Poka yoke Guides d'étude, Notes de cours & Résumés

Vous recherchez les meilleurs guides d'étude, notes d'étude et résumés sur Poka yoke ? Sur cette page, vous trouverez 140 documents pour vous aider à réviser pour Poka yoke.

Page 2 sur 140 résultats

Trier par

BMIS Final- Gonzaga University Questions And Answers Rated A+
  • BMIS Final- Gonzaga University Questions And Answers Rated A+

  • Examen • 9 pages • 2024
  • "Poka Yoke" - Japanese theory that designs a system that one cannot screw it up. (Ex. Adding a drop down box so no one can give a wrong answer) 1024 vs. 1000 - It is 1024 because 2^10=1000, which is one giggabyte. However, the full octet sum is 1024 so they figured it was close enough 4 A's of Risk - Availability Access Accuracy Agility 5- Component Framework - Hardware Software Data Procedure People Adblockers - Hide ads ASCII/Unicode - Code to know what each character is repre...
    (0)
  • €7,67
  • + en savoir plus
LSSGB - Improve Phase Questions and  Answers Already Passed
  • LSSGB - Improve Phase Questions and Answers Already Passed

  • Examen • 5 pages • 2024
  • LSSGB - Improve Phase Questions and Answers Already Passed Which of the following focuses on preventing errors from happening in the first place? A Poka-yoke Upon considering his solution, a Green Belt realized it was turning into a large and complex effort. Which of the following could make it more manageable? A Multi-Phased Implementation Before and after photos are most commonly applied when using which of the following tools? 5S Which of the following is key to successful ...
    (0)
  • €9,59
  • + en savoir plus
CPIM PART 2 PRACTICE EXAM QUESTIONS AND ANSWERS LATEST 2024.
  • CPIM PART 2 PRACTICE EXAM QUESTIONS AND ANSWERS LATEST 2024.

  • Examen • 15 pages • 2024
  • CPIM PART 2 PRACTICE EXAM QUESTIONS AND ANSWERS LATEST 2024. which of the following is the most appropriate first step in a significant organizational change? - establishing a sense of urgency that changes needed which of the following actions is most effective when load chronically exceeds average capacity - revising the master schedule continuous production processes would be most appropriate for which of the following - generation of electric power a plant refines a raw material until ...
    (0)
  • €11,51
  • + en savoir plus
CPIM Part 2 Practice Exam 2 (2024) Questions and Correct Answers
  • CPIM Part 2 Practice Exam 2 (2024) Questions and Correct Answers

  • Examen • 19 pages • 2023
  • CPIM Part 2 Practice Exam 2 (2024) Questions and Correct Answers which of the following is the most appropriate first step in a significant organizational change? - Correct Answer establishing a sense of urgency that changes needed which of the following actions is most effective when load chronically exceeds average capacity - Correct Answer revising the master schedule continuous production processes would be most appropriate for which of the following - Correct Answer generation of ele...
    (0)
  • €10,55
  • + en savoir plus
WGU C720 OA- Operations and Supply Chain Management Exam| Complete Guide with Vocabularies| 2023/ 2024 Update
  • WGU C720 OA- Operations and Supply Chain Management Exam| Complete Guide with Vocabularies| 2023/ 2024 Update

  • Examen • 49 pages • 2023
  • WGU C720 OA- Operations and Supply Chain Management Exam| Complete Guide with Vocabularies| 2023/ 2024 Update Q: Poka-yoke Answer: Mistake proofing; an approach to prevent defects, such as color-coding parts so that customers assemble the product correctly. Q: Design for Manufacture and Assembly (DFMA) Answer: Products should be designed so that they are simple and inexpensive to produce. Q: Design for Operations (DFO) Answer: Services should be simple and inex...
    (0)
  • €10,55
  • + en savoir plus
OMIS 442 Exam 2 Questions With 100% Verified Answers
  • OMIS 442 Exam 2 Questions With 100% Verified Answers

  • Examen • 16 pages • 2024
  • OMIS 442 Exam 2 Questions With 100% Verified Answers What does PDCA stand for - answerPlan, Do, Check, Act Plan - answerA change aimed at improvement Do - answerExecute the change Study/Check - answerStudy the results. Did it work? Act - answerInstitutionalize the change or abandon or do it again FADE - answerFocus Analyze Develop Execute Juran's breakthrough Sequence - answer-Proof of the need -Project Identification -Organization for Breakthrough -Diagnostic Journey -Remedial J...
    (0)
  • €11,99
  • + en savoir plus
CPIM part 2 practice exam 2 (100% Correct)
  • CPIM part 2 practice exam 2 (100% Correct)

  • Examen • 14 pages • 2024
  • which of the following is the most appropriate first step in a significant organizational change? correct answers establishing a sense of urgency that changes needed which of the following actions is most effective when load chronically exceeds average capacity correct answers revising the master schedule continuous production processes would be most appropriate for which of the following correct answers generation of electric power a plant refines a raw material until a bulk liquid che...
    (0)
  • €11,03
  • + en savoir plus
6 Sigma Green Belt Certification Exam Review practice testwith complete verified solutions 2024 latest update
  • 6 Sigma Green Belt Certification Exam Review practice testwith complete verified solutions 2024 latest update

  • Examen • 41 pages • 2024
  • ________ survey questions allow for quantitative analysis closed ended Value stream maps help identify all of the following sources of waste, bottlenecks, material & information flow, improvement opportunities Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:07 / 0:15 Full screen The Fishbone diagram is part of the ________ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle. analyze When creati...
    (0)
  • €15,83
  • + en savoir plus
Bowen Study Questions exam The Definitive Document Positively Evaluated and Expert-Endorsed 2024
  • Bowen Study Questions exam The Definitive Document Positively Evaluated and Expert-Endorsed 2024

  • Examen • 77 pages • 2024
  • nder the RCRA (Resource Conservation and Recovery Act),hazardous waste exhibits one of four characteristics: - ignitability - corrosive - reactivity - toxicity Workers compensation insurance provides: no-fault insurance to workers injured on the job Hypothermia condition caused when the body loses more heat than it can produce Strict Liability liability concept requires proof that a product was defective, the defect existed at the time the product left the defendant'...
    (0)
  • €15,35
  • + en savoir plus
OPERATIONS AND SUPPLY CHAIN MANAGEMENT C720 WGU QUESTIONS AND VERIFIED ANSWERS 2024 GRADED A.
  • OPERATIONS AND SUPPLY CHAIN MANAGEMENT C720 WGU QUESTIONS AND VERIFIED ANSWERS 2024 GRADED A.

  • Examen • 32 pages • 2024
  • OPERATIONS AND SUPPLY CHAIN MANAGEMENT C720 WGU QUESTIONS AND VERIFIED ANSWERS 2024 GRADED A. 2 / 16 1. Operations: The process used to acquire inputs, such as people, capital, andmaterial, and transform them into outputs, such as products and services. 2. Operations Manager: They allocate resources. 3. Capital: Facilities and equipment 4. Competitive Advantage: Developing capabilities that customers value, can besustained over the long-term, and competitors find difficult to replicate...
    (0)
  • €13,91
  • + en savoir plus