vos références ?

Créez des citations précises en APA, MLA et Harvard avec notre générateur de sources gratuit.

Vous travaillez sur vos références ?

Foire aux questions